Home / Browse projects / Pune, Maharashtra / GODREJ SERENE

Registered Litigation declared Residential / Group Housing project

GODREJ SERENE

By Godrej Skyline Developers Limited

RG-MH-81233 · RERA P52100047405 · Last updated on MahaRERA portal: 25 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • 2 complaints at MahaRERA
  • Rs 250.00 crore secured on the land, in favour of BAJAJ HOUSING FINANCE LIMITED

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
7 of 44Construction stages doneacross 4 buildings; furthest along: Stilt Floor, 15%
191 of 557Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

GODREJ SERENE is a Residential / Group Housing project by Godrej Skyline Developers Limited in Pune, Maharashtra, registered with MahaRERA as P52100047405 on 27 Oct 2022. Possession is promised by 30 Jun 2027. 366 of the 557 units on this registration are recorded sold or booked, and 7 of 44 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameGODREJ SERENE
  • TypeResidential / Group Housing
  • Location
    • OFF PUNE MUMBAI EXPRESS HIGHWAY
    • MAMURDI
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • RERA no.P52100047405
  • ReraGenie IDRG-MH-81233

Builder

  • NameGodrej Skyline Developers Limited
  • Entity typeCompany
  • CINU45309MH2016PTC287858
  • DirectorAmandeep Singh
  • Partner 1Subhashish Jyotishchandra Pattanaik
  • Other registrations7 more →
  • Past their filed date3
  • Declared earlier projects4 →

Key dates

this monthRegisteredOct 2022PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Oct 2022
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings4 building records
  • Documents filed96 files

Current status

66%366 of 557 units booked

Figures as on 25 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER ANA232217211183
TOWER BNA232217210182
TOWER CNA232217211183
MLCP and Clubhouse-2NA80099

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Stilt Floor, at 15%.

TOWER A18%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER B18%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER C18%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
MLCP and Clubhouse-210%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor15%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
ParkingYes0%

Parking filed489

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots489
Closed/Covered489
BuildingClosed/CoveredTotal
TOWER A172172
TOWER B145145
TOWER C172172

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area13,876 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofBAJAJ HOUSING FINANCE LIMITED
Secured amountRs 250.00 crore
CERSAI search filedYes
Declared on20 Sep 2024

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI51622.32
Proposed, not sanctioned51,622 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD, GROUND FLOOR, JEHNAGIR BUILDING, MG ROAD, FORT, MUMBAI

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchitecture Collective
EngineerAnil Powar
Chartered AccountantB S R & Co. LLP
Chartered AccountantM D Deshpande & Co.
PartnerRole in project
Godrej Skyline Developers Limited-

