Red flags

  • Litigation declared, 18 cases
  • 2 complaints at MahaRERA

Clear

  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 5 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
16 of 44Construction stages doneacross 4 buildings; furthest along: Internal walls, 96%
2Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

GANGA LEGEND A2 AND B4 is a Residential / Group Housing project by GOEL GANGA INDIA PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100021020 on 27 May 2019. The registration is recorded completed; possession was promised by 31 Dec 2023. 2 complaints are on record with the regulator.

At a glance

Project

  • NameGANGA LEGEND A2 AND B4
  • TypeResidential / Group Housing
  • Location
    • DSK RANWARA ROAD RAMNAGAR
    • BAVDHAN
    • Bavadhan BK
    • Mulshi
    • Pune
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100021020
  • ReraGenie IDRG-MH-93076

Builder

  • NameGOEL GANGA INDIA PVT LTD
  • Entity typeCompany
  • CINU45400PN2016PTC167107
  • DirectorsJAIPRAKASH SITARAM GOEL, Amit Jaiprakash Goel
  • Other registrations23 more →
  • Completed6 of 24
  • No longer live10 lapsed, de-registered or revoked
  • Declared earlier projects8 →

Key dates

this monthRegisteredMay 2019PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 May 2019
  • Promised completion31 Dec 2023
  • Revised completionNone
  • Buildings4 building records
  • Documents filed69 files

Current status

74.1%Work done, per cost certificate

Figures as on 27 Nov 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A2 1-11 FLOORSNA1515000
A2 12-23 FLOORSNA120000
B4 1-11 FLOORSNA150000
B4 12-23 FLOORSNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 27 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 96%.

A2 1-11 FLOORS75%
ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)47%
Plinth70%
Stilt Floor76%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises54%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks77%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.84%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.67%
A2 12-23 FLOORS88%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises86%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks84%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.86%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%
B4 1-11 FLOORS82%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)53%
Plinth80%
Stilt Floor77%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96%
Sanitary Fittings within the flats / premises76%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks93%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.87%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%
B4 12-23 FLOORS89%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises89%
Sanitary Fittings within the flats / premises54%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.61%

Progress on shared amenities15

As on 27 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes15%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes76%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
A2 1-11 FLOORS11
B4 1-11 FLOORS11

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,528 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Oct 2024
LandownerVillageDistrict
GULAB NAMDEO DAGADE AND OTHERSBavadhan BKPune

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI21386.29
Proposed, not sanctioned21,386 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGENERAL THIMMAYYA ROAD CANTONMENT PUNE 411001 MAHARASHTRA
Estimated costRs 81.91 cr
Cost incurredRs 60.73 cr
Work done74.14%
BuildingWingEstimatedIncurred
B4 1-11 FLOORSNARs 28.70 crRs 22.80 cr
B4 12-23 FLOORSNARs 19.13 crRs 13.55 cr
A2 1-11 FLOORSNARs 18.50 crRs 13.92 cr
A2 12-23 FLOORSNARs 12.70 crRs 9.61 cr
-NARs 2.88 crRs 84.59 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectChandrashekhar Design Inc
ArchitectANKUR ASSOCIATES
EngineerSudhir
EngineerSHAM MADANE
Chartered AccountantR S A R & Associates
Chartered AccountantSachin Gogave & Co LLP
Chartered AccountantSayali Dighe & Associates
Chartered AccountantANIKET SOLANKI AND CO
PartnerRole in project
Legends County Landmark Pvt Ltd-

Litigation declared18

CaseCourtStatus
482/2023CJSD PUNEPENDING
21/2017ADDITIONAL COMMISSIONERPENDING
1338/2007CJSD PUNEPENDING
880/2012CJSD PUNEPENDING
1300/2012CJSD PUNEPENDING
1192/2012CJSD PUNEPENDING
1025/2012CJSD PUNEPENDING
50/2023CJSDPENDING
1594/2023CJSD PUNEPENDING
903/2020HIGH COURT MUMBAIPENDING
3282/2019HIGH COURT MUMBAIPENDING
4163/2019HIGH COURT MUMBAIPENDING
470/2019CJSDPENDING
1119/2020HIGH COURT MUMBAIPENDING
4614/2023HIGH COURT MUMBAIPENDING
39/2015NGTDISPOSED OFF
116/2018NGTDISPOSED OFF
1338/2007CJSDOngoing

