Red flags
- Registration lapsed
- Possession 18 months past the filed date
- Litigation declared, 21 cases
- Completion date moved by 4 months
- 1 extension taken
Clear
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 6 earlier projects delivered on promise
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GANGA LEGEND B2 is a Residential / Group Housing project by GOEL GANGA INDIA PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100024312 on 3 Feb 2020. Possession was promised by 30 Apr 2025 and is now 18 months past that date. The completion date has moved by 4 months from the original filing.
At a glance
Project
- NameGANGA LEGEND B2
- TypeResidential / Group Housing
- Location
- DSK RANWARA ROAD
- RAMNAGAR
- Bavadhan BK
- Mulshi
- Pune
- 411021
- Pincode411021
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100024312
- ReraGenie IDRG-MH-15874
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on3 Feb 2020
- Promised completion30 Apr 2025
- Revised completionRevised to 30 Apr 2025 (originally 31 Dec 2024)
- Buildings1 building record
- Documents filed82 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GANGA LEGEND B2 1-23 FLOOR | NA | 27 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 95%.
GANGA LEGEND B2 1-23 FLOOR: 76% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 95% |
| Plinth | 100% |
| Stilt Floor | 85% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 64% |
| Sanitary Fittings within the flats / premises | 47% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 62% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 53% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
Progress on shared amenities15
As on 17 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 57% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 76% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed272
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANKUR ASSOCIATES |
| Architect | Chandrashekhar Design Inc |
| Engineer | Sudhir |
| Engineer | SUDHIR AGRAWAL |
| Engineer | G. A. Bhillare |
| Chartered Accountant | ANIKET SOLANKI AND COMPANY |
| Chartered Accountant | Sachin Gogave & Co. LLP |
| Chartered Accountant | Sayali Dighe |
| Partner | Role in project |
|---|---|
| Legends County Landmark Pvt Ltd | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe, Goel Ganga India Pvt Ltd, hereby declare the following with respect to the project Ganga Legend B2 bearing registration number P52100024312 registered under MahaRERA The project has been completed on time with no physical delays. However, the delay in obtaining the Occupancy Certificate (OC) was due to the unavailability of key officials during the Maharashtra Lok Sabha Elections, which caused a delay in securing necessary permissions.
Litigation declared21
| Case | Court | Status |
|---|---|---|
| 482/2023 | CJSD PUNE | PENDING |
| 1338/2007 | CJSD PUNE | PENDING |
| 880/2012 | CJSD PUNE | PENDING |
| 1300/2012 | CJSD PUNE | PENDING |
| 1025/2012 | CJSD PUNE | PENDING |
| 1119/2020 | HIGH COURT MUMBAI | PENDING |
| 1192/2012 | CJSD PUNE | PENDING |
| 21/2017 | ADDITIONAL COMMISSIONER PUNE | PENDING |
| 1594/2023 | CJSD PUNE | PENDING |
| 4614/2023 | HIGH COURT MUMBAI | PENDING |
| 3282/2019 | HIGH COURT MUMBAI | PENDING |
| 4163/2019 | HIGH COURT MUMBAI | PENDING |
| 470/2019 | CJSD | PENDING |
| 50/2023 | CJSD | PENDING |
| 903/2020 | HIGH COURT MUMBAI | PENDING |
| 39/2015 | NGT | DISPOSED OFF |
| 116/2018 | NGT | DISPOSED OFF |
| 1338/2007 | CJSD | Ongoing |
| 1338/2007 | CJSD | Ongoing |
| 1338/2007 | CJSD | Ongoing |
| 1338/2007 | CJSD | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Mar 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Mar 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 17 Apr 2025
Documents filed82
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: B2 building complition certificate 07022025.pdf | 17 Apr 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: B2 building complition certificate 07022025.pdf | 11 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Architect's Certificate-Legend B2 - Dec 2024.pdf | 13 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 B2 December 2024.pdf | 13 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Engineer's Certificate-Legend B2 - Dec 2024.pdf | 13 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021-22.pdf | 1 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022-23.pdf | 1 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-24.pdf | 1 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2021.pdf | 30 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-21 (1).pdf | 30 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22.pdf | 30 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23.pdf | 30 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24.pdf | 30 Dec 2024 |
| Declaration in FORM BFile: Form B.pdf | 28 Dec 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Seperate Bank Account Details (1).pdf | 28 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf | 28 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf | 28 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Architect's Certificate-Legend B2 - Sept 2024.pdf | 22 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: fORM 3 B2 SEPT 2024.pdf | 22 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Engineer's Certificate-Legend B2 - Sept 2024.pdf | 22 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Discloser of sold inventory B2.pdf | 22 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC- 2683 - 23-24-869 - 07-05-2024.pdf | 10 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC- 2683 - 23-24-869 - 07-05-2024.pdf | 10 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Architect's Certificate-Legend B2 - June 2024.pdf | 9 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 B2.pdf | 9 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3B2-signed.pdf | 9 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Architect's Certificate-Legend B2 - June 2024.pdf | 9 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3B2-signed.pdf | 9 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 B2.pdf | 9 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Doc1.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Doc1.