Home / Browse projects / Pune, Maharashtra / GINI VIVANTE PHASE 03

Registered Litigation declared Others project

GINI VIVANTE PHASE 03

By Gini Citicorp Realty LLP

RG-MH-19579 · RERA P52100078531 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 6 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
4 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 40%
281 of 334Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 179 documents Report an error

GINI VIVANTE PHASE 03 is a Others project by Gini Citicorp Realty LLP in Pune, Maharashtra, registered with MahaRERA as P52100078531 on 21 Dec 2024. Possession is promised by 31 Dec 2028. 53 of the 334 units on this registration are recorded sold or booked, and 4 of 22 construction stages are filed complete.

At a glance

Project

  • NameGINI VIVANTE PHASE 03
  • TypeOthers
  • Location
    • Pune
    • Pune City
    • Kiwale
    • Haveli
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100078531
  • ReraGenie IDRG-MH-19579

Builder

  • NameGini Citicorp Realty LLP
  • Entity typePartnership
  • GSTIN27AAJFG4973H1Z1
  • PartnersGautam Vinod Harlalka, Manish Vinod Harlalka, Pranav Deepak Harlalka, Deepak Vishwanath Harlalka, Vinod Sewaram Harlalka, Karan Deepak Harlalka, Gautam Vinod Harlalka, Pranav Deepak Harlalka, Vinod Sewaram Harlalka, Manish Vinod Harlalka, Karan Deepak Harlalka, Deepak Vishwanath Harlalka
  • Other registrations7 more →
  • Completed3 of 8
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredDec 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Dec 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed179 files

Current status

16%53 of 334 units booked
45.7%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building A4 NA232115712169
Building - A5 part NA232115312165

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 40%.

Building A423%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)40%
Plinth100%
Stilt Floor0%
Slabs of Super Structure17%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building - A5 part22%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)20%
Plinth100%
Stilt Floor10%
Slabs of Super Structure12%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed140

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots140
Closed/Covered140
BuildingClosed/CoveredTotal
Building A49696
Building - A5 part4444