Litigation declared1

CaseCourtStatus
593/2023/2023Pune District and Sessions CourtClosed

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC005000000269580Vijay Vitthal SaindoreGodrej Serene13/10/2023
CC005000000279845Yogesh Madhusudan TondeGodrej serene18/12/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Sep 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Serene RERA Architects Certificate Q4FY26.pdf25 Apr 2026
Form 2File: Eng_Certificate_Godrej_Serene.pdf25 Apr 2026
Form 3File: CA Certificate Serene_March_26_Signed.pdf25 Apr 2026
Disclosure of Sold and Booked InventoryFile: Godrej Serene Q4FY26 Signed.pdf25 Apr 2026
Form 1File: Arch Certificate Serene Q3 FY26.pdf24 Jan 2026
Form 2File: Engineers Certificate Serene Q3FY26.pdf24 Jan 2026
Form 3File: Godrej Serene December 25 Signed.pdf24 Jan 2026
Disclosure of Sold and Booked InventoryFile: Godrej Serene (1).pdf24 Jan 2026
Form 1File: Serene RERA Architects Certificate Q2FY26.pdf20 Oct 2025
Form 2File: Engineers Certificare Godrej serene.pdf20 Oct 2025
Form 3File: CA Cert Godrej Serene September25.pdf20 Oct 2025
Disclosure of Sold and Booked InventoryFile: Godrej Serene.pdf20 Oct 2025
Form 5 (FY 2024-2025)File: Serene Form 5 Annexure 1_compressed.pdf29 Aug 2025
Form 2File: Annexure B Godrej Serene.pdf20 Jul 2025
Form 3File: CA Certificate Godrej Serene June 25 Signed.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Godrej Serene.pdf20 Jul 2025
Form 1File: Godrej Serene RERA Architects Certificate.pdf20 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Serene.pdf1 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: S2 Phase1 Architects Certificate.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Godrej Serene CA Cert.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure B Engineering Certificate Godrej Serene.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Godrej Serene.pdf20 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Godrej Serene.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: S2-Phase1 RERA Architects Certificate.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Godrej Serene.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Serene.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Godrej Serene.pdf20 Jan 2025
CERSAI detailsFile: CERSAI Latest.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Serene Form 3.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Serene.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Godrej Serene.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Serene.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: Godrej Serene.pdf15 Oct 2024
CERSAI detailsFile: CERSAI.pdf15 Oct 2024
PAN CardFile: Pan Card New.pdf9 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Godrej Serene Form 5_compressed.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Serene.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Serene.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Godrej Serene.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MDD_Godrej Serene_Jun 2024 for signing.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate_compressed.pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MDD_Godrej Serene_Mar_24_Signed.pdf16 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Serene March,2024.pdf15 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Certificate Serene MArch,2024.pdf15 Apr 2024
Disclosure of sold/ booked inventoryFile: April 24_Disclosure of Sold-Serene signed.pdf12 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Serene - Architect's Certificate.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Serene - Enggineer's Certificate.pdf12 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Serene__Dec 23.pdf12 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293339474_For_Debtor_Based_Search_12_01_2024_11_56_49_022.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MDD_Godrej Serene_Signed.pdf12 Jan 2024
Details of encumbrances concerned to FinanceFile: Declaration _Godrej Serene.pdf20 Oct 2023
Details of encumbrances concerned to FinanceFile: Encumbrance -Godrej Serene.pdf20 Oct 2023
Details of encumbrances concerned to LegalFile: Declaration _Godrej Serene.pdf20 Oct 2023
Details of encumbrances concerned to LegalFile: Encumbrance -Godrej Serene.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SERENE - Architect Certificate.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Serene Engg Certificate.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Serene Sept23.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MDD_Godrej Serene_Signed.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Skyline - Godrej Serene.pdf21 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate S2-Serene_4_11zon.pdf20 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAHARERA Engineers Certificate - Form 2 - Serene - 20230630_2_11zon.pdf20 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Serene__Jul-23.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MDD_Godrej Serene-Signed.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MDD_Godrej Serene-OMD.PDF19 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate S2-Phase1.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Serene.pdf15 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assuarance Certificate Serene.pdf15 Apr 2023
Disclosure of sold/ booked inventoryFile: Serene - Disclosure of sold inventory.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Serene Architect Certificate.pdf20 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Serene Engineer Certificate.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD_Serene-Dec'22.pdf20 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Godrej Serene.pdf20 Jan 2023
Details of encumbrances concerned to LegalFile: 1 b Details of encumbrances concerned to Legal (15).pdf18 Oct 2022
Proforma of Allotment letterFile: Godrej Serene_ RESIDENTIAL AFS DRAFT__Proforma.pdf18 Oct 2022
Proforma of Agreement for saleFile: Godrej Serene_ RESIDENTIAL AFS DRAFT__Proforma.pdf18 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf28 Sep 2022
Building plan approvalFile: BUILDING PLAN.pdf22 Sep 2022
Layout approvalFile: LAYOUT PLAN.pdf22 Sep 2022
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf22 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN.pdf22 Sep 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
GODREJ PARK GREENSPUNE1,190CompletedMar 2023Late, Mar 2024

How this compares with Pune

66%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GODREJ SERENE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAMURDI13,700+ in Pune

Builder: Godrej Skyline Developers Limited

Godrej Skyline Developers Limited has 8 registrations on MahaRERA, including Godrej Park Greens and Godrej Nurture. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GODREJ SERENE is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GODREJ SERENE?

The registered promoter entity is Godrej Skyline Developers Limited, a company as per the filing. Its CIN U45309MH2016PTC287858 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GODREJ SERENE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GODREJ SERENE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GODREJ SERENE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GODREJ SERENE?

The professionals named in the filing: Architect: Architecture Collective; Engineer: Anil Powar; Chartered Accountant: B S R & Co. LLP; Chartered Accountant: M D Deshpande & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GODREJ SERENE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GODREJ SERENE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GODREJ SERENE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.