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 1 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold data B2 March 2024.pdf | 29 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GOEL GANGA 31 MArch 2024 B2_compressed.pdf | 14 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Architect's Certificate-Legend B2 - March 2024.pdf | 31 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Engineer's Certificate-Legend B2 - March 2024.pdf | 31 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 3 Form - 2A - Engineer's Certificate (Quality Assurance)-Legend B2- march 2024.pdf | 29 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - GOEL GANGA LEGEND B2 - 31122023_compressed.pdf | 6 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Architect's Certificate-Legend B2 - December 2023.pdf | 18 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Engineer's Certificate-Legend B2 - December 2023.pdf | 18 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 B2 RERA FORM 3 -Sept 2023.pdf | 30 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 Architect's Certificate Legend B2 Sept 2023 signed.pdf | 26 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 Engineer's Certificate Legend B2 Sept 2023 signed.pdf | 26 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3 CA CERTIFICATE- LEGEND B2 - JUNE 2023.pdf | 28 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate for RERA Legend B2 June 23.pdf | 17 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's certificate for RERA Legend B2 June 23.pdf | 17 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GANGA LEGEND PHASE B2 FORM 3 - 31032023.pdf | 31 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Legend B2.pdf | 14 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Legend B2.pdf | 14 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate B2.pdf | 11 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate B2.pdf | 11 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate Bldg B2.pdf | 18 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate Bldg B2.pdf | 18 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT LEGEND B2 JUNE 22.pdf | 9 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG LEGEND B2.pdf | 9 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert- Legend B2.pdf | 17 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg elegend b2.pdf | 17 Apr 2022 |
| Building plan approvalFile: Sheet No 1_compressed-compressed.pdf | 5 Mar 2022 |
| Layout approvalFile: Sheet No 1_compressed-compressed.pdf | 5 Mar 2022 |
| Copy of the legal title reportFile: Title Certificate10112020.pdf | 5 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: Sheet No 1_compressed-compressed.pdf | 5 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet No 1_compressed-compressed.pdf | 5 Mar 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE-655(1)-compressed.pdf | 5 Mar 2022 |
| Declaration about Commencement CertificateFile: Ganga Legend- B2 - Declaration.pdf | 28 Nov 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ganga Legend B2-FORM 1- SEP 2021.pdf | 28 Nov 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ganga Legend B2- SEP 2021 ENGINEER CERTIFICATE.pdf | 28 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Ganga Legend B2- 2A.pdf | 28 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Ganga Legend B2- 2A.pdf | 28 Nov 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Ganga Legend_Building B_compressed.pdf | 30 Jan 2020 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER GANGA LEGEND B-2.pdf | 30 Jan 2020 |
| Layout approvalFile: LEGEND LAYOUT.pdf | 21 Jan 2020 |
| Building plan approvalFile: LEGEND BUILDING PLAN.pdf | 21 Jan 2020 |
| Building plan approvalFile: LEGEND BUILDING PLAN 1.pdf | 21 Jan 2020 |
| PAN CardFile: PAN CARD GGIPL 1.pdf | 21 Jan 2020 |
| Copy of the legal title reportFile: Title Certificate-LEGEND B2.pdf | 21 Jan 2020 |
| Details of encumbrancesFile: Encumbrance Report - LEGEND B2.pdf | 21 Jan 2020 |
| Copy of Layout Approval (in case of layout)File: LEGEND LAYOUT.pdf | 21 Jan 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: LEGEND BUILDING PLAN.pdf | 21 Jan 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: LEGEND BUILDING PLAN 1.pdf | 21 Jan 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: LEGEND CC.pdf | 21 Jan 2020 |
Promoter's earlier projects6
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| GANGA LEGEND A2 AND B4P52100021020 | BAVDHAN, Pune | 272 | May 2019 | Completed | Dec 2023 | Dec 2023 |
| GANGA GLITZ | Survey No 16 P AND Survey No 17 P Village Undri Taluka Haveli District Pune 411 060 | 192 | - | Completed | Apr 2018 | Apr 2017 |
| GANGA ARCADIA | SR NO 22 Hissa No 2 Village Kharadi Taluka Haveli District Pune 411014 | 28 | - | Completed | Jun 2017 | Jun 2017 |
| GANGA ARCADIA | Survey No. 22 Hissa No 2 situated at Village Kharadi Taluka Haveli District Pune 411 014 | 120 | - | Completed | Dec 2015 | Oct 2015 |
| GANGA SPARSH | Survey No 16Pand 17 P Village Undri Taluka Haveli District Pune | 154 | - | Completed | Apr 2014 | Nov 2013 |
| AMRUTGANGA | VADGAON BK PUNE | 611 | - | Completed | Dec 2013 | Oct 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 23 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 82 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep GANGA LEGEND B2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near RAMNAGAR13,700+ in Pune
Filed coordinates, straight-line distance. 268 registered projects within 2 km.
NYATI EQUINOX I
MIHIR HOMES ENTERPRISE LLP
Puraniks Abitante Fiore, Phase 2A
Puranik Buildcon Private Limited
Puraniks Abitante Fiore, Phase 2B
Puranik Buildcon Private Limited
cloud 51
OREE REALITY PVT LTD
CIELO BY VTP LUXE
DELAS REALCON LLP
Puraniks Abitante Fiore Phase 2C1
Puranik Buildcon Private Limited
Builder: GOEL GANGA INDIA PVT LTD
GOEL GANGA INDIA PVT LTD has 24 registrations on MahaRERA, including GANGA GLITZ F. BLDG and GANGA LEGEND A4 AND B1... Its filings disclose 8 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Litigation is declared on 11 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that GANGA LEGEND B2 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if GANGA LEGEND B2 is delayed beyond 30 Apr 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GANGA LEGEND B2?
The registered promoter entity is GOEL GANGA INDIA PVT LTD, a company as per the filing. Its CIN U45400PN2016PTC167107 and GSTIN 27AAGCG6139B6ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GANGA LEGEND B2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GANGA LEGEND B2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GANGA LEGEND B2?
The professionals named in the filing: Architect: ANKUR ASSOCIATES; Architect: Chandrashekhar Design Inc; Engineer: Sudhir; Engineer: SUDHIR AGRAWAL; Engineer: G. A. Bhillare; Chartered Accountant: ANIKET SOLANKI AND COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GANGA LEGEND B2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback