Home / Browse projects / Pune, Maharashtra / GANGA LEGEND A2 AND B4
GANGA LEGEND A2 AND B4
RG-MH-93076 · RERA P52100021020 · Last updated on MahaRERA portal: 27 Nov 2024
Source: official MahaRERA filing
Red flags
- Litigation declared, 18 cases
- 2 complaints at MahaRERA
Clear
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 5 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GANGA LEGEND A2 AND B4 is a Residential / Group Housing project by GOEL GANGA INDIA PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100021020 on 27 May 2019. The registration is recorded completed; possession was promised by 31 Dec 2023. 2 complaints are on record with the regulator.
At a glance
Project
- NameGANGA LEGEND A2 AND B4
- TypeResidential / Group Housing
- Location
- DSK RANWARA ROAD RAMNAGAR
- BAVDHAN
- Bavadhan BK
- Mulshi
- Pune
- 411021
- Pincode411021
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100021020
- ReraGenie IDRG-MH-93076
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on27 May 2019
- Promised completion31 Dec 2023
- Revised completionNone
- Buildings4 building records
- Documents filed69 files
Current status
Figures as on 27 Nov 2024, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A2 1-11 FLOORS | NA | 15 | 15 | 0 | 0 | 0 |
| A2 12-23 FLOORS | NA | 12 | 0 | 0 | 0 | 0 |
| B4 1-11 FLOORS | NA | 15 | 0 | 0 | 0 | 0 |
| B4 12-23 FLOORS | NA | 12 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 27 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
16 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 96%.
A2 1-11 FLOORS75%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 70% |
| Podiums (if any) | 47% |
| Plinth | 70% |
| Stilt Floor | 76% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 54% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 77% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 84% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 67% |
A2 12-23 FLOORS88%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 86% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 84% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 86% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 65% |
B4 1-11 FLOORS82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 80% |
| Podiums (if any) | 53% |
| Plinth | 80% |
| Stilt Floor | 77% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 96% |
| Sanitary Fittings within the flats / premises | 76% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 93% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 87% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 65% |
B4 12-23 FLOORS89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 89% |
| Sanitary Fittings within the flats / premises | 54% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 61% |
Progress on shared amenities15
As on 27 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 15% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 76% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed2
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A2 1-11 FLOORS | 1 | 1 |
| B4 1-11 FLOORS | 1 | 1 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| GULAB NAMDEO DAGADE AND OTHERS | Bavadhan BK | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| B4 1-11 FLOORS | NA | Rs 28.70 cr | Rs 22.80 cr |
| B4 12-23 FLOORS | NA | Rs 19.13 cr | Rs 13.55 cr |
| A2 1-11 FLOORS | NA | Rs 18.50 cr | Rs 13.92 cr |
| A2 12-23 FLOORS | NA | Rs 12.70 cr | Rs 9.61 cr |
| - | NA | Rs 2.88 cr | Rs 84.59 lakh |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Chandrashekhar Design Inc |
| Architect | ANKUR ASSOCIATES |
| Engineer | Sudhir |
| Engineer | SHAM MADANE |
| Chartered Accountant | R S A R & Associates |
| Chartered Accountant | Sachin Gogave & Co LLP |
| Chartered Accountant | Sayali Dighe & Associates |
| Chartered Accountant | ANIKET SOLANKI AND CO |
| Partner | Role in project |
|---|---|
| Legends County Landmark Pvt Ltd | - |
Litigation declared18
| Case | Court | Status |
|---|---|---|
| 482/2023 | CJSD PUNE | PENDING |
| 21/2017 | ADDITIONAL COMMISSIONER | PENDING |
| 1338/2007 | CJSD PUNE | PENDING |
| 880/2012 | CJSD PUNE | PENDING |
| 1300/2012 | CJSD PUNE | PENDING |
| 1192/2012 | CJSD PUNE | PENDING |
| 1025/2012 | CJSD PUNE | PENDING |
| 50/2023 | CJSD | PENDING |
| 1594/2023 | CJSD PUNE | PENDING |
| 903/2020 | HIGH COURT MUMBAI | PENDING |
| 3282/2019 | HIGH COURT MUMBAI | PENDING |
| 4163/2019 | HIGH COURT MUMBAI | PENDING |
| 470/2019 | CJSD | PENDING |