Land and ownership62

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,024 sq m
Land owned byThe promoter, with other names on the file
Named landowners62
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Jul 2025
LandownerVillageDistrict
Arjun Savleram GaikwadKivalePune
Balwalkar Housing SchemesKivalePune
PRAVIN TUKARAM GAIKWADKivalePune
Aboli Pravin GaikwardKiwalePune
Aditya Pravin GaikwardKiwalePune
Rohini Vijay RokdeKiwalePune
Vinay Vijay RokdeKiwalePune
Ranjana Vilas RokdeKiwalePune
Bhagyashree Ajit GaikwadKiwalePune
Rohit Vilas RokdeKiwalePune
Hemangi Prakash JadhavKiwalePune
Archana Vilas RokdeKiwalePune
Rajesh Jeevan UttamchandaniWAGHOLIPune
Shubangi Durgaprasad BhovteKiwalePune
Amit Arun RokdeKiwalePune
Asha Arun RokdeKiwalePune
Bharti Sudhir RokdeKiwalePune
Pravin Dadabhau GaikwadKivalePune
Neeta Sudhir RokdeKiwalePune
Nikita Sudhir RokdeKivalePune
Yashwant Bapu ChavanKivalePune
Ashwini Yashwant ChavanKivalePune
Abhishekh Sudhir RokdeKivalePune
Prashant Yashwant ChavanKivalePune
Shilndra Tukaram GaikwadKivalePune
Sunil Shankar GaikwadKivalePune
Pradnya Pravin GaikwadKivalePune
Tahanubai Shankar GaikwadKivalePune
Savita Rahul GaikwadKivalePune
Sangeet Sanjay GaikwadKivalePune
VIJAY NARAYAN GAIKWADKivalePune
VIJAY KUNDLIK ROKADEKivalePune
VILAS KUNDALIK ROKDEKivalePune
ARUN KUNDALIK ROKDEKivalePune
SUDHIR KUNDLIK ROKADEKivalePune
Rakhee Vikas GaikwadKivalePune
Kusum Kanchan GarudKivalePune
Sangeet Santosh GaikwadKivalePune
RAVI SADASHIV BHOSALEKivalePune
KUNAL RAVI BHOSALEKivalePune
SHUBHAM RAVI BHASALEKivalePune
PUSHPA MARUTI GAIKWADKivalePune
ANITA ARUN KAMBLEKivalePune
KALPANA ULHAS KAMBLEKivalePune
JANABAI ARJUN GAIKWADKivalePune
DEEPALI MARUTI GAIKWADKivalePune
PRASHANT MARUTI GAIKWADKivalePune
MAYUR MARUTI GAIKWADKivalePune
RAVINDRA ARJUN GAIKWADKivalePune
RAHUL ARJUN GAIKWADKivalePune
VIKAS MARUTI GAIKWADKivalePune
SUDHIR SANJAY GAIKWADKivalePune
SUNITA VIJAY VISHWAKARMAKivalePune
SUWARNA LAXMAN JADHAVKivalePune
SANTOSH ARJUN GAIKWADKivalePune
SANDHYA VASANT MOREKivalePune
MANGAL DADU KADAMKivalePune
ANJANABAI TUKARAM GAIKWADKivalePune
SHEELA PRAVIN KAMBLEKivalePune
SUNITA SANDEEP SASANEKivalePune
Tushar Yashwant ChavanKivalePune
SHOBHA YASHWANT ChavanKivalePune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI51982.04
Proposed, not sanctioned30,526 sq m
Buildings approved3
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch.5 C/ II, MITTAL COURT,224, NARIMAN POINT,MUMBAI - 400 021
Estimated costRs 41.60 cr
Cost incurredRs 19.02 cr
Work done45.73%
BuildingWingEstimatedIncurred
Building - A5 partNARs 18.63 crRs 7.53 cr
Building A4NARs 17.98 crRs 9.21 cr
-NARs 4.99 crRs 2.28 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCUBIX Architects Associates
EngineerSiddharth N Shitole
Chartered AccountantPatel & Sharma
Chartered AccountantAgarwal Sarawgi and Associates
Chartered AccountantPatel and Sharma
Chartered AccountantDipali Shelar & company
PartnerRole in project
Gini Citicorp Realty LLP-

Litigation declared6

CaseCourtStatus
1729/2018FIFTEENTH JOINT CJSD AND ADDL CJM PUNEClosed
636/2021FOURTEENTH JOINT CJSD AND ADDL CJM PUNEOngoing
660/2022FIRST CIVIL JUDGE SR DIV PUNEOngoing
713/2022FIRST CIVIL JUDGE SR DIV PUNEOngoing
1020/2017ADDL COLLECTOR PUNEClosed
2231/2023ONE FOUR ONE NINETH JOINT CJSD AND ADD CJM PUNEClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Aug 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 May 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Aug 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed179

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 179 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: GV03 FORM 1 MAR 26.pdf24 Apr 2026
Withdrawal Update Form 2File: GV03 FORM 2 MARCH 26.pdf24 Apr 2026
Withdrawal Update Form 3File: GV03 FORM 3 MAR 26_compressed.pdf24 Apr 2026
Withdrawal Update Form 1File: GV03 FORM 1 DEC.pdf5 Feb 2026
Withdrawal Update Form 2File: GV03 FORM 2 DEC.pdf5 Feb 2026
Withdrawal Update Form 3File: GV03 FORM 3 DEC.pdf5 Feb 2026
Withdrawal Update Form 1File: GIni Vivante Ph 03 Form 1 Sep 25.pdf28 Nov 2025
Withdrawal Update Form 2File: GIni Vivante Ph 03 Form 2 Sep 25.pdf28 Nov 2025
Withdrawal Update Form 3File: Signed GV 03 FORM 3 290925.pdf28 Nov 2025
Withdrawal Update Form 1File: G V03 Form 1 June 25.pdf1 Oct 2025
Withdrawal Update Form 2File: G V03 Form 2 June 25.pdf1 Oct 2025
Withdrawal Update Form 3File: Signed GV 03 FORM 3 290925.pdf1 Oct 2025
Form 5 (FY 2024-2025)File: GV 03 FORM 5 24-25.pdf30 Sep 2025
Building plan approvalFile: 01 1-41 Lay Out Copy.pdf29 Aug 2025
Building plan approvalFile: 23-41 A4 1st Floor Copy.pdf29 Aug 2025
Building plan approvalFile: 24-41 A4 2nd Floor.pdf29 Aug 2025
Building plan approvalFile: 25-41 A4 Refuge Floor.pdf29 Aug 2025
Building plan approvalFile: 26-41A4.pdf29 Aug 2025
Building plan approvalFile: 27-41 A5 1st Floor.pdf29 Aug 2025
Building plan approvalFile: 28-41 A5 2nd Floor.pdf29 Aug 2025
Building plan approvalFile: 29-41 A5 refuge Floor.pdf29 Aug 2025
Building plan approvalFile: 30-41 A5.pdf29 Aug 2025
Form 2A (FY 2024-2025)File: Form 2A- QA GV03 24-25.pdf16 Aug 2025
Form 1File: GV 03 FORM 1 DEC 24.pdf11 Aug 2025
Form 2File: GV 03 FORM 2 DEC 24_compressed to be uploded.pdf11 Aug 2025
Form 3File: GV 03 FORM 3 DEC 24_compressed to be uploaded.pdf11 Aug 2025
Disclosure of Sold and Booked InventoryFile: GV 03 SOLD UNSOLD DEC 24.pdf11 Aug 2025
Disclosure of Sold and Booked InventoryFile: GV 03.pdf11 Aug 2025
Form 1File: GV 03 FORM 1 310325.pdf11 Aug 2025
Form 2File: GV 03 FORM 2 310325.pdf11 Aug 2025
Form 3File: GV 03 FORM 3 310325.pdf11 Aug 2025
Building plan approvalFile: Part2 - Lower ground Floor.pdf31 Jul 2025
Building plan approvalFile: Part3 - Ground Floor.pdf31 Jul 2025
Building plan approvalFile: Part4 - UG.pdf31 Jul 2025
Building plan approvalFile: Part5 -A 1.pdf31 Jul 2025
Building plan approvalFile: Part6 - A4.pdf31 Jul 2025
Building plan approvalFile: Part7 - A4.pdf31 Jul 2025
Building plan approvalFile: Part8 - A4.pdf31 Jul 2025
Building plan approvalFile: Part9 - A5.pdf31 Jul 2025
Building plan approvalFile: Part10 - A3.pdf31 Jul 2025
Building plan approvalFile: Part11 - A3.pdf31 Jul 2025
Building plan approvalFile: Part12 - A3.pdf31 Jul 2025
Building plan approvalFile: Part13 - A3.pdf31 Jul 2025
Building plan approvalFile: Part14 - A3.pdf31 Jul 2025
Building plan approvalFile: Part15 - B1 Mhada.pdf31 Jul 2025
Building plan approvalFile: Part16 - B1 Mhada.pdf31 Jul 2025
Building plan approvalFile: Part17- Club House.pdf31 Jul 2025
Building plan approvalFile: Part18 - Club House.pdf31 Jul 2025
Building plan approvalFile: Part19- A4 Wing 1st Floor Plan.pdf31 Jul 2025
Building plan approvalFile: Part20- A2 Wing.pdf31 Jul 2025
Building plan approvalFile: Part21- A3 Wing.pdf31 Jul 2025
Building plan approvalFile: Part22- A5 Wing.pdf31 Jul 2025
Building plan approvalFile: Part23 - A1 Wing.pdf31 Jul 2025
Building plan approvalFile: Part24- A1 Wing.pdf31 Jul 2025
Building plan approvalFile: Part25 - A1 Wing.pdf31 Jul 2025
Building plan approvalFile: Part26 - A2 Wing.pdf31 Jul 2025
Building plan approvalFile: Part27 - A2 Wing.pdf31 Jul 2025
Building plan approvalFile: Part28 - A2 Wing.pdf31 Jul 2025
Building plan approvalFile: Part29 - A5 Wing.pdf31 Jul 2025
Building plan approvalFile: Part30 - A7 Wing.pdf31 Jul 2025
Building plan approvalFile: Part31 - A7 Wing.pdf31 Jul 2025
Building plan approvalFile: Part32 - A7 Wing.pdf31 Jul 2025
Building plan approvalFile: Part33 - A7 Wing.pdf31 Jul 2025
Building plan approvalFile: Part34 - A11 Wing.pdf31 Jul 2025
Building plan approvalFile: Part35 - A11 Wing.pdf31 Jul 2025
Building plan approvalFile: Part36 - A11 Wing.pdf31 Jul 2025
Building plan approvalFile: Part37 - A12 Wing.pdf31 Jul 2025
Building plan approvalFile: Part38 - A12 Wing.pdf31 Jul 2025
Building plan approvalFile: Part39 - A12 Wing.pdf31 Jul 2025
Building plan approvalFile: Part40 - Elevation Plan.pdf31 Jul 2025
Building plan approvalFile: Part2 - Lower ground Floor.pdf31 Jul 2025
Building plan approvalFile: Part3 - Ground Floor.pdf31 Jul 2025
Building plan approvalFile: Part4 - UG.pdf31 Jul 2025
Building plan approvalFile: Part6 - A4.pdf31 Jul 2025
Building plan approvalFile: Part7 - A4.pdf31 Jul 2025
Building plan approvalFile: Part8 - A4.pdf31 Jul 2025
Building plan approvalFile: Part9 - A5.pdf31 Jul 2025
Building plan approvalFile: Part17- Club House.pdf31 Jul 2025
Building plan approvalFile: Part18 - Club House.pdf31 Jul 2025
Building plan approvalFile: Part19- A4 Wing 1st Floor Plan.pdf31 Jul 2025