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC005000000279710Goel Ganga India Private LimitedUzzair Mohammed Ishraque Khan06/11/2023
CC005000000279711Goel Ganga India Private LimitedMohammed Adnan Khan06/11/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 26 Dec 2023

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: RERA FORM 4 GANGA LEGEND A2 B4.pdf27 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: 1 Other - Technical (1).pdf13 Nov 2024
Other - TechnicalFile: RERA FORM 4 GANGA LEGEND A2 B4 21-12-23.pdf18 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A2 BLDG COMPLETION CERTIFICATE 16 12 2023.pdf26 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: B4 BLDG COMPLETION CERTIFICATE 16 12 2023.pdf26 Dec 2023
Certificates of CA (Form 3)File: A2 AND B4 FORM 3_compressed (1).pdf7 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Form 1 Architect's Certificate Legend A2,B4 Sept 2023 signed.pdf26 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Form 2 Engineer's Certificate Legend A2,B4 Sept 2023 signed.pdf26 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate for RERA Legend A2 B4 June 23.pdf17 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's certificate for RERA Legend A2 B4 June 23.pdf17 Jul 2023
Certificates of CA (Form 3)File: GANGA LEGEND PHASE A2 AND B4 FORM 3 - 310323_.pdf1 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Legend A2B4 -CORRECTED.pdf21 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Legend A2B4.pdf14 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Legend A2 B4.pdf14 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate A2 B4.pdf11 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Arch Certificate A2 B4.pdf11 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate A2 B4.pdf11 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate Bldg A2 B4.pdf18 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Bldg A2 B4.pdf18 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GOEL GANGA RERA_compressed.pdf8 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG LEGEND A2 B4.pdf8 Jul 2022
Proforma of Allotment letterFile: A2 - RERA AGREEMENT - GANGA LEGEND.pdf14 Jun 2022
Proforma of Allotment letterFile: B4 - RERA AGREEMENT - GANGA LEGEND.pdf14 Jun 2022
Disclosure of sold/ booked inventoryFile: DISCLOSURE ON SOLD UNSOLD INVENTORY AS ON 31032022.pdf23 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 -- LEGEND A2,B4 -- 18-19.pdf23 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 -- LEGEND A2,B4 -- 19-20.pdf23 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 -- LEGEND A2,B4 -- 20-21.pdf23 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert - Legend - A2, B4.pdf15 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engg cert - elegend A2 b4.pdf15 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: quality - legend a2 b4.pdf15 Apr 2022
Layout approvalFile: Sheet No 1_compressed-compressed.pdf5 Mar 2022
Building plan approvalFile: Sheet No 1_compressed-compressed.pdf5 Mar 2022
Building plan approvalFile: Sheet No 1_compressed-compressed.pdf5 Mar 2022
Copy of the legal title reportFile: Title Certificate10112020.pdf5 Mar 2022
Copy of Layout Approval (in case of layout)File: Sheet No 1_compressed-compressed.pdf5 Mar 2022
Building Plan Approval (IOD)File: Sheet No 1_compressed-compressed.pdf5 Mar 2022
Building Plan Approval (IOD)File: Sheet No 1_compressed-compressed.pdf5 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE-655(1)-compressed.pdf5 Mar 2022
OtherFile: Ganga Legend A2 B4 - Consent of Allotee.pdf16 Feb 2022
Declaration about Commencement CertificateFile: Ganga Legend A2 B4 - Declaration.pdf28 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ganga Legend A2 B4- FORM 1- SEP 2021.pdf28 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ganga Legend A2 B4- SEP 2021 ENGINEER CERTIFICATE.pdf28 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Ganga Legend A2 B4- 2A.pdf28 Nov 2021
Details of encumbrancesFile: LEGEND Encumbrance CertificateAdv VasteDated11112020.pdf27 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LEGEND A2 B4.pdf16 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LEGEND A2 B4.pdf16 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LEGEND A2 B4.pdf16 Aug 2019
Form 2AFile: FORM 2A LEGEND A2 B4 RCC.pdf15 Jul 2019
Building plan approvalFile: LEGEND A2 PLAN 1.pdf23 May 2019
Building plan approvalFile: LEGEND A2 PLAN 2.pdf23 May 2019
Building plan approvalFile: LEGEND B4 (1).pdf23 May 2019
Building plan approvalFile: LEGEND B4 (2).pdf23 May 2019
Building Plan Approval (IOD)File: LEGEND A2 PLAN 1.pdf23 May 2019
Building Plan Approval (IOD)File: LEGEND A2 PLAN 2.pdf23 May 2019
Building Plan Approval (IOD)File: LEGEND B4 (1).pdf23 May 2019
Building Plan Approval (IOD)File: LEGEND B4 (2).pdf23 May 2019
Certificates of CA (Form 3)File: LEGEND A2 B4 CA CERTIFICATE.pdf22 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LEGEND A2B4 ARCHITECT CERTIFICATE.pdf19 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LEGEND A2 B4 ENGINEER CERTIFICATE 31 MARCH 2019-min.pdf17 Apr 2019
Declaration in FORM BFile: FORM B PROMOTER A2 B4.pdf6 Mar 2019
Copy of the legal title reportFile: LEGEND A2 AND B4 TITLE.pdf28 Feb 2019
Proforma of Allotment letterFile: Ganga Legend Agmt A2B4.pdf6 Feb 2019
Details of encumbrancesFile: FINAL Encumbrance Certificate.pdf5 Feb 2019
Certificates of CA (Form 5)File: A2B4 FORM 5.pdf5 Feb 2019
OtherFile: A2 B4 SELF DECLARATION.pdf5 Feb 2019
Layout approvalFile: Legend LAYOUT.pdf1 Feb 2019
PAN CardFile: GOEL GANGA INDIA PVT LTD PAN.pdf1 Feb 2019
Copy of Layout Approval (in case of layout)File: Legend LAYOUT.pdf1 Feb 2019
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE LEGEND.pdf1 Feb 2019

