Red flags

  • Litigation declared, 16 cases
  • Rs 50.00 crore secured on the land, in favour of IndusInd Bank

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 6 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 80%
201 of 214Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

GANGA LEGEND BUILDING B7 is a Residential / Group Housing project by Legends County Landmark Pvt Ltd in Pune, Maharashtra, registered with MahaRERA as P52100076968 on 10 Jul 2024. Possession is promised by 31 Dec 2028. 13 of the 214 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameGANGA LEGEND BUILDING B7
  • TypeResidential / Group Housing
  • Location
    • DSK RANWARA RD
    • BAVDHAN
    • Bavadhan BK
    • Mulshi
    • Pune
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100076968
  • ReraGenie IDRG-MH-18038

Builder

  • NameLegends County Landmark Pvt Ltd
  • Entity typeCompany
  • CINU45403PN2018PTC174806
  • GSTIN27AAHCG1862A1ZX
  • DirectorsJAIPRAKASH SITARAM GOEL, Amit Jaiprakash Goel
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredJul 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Jul 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed70 files

Current status

6%13 of 214 units booked
0.1%Work done, per cost certificate

Figures as on 23 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GANGA LEGEND BUILDING B7NA30272140214

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 80%.

GANGA LEGEND BUILDING B7: 7% average across the applicable activities

ActivityProgress
Excavation80%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed225

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots225
Closed/Covered225

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,297 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofIndusInd Bank
Secured amountRs 50.00 crore
CERSAI search filedYes
Declared on1 Aug 2025
LandownerVillageDistrict
GANGA SAGAR CO-OPERATIVE HOUSING SOCIETY LTDBavadhan BKPune

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI33149.89
Proposed, not sanctioned33,150 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch2401, GENERAL THIMAYYA ROAD, CANTONMENT, PUNE
Estimated costRs 115.44 cr
Cost incurredRs 5.94 lakh
Work done0.05%
BuildingWingEstimatedIncurred
GANGA LEGEND BUILDING B7NARs 115.44 crRs 5.94 lakh

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR PRAKASH KULKARNI
ArchitectANKUR ASSOCIATES
EngineerSUDHIR AGRAWAL
EngineerG. A. Bhillare
EngineerAmit Bedake
Chartered AccountantSANJAYKUMAR SHAH
Chartered AccountantSachin Gogave & Co LLP
Chartered AccountantSayali Dighe & Associates
Chartered AccountantSachin Chordiya
PartnerRole in project
Legends County Landmark Pvt Ltd-

