Home / Browse projects / Excalibur by Nahar

Completed No litigation declared Residential / Group Housing project

Excalibur by Nahar

By NAHAR EXCALIBUR PROJECT PRIVATE LIMITED

RG-MH-07966 · RERA P51900000138 · Last updated on MahaRERA portal: 12 Jun 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2020Possession promisedregistration recorded completed
29 of 33Construction stages doneacross 3 buildings; furthest along: Sanitary Fittings within the flats /..., 97%
0Complaints at MahaRERAon this registration
Jump to the 53 documents Report an error

Excalibur by Nahar is a Residential / Group Housing project by NAHAR EXCALIBUR PROJECT PRIVATE LIMITED in 400011, registered with MahaRERA as P51900000138 on 5 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2020. The completion date has moved by 18 months from the original filing.

At a glance

Project

  • NameExcalibur by Nahar
  • TypeResidential / Group Housing
  • Location
    • 400011
  • Pincode400011
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900000138
  • ReraGenie IDRG-MH-07966

Builder

  • NameNAHAR EXCALIBUR PROJECT PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorSUKHRAJ BABULALJI NAHAR
  • Declared earlier projects7 →

Key dates

this monthRegisteredJul 2017First promiseJun 2019Revised toDec 2020Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Jul 2017
  • Promised completion30 Dec 2020
  • Revised completionRevised to 30 Dec 2020 (originally 30 Jun 2019)
  • Buildings3 building records
  • Documents filed53 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EXCALIBUR BY NAHARNA270000
AyeshabaiNA250000
Haji Gul MohammadNA250000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 12 Jun 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

29 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 97%.

EXCALIBUR BY NAHAR100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises97%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Ayeshabai82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Haji Gul Mohammad91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 12 Jun 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed122

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots122
Closed/Covered117
Open Space5
BuildingClosed/CoveredOpen SpaceTotal
EXCALIBUR BY NAHAR58058
Ayeshabai24529
Haji Gul Mohammad35035

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,503 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI12835.52
Proposed, not sanctioned11,430 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTRADE WORLD B WING, KAMALA MILLS COMPUND

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr. Ketan Vaidya
EngineerMahimtura Consultants Private Limited
Chartered AccountantSNEHA DHIRAJ & COMPNAY
Chartered AccountantPRAKASH BOHRA
PartnerRole in project
NAHAR EXCALIBUR PROJECT PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900001749Jun 2019 → Jun 2020

Reason as filed by the promoterDue to Construction work of above mentioned sale building is delayed due to amendments in the planning of the top three floors. The Proposed amendments will be carried out on site only after getting the necessary approvals from competent Authority and making changes in the structural drawings.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jun 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jun 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Feb 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Mar 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Mar 2020

Documents filed53

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Nahar Excalibur.pdf12 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf28 Mar 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's RERA CertificateAA.pdf7 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rerea Engineer Certificate NOV (1).pdf7 Jan 2020
Certificates of CA (Form 3)File: CA CERTIFICATE FORM 3 NOVEMBER.pdf7 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1_compressed (1).pdf5 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rera Engineer Certificate Excalibur_compressed.pdf5 Oct 2019
Certificates of CA (Form 3)File: FORM 3.pdf5 Oct 2019
Certificates of CA (Form 5)File: FORM 5.pdf28 Sep 2019
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf27 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: New Doc 28 (1)_compressed.pdf15 Jul 2019
Certificates of CA (Form 3)File: FORM 3 NEPPL MAY2019.pdf15 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate for RERA MAY.pdf11 Jul 2019
Certificates of CA (Form 3)File: FORM 3 FEB 2019_compressed.pdf11 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's RERA Certificate.pdf4 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: New Doc 44_compressed.pdf4 Apr 2019
Commencement Certificates / NA Order for plotted developmentFile: 2212916_FurtherCC_signed.pdf11 Mar 2019
Building plan approvalFile: IOD 1.pdf25 Feb 2019
Building plan approvalFile: IOD 2.pdf25 Feb 2019
Building Plan Approval (IOD)File: IOD 1.pdf25 Feb 2019
Building Plan Approval (IOD)File: IOD 2.pdf25 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate nov.pdf3 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificat november.pdf3 Jan 2019
Certificates of CA (Form 3)File: RERA CERTIFICATE nov 2018.pdf3 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect CERTIFICATE.pdf1 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE-ilovepdf-compressed.pdf1 Oct 2018
Certificates of CA (Form 3)File: RERA NEPPL CA CERTIFICATE.pdf1 Oct 2018
Certificates of CA (Form 5)File: FORM 5.pdf1 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: New Doc 2018-07-02-ilovepdf-compressed.pdf2 Jul 2018
Certificates of CA (Form 3)File: CA CERTFICATE- NAHAR EXCALIBUR (2)-ilovepdf-compressed.pdf2 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect.pdf29 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA certificate (2)-ilovepdf-compressed.pdf4 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: New Doc 179 (1)-ilovepdf-compressed.pdf4 Apr 2018
Certificates of CA (Form 3)File: ca certificate.pdf4 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT-ilovepdf-compressed.pdf8 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG-ilovepdf-compressed.pdf8 Jan 2018
Certificates of CA (Form 3)File: form 3 CA CERTIFICATE.pdf8 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's certificate.pdf4 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG-ilovepdf-compressed.pdf4 Oct 2017
Certificates of CA (Form 3)File: CERTIFICATE.pdf4 Oct 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate (2)-.pdf29 Jun 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: New Doc 2017-06-29-ilovepdf-compressed.pdf29 Jun 2017
Certificates of CA (Form 3)File: Form 3-ilovepdf-compressed.pdf29 Jun 2017
Proforma of Allotment letterFile: ARG OF SALE- NEPPL.pdf29 Jun 2017
PAN CardFile: NEPPL PAN.pdf28 Jun 2017
Copy of the legal title reportFile: DOC.PDF20 Jun 2017
Declaration in FORM BFile: NAHAR EXCALIBUR_AFFIDAVIT-CUM-DECLARATION.pdf20 Jun 2017
Details of encumbrancesFile: NEPPL LOAN.pdf19 Jun 2017
Commencement Certificates / NA Order for plotted developmentFile: Sale CC.pdf19 Jun 2017
Layout approvalFile: Layout plan.pdf14 Jun 2017
Building plan approvalFile: IOD.pdf14 Jun 2017
Copy of Layout Approval (in case of layout)File: Layout plan.pdf14 Jun 2017
Building Plan Approval (IOD)File: IOD.pdf14 Jun 2017

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise5 delivered late
ProjectLocationFlatsStatusPromisedDelivered
R-3F Rosa AlbaNahar Amrit Shakti village Chandivali Mumbai 400 07268CompletedJan 2015Jan 2015
R 20 NAHAR BUSINESS CENTERNahar Amrit Shakti village Chandivali Mumbai 400 07236CompletedJan 2015Jan 2015
R-18 White Lily and Water LilyNahar Amrit Shakti village Chandivali Mumbai 400 072144CompletedDec 2014Late, Apr 2016
R-12/7 and 8 Barberny-BryonyNahar Amrit Shakti village Chandivali Mumbai 400 072159CompletedDec 2014Late, Aug 2015
R 12/11, YVONNENahar Amrit Shakti village Chandivali Mumbai 400 072108CompletedDec 2014Late, Aug 2015
R-12,10 Laurel- LilacNahar Amrit Shakti village Chandivali Mumbai 400 072178CompletedJun 2013Late, Feb 2014
R 12/9 JONQUILE JAMAICANahar Amrit Shakti village Chandivali Mumbai 400 072178CompletedJun 2013Late, Feb 2014

Keep Excalibur by Nahar on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near this project

2 kmExcalibur by NaharCompleted 8Lapsed / revoked 16Other 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 44 registered projects within 2 km.

Builder: NAHAR EXCALIBUR PROJECT PRIVATE LIMITED

NAHAR EXCALIBUR PROJECT PRIVATE LIMITED has 1 registration on MahaRERA, including Excalibur by Nahar. Its filings disclose 7 earlier MahaRERA projects: declares 2 of 7 past projects completed on time. Read the full track record.

Frequently asked questions

What are my rights if Excalibur by Nahar is delayed beyond 30 Dec 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Excalibur by Nahar?

The registered promoter entity is NAHAR EXCALIBUR PROJECT PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Excalibur by Nahar?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Excalibur by Nahar?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Excalibur by Nahar?

The professionals named in the filing: Architect: Mr. Ketan Vaidya; Engineer: Mahimtura Consultants Private Limited; Chartered Accountant: SNEHA DHIRAJ & COMPNAY; Chartered Accountant: PRAKASH BOHRA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Excalibur by Nahar?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Excalibur by Nahar. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Excalibur by Nahar to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.