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered late2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
GINI VIVANTE PHASE 02P52100050601KIWALE, Pune621Apr 2023OngoingDec 2027Not due yet
GINI VIVANTE PHASE 01P52100034447VILLAGE KIWALE, Pune539Apr 2022OngoingDec 2026Not due yet
Harlalka HeightsSitaram Poddar Marg Fanaswadi36-CompletedMay 2017Late, Jun 2017
Gini Viviana Phase 1Survey No 38-1 Balewadi191-CompletedMay 2016Late, May 2017
Gini Bellina Phase 1off Porwal Road Lohegaon140-CompletedJan 2014Late, Mar 2015

How this compares with Pune

16%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GINI VIVANTE PHASE 03 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pune City13,700+ in Pune

2 kmGINI VIVANTE PHASE 03Completed 86Lapsed / revoked 48Other 113Dot size: filed unitsN

Filed coordinates, straight-line distance. 247 registered projects within 2 km.

Builder: Gini Citicorp Realty LLP

Gini Citicorp Realty LLP has 8 registrations on MahaRERA, including Gini Viviana F Bldg Phase 2 and GINI BELVISTA - PHASE I. Its filings disclose 5 earlier MahaRERA projects: declares 0 of 3 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GINI VIVANTE PHASE 03 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GINI VIVANTE PHASE 03?

The registered promoter entity is Gini Citicorp Realty LLP, a partnership as per the filing. Its GSTIN 27AAJFG4973H1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GINI VIVANTE PHASE 03?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GINI VIVANTE PHASE 03?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GINI VIVANTE PHASE 03?

The professionals named in the filing: Architect: CUBIX Architects Associates; Engineer: Siddharth N Shitole; Chartered Accountant: Patel & Sharma; Chartered Accountant: Agarwal Sarawgi and Associates; Chartered Accountant: Patel and Sharma; Chartered Accountant: Dipali Shelar & company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GINI VIVANTE PHASE 03?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GINI VIVANTE PHASE 03. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GINI VIVANTE PHASE 03 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.