Litigation declared16

CaseCourtStatus
482/2023CJSD PUNEOngoing
21/2017ADDNL COMMISSIONER PUNEOngoing
1338/2007CJSDOngoing
880/2012CJSD PUNEOngoing
1300/2012CJSD PUNEOngoing
1192/2012CJSD PUNEOngoing
1025/2012CJSD PUNEOngoing
50/2023CJSD PUNEOngoing
903/2020HIGH COURT MUMBAIOngoing
3282/2019HIGH COURT MUMBAIOngoing
4163/2019HIGH COURT MUMBAIOngoing
470/2019CJSD PUNEOngoing
1119/2020HIGH COURT MUMBAIOngoing
4614/2023HIGH COURT MUMBAIOngoing
1594/2023CJSD PUNEOngoing
1338/2007CJSDOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 (B7).pdf23 Jun 2026
Withdrawal Update Form 2File: Form 2 - B7.pdf23 Jun 2026
Withdrawal Update Form 3File: Form 3 (B7 Ganga Legend Final).pdf23 Jun 2026
Withdrawal Update Form 1File: Form 1 Architects Certificate Ganga Legend B7 Dec 2025.pdf23 Jan 2026
Withdrawal Update Form 2File: Form 2 EngineerCertificate Ganga Legend B7 Dec 2025.pdf23 Jan 2026
Withdrawal Update Form 3File: Form 3 CA Certificate B7 Dec 2025.pdf23 Jan 2026
Withdrawal Update Form 1File: 1 Form 1 - Architectu0027s Certificate Ganga Legend B7 Sept 2025.pdf15 Nov 2025
Withdrawal Update Form 2File: 2 Form 2 - Engineeru0027s Certificate Ganga Legend B7 Sept 2025.pdf15 Nov 2025
Withdrawal Update Form 3File: Form 3 B7 Sept 2025.pdf15 Nov 2025
Withdrawal Update Form 1File: 1 Form 1 - Architectu0027s Certificate Ganga Legend B7 Sept 2025.pdf4 Nov 2025
Withdrawal Update Form 1File: 1 Form 1 - Architectu0027s Certificate Ganga Legend B7 Sept 2025.pdf4 Nov 2025
Withdrawal Update Form 1File: 1 Form 1 - Architectu0027s Certificate Ganga Legend B7 Sept 2025.pdf4 Nov 2025
Withdrawal Update Form 2File: 2 Form 2 - Engineeru0027s Certificate Ganga Legend B7 Sept 2025.pdf4 Nov 2025
Withdrawal Update Form 2File: 2 Form 2 - Engineeru0027s Certificate Ganga Legend B7 Sept 2025.pdf4 Nov 2025
Withdrawal Update Form 2File: 2 Form 2 - Engineeru0027s Certificate Ganga Legend B7 Sept 2025.pdf4 Nov 2025
Withdrawal Update Form 3File: Form 3 B7 Sept 2025.pdf4 Nov 2025
Withdrawal Update Form 3File: Form 3 B7 Sept 2025.pdf4 Nov 2025
Withdrawal Update Form 3File: Form 3 B7 Sept 2025.pdf4 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 B7 2024-25.pdf15 Sep 2025
Withdrawal Update Form 1File: FORM 1 B7.pdf5 Sep 2025
Withdrawal Update Form 2File: FORM 2 B7.pdf5 Sep 2025
Withdrawal Update Form 3File: FORM 3 B7.pdf5 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3B7 March 2025.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 B7.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 B7.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: B7 FORM 1.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: B7 FORM 2.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 B7.pdf12 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Architect's Certificate Ganga Legend B7 December 2024.pdf11 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Engineer's Certificate Ganga Legend B7 December 2024.pdf11 Feb 2025
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE (FORMAT D).pdf8 Jul 2024
Copy of the legal title reportFile: Legal Title report as on 25-06-2024_F_compressed.pdf4 Jul 2024
Copy of the legal title reportFile: Format A - SUPPLEMENTARY LEGAL TITLE REPORT.pdf4 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3 GANGA LEGEND B7 02-072024.pdf2 Jul 2024
Proforma of Agreement for saleFile: Agreement to Sale B7 28-06-2024.pdf28 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Clauses comparison with Model Clauses B7 28-06-2024.pdf28 Jun 2024
Other - TechnicalFile: Order 50 Annexure A.pdf28 Jun 2024
Declaration in FORM BFile: Declaration Form B B7 GGIPL.pdf27 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest Atul Sir-1-0.pdf27 Jun 2024
Proforma of Allotment letterFile: Format Allotment Letter - on letter head sign stamp.pdf27 Jun 2024
Other - LegalFile: ORDER OF AMALGAMATION 10-08-2017 highlighted.pdf27 Jun 2024
Other - TechnicalFile: Gmail Village -Bavdhan.pdf21 Jun 2024
Building plan approvalFile: 10 SHEET NO 24 B5 B7 BLDG.pdf19 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 10 SHEET NO 24 B5 B7 BLDG.pdf19 Jun 2024
Layout approvalFile: PLOT AREA ON APPROVED LAYOUT FINAL.pdf17 Jun 2024
Copy of Layout Approval (in case of layout)File: PLOT AREA ON APPROVED LAYOUT FINAL.pdf17 Jun 2024
CERSAI detailsFile: (6)undertaking about no cersal.pdf17 Jun 2024
Layout approvalFile: 5 COPY OF LAYOUT APPROVAL.pdf15 Jun 2024
Building plan approvalFile: 6 SHEET NO 20 B5 B7 BLDG.pdf15 Jun 2024
Building plan approvalFile: 7 SHEET NO 21 B5 B7 BLDG.pdf15 Jun 2024
Building plan approvalFile: 8 SHEET NO 22 B5 B7 BLDG.pdf15 Jun 2024
Building plan approvalFile: 9 SHEET NO 23 B5 B7 BLDG.pdf15 Jun 2024
PAN CardFile: 1 PAN CARD GGIPL.pdf15 Jun 2024
Details of encumbrances concerned to FinanceFile: 3 Details of encumbrances.pdf15 Jun 2024
Details of encumbrances concerned to FinanceFile: 4 litigation Encumbrance Certificate.pdf15 Jun 2024
Details of encumbrances concerned to LegalFile: 3 Details of encumbrances.pdf15 Jun 2024
Details of encumbrances concerned to LegalFile: 4 litigation Encumbrance Certificate.pdf15 Jun 2024
Copy of Layout Approval (in case of layout)File: 5 COPY OF LAYOUT APPROVAL.pdf15 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 6 SHEET NO 20 B5 B7 BLDG.pdf15 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 7 SHEET NO 21 B5 B7 BLDG.pdf15 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 8 SHEET NO 22 B5 B7 BLDG.pdf15 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 9 SHEET NO 23 B5 B7 BLDG.pdf15 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: 11 COMMENCEMENT CERTIFICATE.pdf15 Jun 2024
CERSAI detailsFile: 16 CERSAI REPORT.pdf15 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 18a disclosure on interest on other real estate organisation.pdf15 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 18b disclosure on interest on other real estate organisation.pdf15 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 21 Declaration about seperate bank account.pdf15 Jun 2024
Deviation Report with respect to Allotment letterFile: 22 undertaking about deviation report for allotement letter.pdf15 Jun 2024
Other - LegalFile: 1 Merged 7-12_compressed.pdf15 Jun 2024
Other - TechnicalFile: (4)Declaration about Project Plot area.pdf15 Jun 2024

