Home / Browse projects / Pune, Maharashtra / GANGA LEGEND B2

Registration lapsed Litigation declared Residential / Group Housing project

GANGA LEGEND B2

By GOEL GANGA INDIA PVT LTD

RG-MH-15874 · RERA P52100024312 · Last updated on MahaRERA portal: 17 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 18 months past the filed date
  • Litigation declared, 21 cases
  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 6 earlier projects delivered on promise

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2025Possession promised18 months past this date
4 of 11Construction stages donefurthest along: Podiums (if any), 95%
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

GANGA LEGEND B2 is a Residential / Group Housing project by GOEL GANGA INDIA PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100024312 on 3 Feb 2020. Possession was promised by 30 Apr 2025 and is now 18 months past that date. The completion date has moved by 4 months from the original filing.

At a glance

Project

  • NameGANGA LEGEND B2
  • TypeResidential / Group Housing
  • Location
    • DSK RANWARA ROAD
    • RAMNAGAR
    • Bavadhan BK
    • Mulshi
    • Pune
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100024312
  • ReraGenie IDRG-MH-15874

Builder

  • NameGOEL GANGA INDIA PVT LTD
  • Entity typeCompany
  • CINU45400PN2016PTC167107
  • GSTIN27AAGCG6139B6ZN
  • DirectorsJAIPRAKASH SITARAM GOEL, Amit Jaiprakash Goel
  • Other registrations23 more →
  • Completed6 of 24
  • No longer live10 lapsed, de-registered or revoked
  • Declared earlier projects8 →

Key dates

18 months past promisethis monthRegisteredFeb 2020First promiseDec 2024Revised toApr 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on3 Feb 2020
  • Promised completion30 Apr 2025
  • Revised completionRevised to 30 Apr 2025 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed82 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GANGA LEGEND B2 1-23 FLOORNA270000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 95%.

GANGA LEGEND B2 1-23 FLOOR: 76% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)95%
Plinth100%
Stilt Floor85%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises64%
Sanitary Fittings within the flats / premises47%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks62%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.53%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 17 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes57%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes76%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed272

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots272
Closed/Covered272

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,772 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 May 2025

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI19307.23
Proposed, not sanctioned14,307 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGENTRAL THIMMAYA ROAD CANTONMENT PUNE 411001

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANKUR ASSOCIATES
ArchitectChandrashekhar Design Inc
EngineerSudhir
EngineerSUDHIR AGRAWAL
EngineerG. A. Bhillare
Chartered AccountantANIKET SOLANKI AND COMPANY
Chartered AccountantSachin Gogave & Co. LLP
Chartered AccountantSayali Dighe
PartnerRole in project
Legends County Landmark Pvt Ltd-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100025952Dec 2024 → Apr 2025

Reason as filed by the promoterWe, Goel Ganga India Pvt Ltd, hereby declare the following with respect to the project Ganga Legend B2 bearing registration number P52100024312 registered under MahaRERA The project has been completed on time with no physical delays. However, the delay in obtaining the Occupancy Certificate (OC) was due to the unavailability of key officials during the Maharashtra Lok Sabha Elections, which caused a delay in securing necessary permissions.

Litigation declared21

CaseCourtStatus
482/2023CJSD PUNEPENDING
1338/2007CJSD PUNEPENDING
880/2012CJSD PUNEPENDING
1300/2012CJSD PUNEPENDING
1025/2012CJSD PUNEPENDING
1119/2020HIGH COURT MUMBAIPENDING
1192/2012CJSD PUNEPENDING
21/2017ADDITIONAL COMMISSIONER PUNEPENDING
1594/2023CJSD PUNEPENDING
4614/2023HIGH COURT MUMBAIPENDING
3282/2019HIGH COURT MUMBAIPENDING
4163/2019HIGH COURT MUMBAIPENDING
470/2019CJSDPENDING
50/2023CJSDPENDING
903/2020HIGH COURT MUMBAIPENDING
39/2015NGTDISPOSED OFF
116/2018NGTDISPOSED OFF
1338/2007CJSDOngoing
1338/2007CJSDOngoing
1338/2007CJSDOngoing
1338/2007CJSDOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Apr 2025