| 1119/2020 | HIGH COURT MUMBAI | PENDING |
| 4614/2023 | HIGH COURT MUMBAI | PENDING |
| 39/2015 | NGT | DISPOSED OFF |
| 116/2018 | NGT | DISPOSED OFF |
| 1338/2007 | CJSD | Ongoing |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000279710 | Goel Ganga India Private Limited | Uzzair Mohammed Ishraque Khan | 06/11/2023 |
| CC005000000279711 | Goel Ganga India Private Limited | Mohammed Adnan Khan | 06/11/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Mar 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Mar 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 26 Dec 2023
Documents filed69
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: RERA FORM 4 GANGA LEGEND A2 B4.pdf | 27 Nov 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: 1 Other - Technical (1).pdf | 13 Nov 2024 |
| Other - TechnicalFile: RERA FORM 4 GANGA LEGEND A2 B4 21-12-23.pdf | 18 Jan 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A2 BLDG COMPLETION CERTIFICATE 16 12 2023.pdf | 26 Dec 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: B4 BLDG COMPLETION CERTIFICATE 16 12 2023.pdf | 26 Dec 2023 |
| Certificates of CA (Form 3)File: A2 AND B4 FORM 3_compressed (1).pdf | 7 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Form 1 Architect's Certificate Legend A2,B4 Sept 2023 signed.pdf | 26 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Form 2 Engineer's Certificate Legend A2,B4 Sept 2023 signed.pdf | 26 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate for RERA Legend A2 B4 June 23.pdf | 17 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's certificate for RERA Legend A2 B4 June 23.pdf | 17 Jul 2023 |
| Certificates of CA (Form 3)File: GANGA LEGEND PHASE A2 AND B4 FORM 3 - 310323_.pdf | 1 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Legend A2B4 -CORRECTED.pdf | 21 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Legend A2B4.pdf | 14 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Legend A2 B4.pdf | 14 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate A2 B4.pdf | 11 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Arch Certificate A2 B4.pdf | 11 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate A2 B4.pdf | 11 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate Bldg A2 B4.pdf | 18 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Bldg A2 B4.pdf | 18 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GOEL GANGA RERA_compressed.pdf | 8 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG LEGEND A2 B4.pdf | 8 Jul 2022 |
| Proforma of Allotment letterFile: A2 - RERA AGREEMENT - GANGA LEGEND.pdf | 14 Jun 2022 |
| Proforma of Allotment letterFile: B4 - RERA AGREEMENT - GANGA LEGEND.pdf | 14 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE ON SOLD UNSOLD INVENTORY AS ON 31032022.pdf | 23 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 -- LEGEND A2,B4 -- 18-19.pdf | 23 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 -- LEGEND A2,B4 -- 19-20.pdf | 23 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 -- LEGEND A2,B4 -- 20-21.pdf | 23 Apr 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert - Legend - A2, B4.pdf | 15 Apr 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engg cert - elegend A2 b4.pdf | 15 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: quality - legend a2 b4.pdf | 15 Apr 2022 |
| Layout approvalFile: Sheet No 1_compressed-compressed.pdf | 5 Mar 2022 |
| Building plan approvalFile: Sheet No 1_compressed-compressed.pdf | 5 Mar 2022 |
| Building plan approvalFile: Sheet No 1_compressed-compressed.pdf | 5 Mar 2022 |
| Copy of the legal title reportFile: Title Certificate10112020.pdf | 5 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: Sheet No 1_compressed-compressed.pdf | 5 Mar 2022 |
| Building Plan Approval (IOD)File: Sheet No 1_compressed-compressed.pdf | 5 Mar 2022 |
| Building Plan Approval (IOD)File: Sheet No 1_compressed-compressed.pdf | 5 Mar 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE-655(1)-compressed.pdf | 5 Mar 2022 |
| OtherFile: Ganga Legend A2 B4 - Consent of Allotee.pdf | 16 Feb 2022 |
| Declaration about Commencement CertificateFile: Ganga Legend A2 B4 - Declaration.pdf | 28 Nov 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ganga Legend A2 B4- FORM 1- SEP 2021.pdf | 28 Nov 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ganga Legend A2 B4- SEP 2021 ENGINEER CERTIFICATE.pdf | 28 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Ganga Legend A2 B4- 2A.pdf | 28 Nov 2021 |