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
GANGA LEGEND A2 AND B4P52100021020BAVDHAN, Pune272May 2019CompletedDec 2023Dec 2023
GANGA GLITZSurvey No 16 P AND Survey No 17 P Village Undri Taluka Haveli District Pune 411 060192-CompletedApr 2018Apr 2017
GANGA ARCADIASR NO 22 Hissa No 2 Village Kharadi Taluka Haveli District Pune 41101428-CompletedJun 2017Jun 2017
GANGA ARCADIASurvey No. 22 Hissa No 2 situated at Village Kharadi Taluka Haveli District Pune 411 014120-CompletedDec 2015Oct 2015
GANGA SPARSHSurvey No 16Pand 17 P Village Undri Taluka Haveli District Pune154-CompletedApr 2014Nov 2013
AMRUTGANGAVADGAON BK PUNE611-CompletedDec 2013Oct 2013

How this compares with Pune

6%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GANGA LEGEND BUILDING B7 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BAVDHAN13,700+ in Pune

2 kmGANGA LEGEND BUILDING B7Completed 25Lapsed / revoked 14Other 39Dot size: filed unitsN

Filed coordinates, straight-line distance. 78 registered projects within 2 km.

Builder: Legends County Landmark Pvt Ltd

Legends County Landmark Pvt Ltd has 3 registrations on MahaRERA, including GANGA LEGEND BUILDING A1 and GANGA LEGEND B5 BUILDING. Its filings disclose 6 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GANGA LEGEND BUILDING B7 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GANGA LEGEND BUILDING B7?

The registered promoter entity is Legends County Landmark Pvt Ltd, a company as per the filing. Its CIN U45403PN2018PTC174806 and GSTIN 27AAHCG1862A1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GANGA LEGEND BUILDING B7?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GANGA LEGEND BUILDING B7?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GANGA LEGEND BUILDING B7?

The professionals named in the filing: Architect: AR PRAKASH KULKARNI; Architect: ANKUR ASSOCIATES; Engineer: SUDHIR AGRAWAL; Engineer: G. A. Bhillare; Engineer: Amit Bedake; Chartered Accountant: SANJAYKUMAR SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GANGA LEGEND BUILDING B7?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GANGA LEGEND BUILDING B7. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GANGA LEGEND BUILDING B7 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.