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
GANGA GLITZSurvey No 16 P AND Survey No 17 P Village Undri Taluka Haveli District Pune 411 060192CompletedApr 2018Apr 2017
GANGA ARCADIASR NO 22 Hissa No 2 Village Kharadi Taluka Haveli District Pune 41101428CompletedJun 2017Jun 2017
GANGA ARCADIASurvey No. 22 Hissa No 2 situated at Village Kharadi Taluka Haveli District Pune 411 014120CompletedDec 2015Oct 2015
GANGA SPARSHSurvey No 16Pand 17 P Village Undri Taluka Haveli District Pune154CompletedApr 2014Nov 2013
AMRUTGANGAVADGAON BK PUNE611CompletedDec 2013Oct 2013

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GANGA LEGEND A2 AND B4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BAVDHAN13,700+ in Pune

2 kmGANGA LEGEND A2 AND B4Completed 25Lapsed / revoked 16Other 41Dot size: filed unitsN

Filed coordinates, straight-line distance. 82 registered projects within 2 km.

Builder: GOEL GANGA INDIA PVT LTD

GOEL GANGA INDIA PVT LTD has 24 registrations on MahaRERA, including GANGA GLITZ F. BLDG and GANGA LEGEND A4 AND B1... Its filings disclose 8 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Litigation is declared on 11 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GANGA LEGEND A2 AND B4 is delayed beyond 31 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GANGA LEGEND A2 AND B4?

The registered promoter entity is GOEL GANGA INDIA PVT LTD, a company as per the filing. Its CIN U45400PN2016PTC167107 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GANGA LEGEND A2 AND B4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GANGA LEGEND A2 AND B4?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GANGA LEGEND A2 AND B4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GANGA LEGEND A2 AND B4?

The professionals named in the filing: Architect: Chandrashekhar Design Inc; Architect: ANKUR ASSOCIATES; Engineer: Sudhir; Engineer: SHAM MADANE; Chartered Accountant: R S A R & Associates; Chartered Accountant: Sachin Gogave & Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GANGA LEGEND A2 AND B4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GANGA LEGEND A2 AND B4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GANGA LEGEND A2 AND B4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.