| Details of encumbrancesFile: LEGEND Encumbrance CertificateAdv VasteDated11112020.pdf | 27 Feb 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LEGEND A2 B4.pdf | 16 Aug 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LEGEND A2 B4.pdf | 16 Aug 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LEGEND A2 B4.pdf | 16 Aug 2019 |
| Form 2AFile: FORM 2A LEGEND A2 B4 RCC.pdf | 15 Jul 2019 |
| Building plan approvalFile: LEGEND A2 PLAN 1.pdf | 23 May 2019 |
| Building plan approvalFile: LEGEND A2 PLAN 2.pdf | 23 May 2019 |
| Building plan approvalFile: LEGEND B4 (1).pdf | 23 May 2019 |
| Building plan approvalFile: LEGEND B4 (2).pdf | 23 May 2019 |
| Building Plan Approval (IOD)File: LEGEND A2 PLAN 1.pdf | 23 May 2019 |
| Building Plan Approval (IOD)File: LEGEND A2 PLAN 2.pdf | 23 May 2019 |
| Building Plan Approval (IOD)File: LEGEND B4 (1).pdf | 23 May 2019 |
| Building Plan Approval (IOD)File: LEGEND B4 (2).pdf | 23 May 2019 |
| Certificates of CA (Form 3)File: LEGEND A2 B4 CA CERTIFICATE.pdf | 22 Apr 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LEGEND A2B4 ARCHITECT CERTIFICATE.pdf | 19 Apr 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LEGEND A2 B4 ENGINEER CERTIFICATE 31 MARCH 2019-min.pdf | 17 Apr 2019 |
| Declaration in FORM BFile: FORM B PROMOTER A2 B4.pdf | 6 Mar 2019 |
| Copy of the legal title reportFile: LEGEND A2 AND B4 TITLE.pdf | 28 Feb 2019 |
| Proforma of Allotment letterFile: Ganga Legend Agmt A2B4.pdf | 6 Feb 2019 |
| Details of encumbrancesFile: FINAL Encumbrance Certificate.pdf | 5 Feb 2019 |
| Certificates of CA (Form 5)File: A2B4 FORM 5.pdf | 5 Feb 2019 |
| OtherFile: A2 B4 SELF DECLARATION.pdf | 5 Feb 2019 |
| Layout approvalFile: Legend LAYOUT.pdf | 1 Feb 2019 |
| PAN CardFile: GOEL GANGA INDIA PVT LTD PAN.pdf | 1 Feb 2019 |
| Copy of Layout Approval (in case of layout)File: Legend LAYOUT.pdf | 1 Feb 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE LEGEND.pdf | 1 Feb 2019 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| GANGA GLITZ | Survey No 16 P AND Survey No 17 P Village Undri Taluka Haveli District Pune 411 060 | 192 | Completed | Apr 2018 | Apr 2017 |
| GANGA ARCADIA | SR NO 22 Hissa No 2 Village Kharadi Taluka Haveli District Pune 411014 | 28 | Completed | Jun 2017 | Jun 2017 |
| GANGA ARCADIA | Survey No. 22 Hissa No 2 situated at Village Kharadi Taluka Haveli District Pune 411 014 | 120 | Completed | Dec 2015 | Oct 2015 |
| GANGA SPARSH | Survey No 16Pand 17 P Village Undri Taluka Haveli District Pune | 154 | Completed | Apr 2014 | Nov 2013 |
| AMRUTGANGA | VADGAON BK PUNE | 611 | Completed | Dec 2013 | Oct 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 23 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 69 filed documents as one ZIP, foldered, with a manifest
Keep GANGA LEGEND A2 AND B4 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BAVDHAN13,700+ in Pune
Filed coordinates, straight-line distance. 82 registered projects within 2 km.
NYATI EQUINOX I
MIHIR HOMES ENTERPRISE LLP
Puraniks Abitante Fiore, Phase 2A
Puranik Buildcon Private Limited
Puraniks Abitante Fiore, Phase 2B
Puranik Buildcon Private Limited
cloud 51
OREE REALITY PVT LTD
CIELO BY VTP LUXE
DELAS REALCON LLP
Puraniks Abitante Fiore Phase 2C1
Puranik Buildcon Private Limited
Builder: GOEL GANGA INDIA PVT LTD
GOEL GANGA INDIA PVT LTD has 24 registrations on MahaRERA, including GANGA GLITZ F. BLDG and GANGA LEGEND A4 AND B1... Its filings disclose 8 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Litigation is declared on 11 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if GANGA LEGEND A2 AND B4 is delayed beyond 31 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GANGA LEGEND A2 AND B4?
The registered promoter entity is GOEL GANGA INDIA PVT LTD, a company as per the filing. Its CIN U45400PN2016PTC167107 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GANGA LEGEND A2 AND B4?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against GANGA LEGEND A2 AND B4?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for GANGA LEGEND A2 AND B4?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GANGA LEGEND A2 AND B4?
The professionals named in the filing: Architect: Chandrashekhar Design Inc; Architect: ANKUR ASSOCIATES; Engineer: Sudhir; Engineer: SHAM MADANE; Chartered Accountant: R S A R & Associates; Chartered Accountant: Sachin Gogave & Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GANGA LEGEND A2 AND B4?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback