ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Eternity Towers

Registered No litigation declared Others project

Eternity Towers

By Siddhivinayak Skylish Developers

RG-MH-35925 · RERA P52100054383 · Last updated on MahaRERA portal: 2 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 10.00 crore secured on the land, in favour of Aditya Birla Capital Limited

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 12%
20 of 78Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 149 documents Report an error

Eternity Towers is a Others project by Siddhivinayak Skylish Developers in Pune, Maharashtra, registered with MahaRERA as P52100054383 on 18 Jan 2024. Possession is promised by 31 Mar 2029. 58 of the 78 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameEternity Towers
  • TypeOthers
  • Location
    • Mumbai Pune Road
    • Pimpri Waghere
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411018
  • Pincode411018
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054383
  • ReraGenie IDRG-MH-35925

Builder

  • NameSiddhivinayak Skylish Developers
  • Entity typeOthers
  • Named personsRajesh Naupatlal Sankla, Yogesh Dnyandeo Wake, Rushabh Rajesh Sakla, Keys Infra Projects LLP, Bluediamond Infracon LLP

Key dates

this monthRegisteredJan 2024PromisedMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Jan 2024
  • Promised completion31 Mar 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed149 files

Current status

74%58 of 78 units booked
28.2%Work done, per cost certificate

Figures as on 2 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA1311502878

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 12%.

Building A: 28% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure12%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed78

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots78
Closed/Covered78

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area6,161 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Capital Limited
Secured amountRs 10.00 crore
CERSAI search filedYes
Declared on8 Aug 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI22092.33
Proposed, not sanctioned7,838 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Maruti House, Plot No GP 187, G Block, MIDC, Pimpri Chinchwad Industrial Area, Thermax Chowk, Pune - 411019
Estimated costRs 60.00 cr
Cost incurredRs 16.93 cr
Work done28.21%
BuildingWingEstimatedIncurred
Building ANARs 51.00 crRs 16.93 cr
-NARs 9.00 cr-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCubix Architects Associates
EngineerBalkrishna Ramdas Kalbhor
Chartered AccountantNavdeep Jindal & Associates
PartnerRole in project
Siddhivinayak Skylish Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2029

Documents filed149

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 149 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Mar 26.pdf2 Jun 2026
Withdrawal Update Form 1File: Form 1 Mar 26.pdf2 Jun 2026
Withdrawal Update Form 2File: form 2 Mar 26.pdf2 Jun 2026
Withdrawal Update Form 2File: form 2 Mar 26.pdf2 Jun 2026
Withdrawal Update Form 3File: FORM 3 Dec 25 1.pdf2 Jun 2026
Withdrawal Update Form 3File: FORM 3 Mar 26 compressed.pdf2 Jun 2026
Withdrawal Update Form 1File: form 1 Dec 25 Signed.pdf1 Jun 2026
Withdrawal Update Form 2File: FORM 2 Dec 25.pdf1 Jun 2026
Withdrawal Update Form 3File: FORM 3 Dec 25 1.pdf1 Jun 2026
Withdrawal Update Form 1File: Form-1 Etrnity Tower Sept 25.pdf13 Dec 2025
Withdrawal Update Form 2File: Form-2 Eternity Towers Sept 25.pdf13 Dec 2025
Withdrawal Update Form 3File: Form-3 Eternity Toers Sept-25.pdf13 Dec 2025
Form 5 (FY 2024-2025)File: Form 5.pdf3 Dec 2025
Form 2A (FY 2024-2025)File: form 2 A SSD 7-10-2025001.pdf9 Oct 2025
Withdrawal Update Form 1File: FORM-1SIDDHIVINAYAK SKYLISH DEVLOPERS DATE 31-3-2025 WITH STAMP.pdf29 Aug 2025
Withdrawal Update Form 2File: Form 2.pdf29 Aug 2025
Withdrawal Update Form 3File: FORM 3 SSD Signed.pdf29 Aug 2025
Form 1File: Form 1 June 25_0001.pdf2 Aug 2025
Form 2File: Form 2 June 25.pdf2 Aug 2025
Form 3File: Form-3 June 25.pdf2 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold UNsold Etrnity Towers June 25.pdf2 Aug 2025
Form 2File: Form 2 2024.pdf14 Jul 2025
Form 3File: FORM 3 Skylish_compressed.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOURE OF SOLD-BOOKED INV.pdf14 Jul 2025
Form 1File: Form 1.pdf14 Jul 2025
Form 1File: Form 1.pdf14 Jul 2025
Form 2File: Form 2.pdf14 Jul 2025
Form 3File: FORM 3 SSD Signed.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf14 Jul 2025
Form 1File: FORM 1 SSD ETERNITY TOWERS 30092024.pdf14 Jul 2025
Form 2File: Form-2 sept 24.pdf14 Jul 2025
Form 3File: Eternity towers sept 24 form-3.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold-unsold Eternity Towers Sept 24.pdf14 Jul 2025
Form 1File: FORM 1 SSD ETERNITY TOWERS 31122024.pdf14 Jul 2025
Form 2File: Form 2 Eternity towers Signed and stamped 10012025.pdf14 Jul 2025
Form 3File: Form-3 Eternity towers dec 24.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold-unsold Eternity Towers Dec 24.pdf14 Jul 2025
Form 1File: FORM-1SIDDHIVINAYAK SKYLISH DEVLOPERS DATE 31-3-2025 WITH STAMP.pdf14 Jul 2025
Form 2File: FORM-2 SIDDHIVINAYAK SKYLISH DEVLOPERS DATE 31-3-2025_001.pdf14 Jul 2025
Form 3File: FORM-3 SIDDHIVINAYAK SKYLISH DEVLOPERS DATE 31-3-2025_001.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold-unsold Eternity Towers Dec 24.pdf14 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SSD ETERNITY TOWERS 30092024.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SSD ETERNITY TOWERS 31122024.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1SIDDHIVINAYAK SKYLISH DEVLOPERS DATE 31-3-2025 WITH STAMP.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 SIDDHIVINAYAK SKYLISH DEVLOPERS DATE 31-3-2025_001.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 sept 24.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eternity towers Signed and stamped 10012025.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 SIDDHIVINAYAK SKYLISH DEVLOPERS DATE 31-3-2025_001.pdf25 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold-unsold Eternity Towers Sept 24.pdf29 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold-unsold Eternity Towers Dec 24.pdf29 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Eternity towers sept 24 form-3.pdf19 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Eternity towers dec 24.pdf19 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 SEPT 24.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Signed.pdf8 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SSD Signed.pdf8 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf23 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf23 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 23-24.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: revised format001 sold unsold skylish.pdf5 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOURE OF SOLD-BOOKED INV.pdf25 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Skylish_compressed.pdf25 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 23-24_compressed.pdf25 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate 2024.pdf13 Jun 2024
Layout approvalFile: Layout_5_11zon.pdf11 Feb 2024
Building plan approvalFile: Basement Plan 01_4_11zon.pdf11 Feb 2024
Building plan approvalFile: Basement Plan 00_2_11zon.pdf11 Feb 2024
Building plan approvalFile: Floor Plan 00_1_11zon.pdf11 Feb 2024
Building plan approvalFile: Floor Plan 01_3_11zon.pdf11 Feb 2024
Building plan approvalFile: Floor Plan 02_1_11zon.pdf11 Feb 2024
Building plan approvalFile: Floor Plan 03_2_11zon.pdf11 Feb 2024
Building plan approvalFile: Floor Plan 04_4_11zon.pdf11 Feb 2024
Building plan approvalFile: Elevation_3_11zon.pdf11 Feb 2024
Copy of Layout Approval (in case of layout)File: Layout_5_11zon.pdf11 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Basement Plan 01_4_11zon.pdf11 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Basement Plan 00_2_11zon.pdf11 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Floor Plan 00_1_11zon.pdf11 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Floor Plan 01_3_11zon.pdf11 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Floor Plan 02_1_11zon.pdf11 Feb 2024

How this compares with Pune

74%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Eternity Towers on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pimpri Waghere13,700+ in Pune

2 kmEternity TowersCompleted 65Lapsed / revoked 35Other 128Dot size: filed unitsN

Filed coordinates, straight-line distance. 228 registered projects within 2 km.

Builder: Siddhivinayak Skylish Developers

Siddhivinayak Skylish Developers has 1 registration on MahaRERA, including Eternity Towers. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Eternity Towers is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Eternity Towers?

The registered promoter entity is Siddhivinayak Skylish Developers, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Eternity Towers?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Eternity Towers?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Eternity Towers?

The professionals named in the filing: Architect: Cubix Architects Associates; Engineer: Balkrishna Ramdas Kalbhor; Chartered Accountant: Navdeep Jindal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Eternity Towers?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Eternity Towers. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Eternity Towers to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.