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: B2 building complition certificate 07022025.pdf17 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: B2 building complition certificate 07022025.pdf11 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Architect's Certificate-Legend B2 - Dec 2024.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 B2 December 2024.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Engineer's Certificate-Legend B2 - Dec 2024.pdf13 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021-22.pdf1 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022-23.pdf1 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-24.pdf1 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2021.pdf30 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-21 (1).pdf30 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22.pdf30 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23.pdf30 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24.pdf30 Dec 2024
Declaration in FORM BFile: Form B.pdf28 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Seperate Bank Account Details (1).pdf28 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf28 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf28 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Architect's Certificate-Legend B2 - Sept 2024.pdf22 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: fORM 3 B2 SEPT 2024.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Engineer's Certificate-Legend B2 - Sept 2024.pdf22 Nov 2024
Disclosure of sold/ booked inventoryFile: Discloser of sold inventory B2.pdf22 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: CC- 2683 - 23-24-869 - 07-05-2024.pdf10 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC- 2683 - 23-24-869 - 07-05-2024.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Architect's Certificate-Legend B2 - June 2024.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 B2.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3B2-signed.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Architect's Certificate-Legend B2 - June 2024.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3B2-signed.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 B2.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Doc1.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Doc1.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf1 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold data B2 March 2024.pdf29 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GOEL GANGA 31 MArch 2024 B2_compressed.pdf14 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Architect's Certificate-Legend B2 - March 2024.pdf31 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Engineer's Certificate-Legend B2 - March 2024.pdf31 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 3 Form - 2A - Engineer's Certificate (Quality Assurance)-Legend B2- march 2024.pdf29 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - GOEL GANGA LEGEND B2 - 31122023_compressed.pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Architect's Certificate-Legend B2 - December 2023.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Engineer's Certificate-Legend B2 - December 2023.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 B2 RERA FORM 3 -Sept 2023.pdf30 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 Architect's Certificate Legend B2 Sept 2023 signed.pdf26 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 Engineer's Certificate Legend B2 Sept 2023 signed.pdf26 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3 CA CERTIFICATE- LEGEND B2 - JUNE 2023.pdf28 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate for RERA Legend B2 June 23.pdf17 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's certificate for RERA Legend B2 June 23.pdf17 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GANGA LEGEND PHASE B2 FORM 3 - 31032023.pdf31 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Legend B2.pdf14 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Legend B2.pdf14 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate B2.pdf11 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate B2.pdf11 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate Bldg B2.pdf18 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate Bldg B2.pdf18 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT LEGEND B2 JUNE 22.pdf9 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG LEGEND B2.pdf9 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert- Legend B2.pdf17 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg elegend b2.pdf17 Apr 2022
Building plan approvalFile: Sheet No 1_compressed-compressed.pdf5 Mar 2022
Layout approvalFile: Sheet No 1_compressed-compressed.pdf5 Mar 2022
Copy of the legal title reportFile: Title Certificate10112020.pdf5 Mar 2022
Copy of Layout Approval (in case of layout)File: Sheet No 1_compressed-compressed.pdf5 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Sheet No 1_compressed-compressed.pdf5 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE-655(1)-compressed.pdf5 Mar 2022
Declaration about Commencement CertificateFile: Ganga Legend- B2 - Declaration.pdf28 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ganga Legend B2-FORM 1- SEP 2021.pdf28 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ganga Legend B2- SEP 2021 ENGINEER CERTIFICATE.pdf28 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Ganga Legend B2- 2A.pdf28 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Ganga Legend B2- 2A.pdf28 Nov 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Ganga Legend_Building B_compressed.pdf30 Jan 2020
Proforma of Allotment letterFile: ALLOTMENT LETTER GANGA LEGEND B-2.pdf30 Jan 2020
Layout approvalFile: LEGEND LAYOUT.pdf21 Jan 2020
Building plan approvalFile: LEGEND BUILDING PLAN.pdf21 Jan 2020
Building plan approvalFile: LEGEND BUILDING PLAN 1.pdf21 Jan 2020
PAN CardFile: PAN CARD GGIPL 1.pdf21 Jan 2020
Copy of the legal title reportFile: Title Certificate-LEGEND B2.pdf21 Jan 2020
Details of encumbrancesFile: Encumbrance Report - LEGEND B2.pdf21 Jan 2020
Copy of Layout Approval (in case of layout)File: LEGEND LAYOUT.pdf21 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: LEGEND BUILDING PLAN.pdf21 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: LEGEND BUILDING PLAN 1.pdf21 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: LEGEND CC.pdf21 Jan 2020

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
GANGA LEGEND A2 AND B4P52100021020BAVDHAN, Pune272May 2019CompletedDec 2023Dec 2023
GANGA GLITZSurvey No 16 P AND Survey No 17 P Village Undri Taluka Haveli District Pune 411 060192-CompletedApr 2018Apr 2017
GANGA ARCADIASR NO 22 Hissa No 2 Village Kharadi Taluka Haveli District Pune 41101428-CompletedJun 2017Jun 2017
GANGA ARCADIASurvey No. 22 Hissa No 2 situated at Village Kharadi Taluka Haveli District Pune 411 014120-CompletedDec 2015Oct 2015
GANGA SPARSHSurvey No 16Pand 17 P Village Undri Taluka Haveli District Pune154-CompletedApr 2014Nov 2013
AMRUTGANGAVADGAON BK PUNE611-CompletedDec 2013Oct 2013

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 4 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GANGA LEGEND B2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAMNAGAR13,700+ in Pune

2 kmGANGA LEGEND B2Completed 116Lapsed / revoked 116Other 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 268 registered projects within 2 km.

Builder: GOEL GANGA INDIA PVT LTD

GOEL GANGA INDIA PVT LTD has 24 registrations on MahaRERA, including GANGA GLITZ F. BLDG and GANGA LEGEND A4 AND B1... Its filings disclose 8 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Litigation is declared on 11 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that GANGA LEGEND B2 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if GANGA LEGEND B2 is delayed beyond 30 Apr 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GANGA LEGEND B2?

The registered promoter entity is GOEL GANGA INDIA PVT LTD, a company as per the filing. Its CIN U45400PN2016PTC167107 and GSTIN 27AAGCG6139B6ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GANGA LEGEND B2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GANGA LEGEND B2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GANGA LEGEND B2?

The professionals named in the filing: Architect: ANKUR ASSOCIATES; Architect: Chandrashekhar Design Inc; Engineer: Sudhir; Engineer: SUDHIR AGRAWAL; Engineer: G. A. Bhillare; Chartered Accountant: ANIKET SOLANKI AND COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GANGA LEGEND B2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GANGA LEGEND B2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GANGA LEGEND B2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.