ReraGenieLog inGet a buyer report

Home / Browse projects / DB Views

Registered No litigation declared Residential / Group Housing project

DB Views

By M/s Shree Shantinagar Venture

RG-MH-26531 · RERA P51900004016 · Last updated on MahaRERA portal: 22 May 2023

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2026Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
3Complaints at MahaRERAon this registration
Jump to the 49 documents Report an error

DB Views is a Residential / Group Housing project by M/s Shree Shantinagar Venture in 400011, registered with MahaRERA as P51900004016 on 7 Aug 2017. Possession is promised by 30 Dec 2026. 3 complaints are on record with the regulator.

At a glance

Project

  • NameDB Views
  • TypeResidential / Group Housing
  • Location
    • 400011
  • Pincode400011
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900004016
  • ReraGenie IDRG-MH-26531

Builder

  • NameM/s Shree Shantinagar Venture
  • Entity typeOthers
  • Named personsNeelkamal Shantinagar Properties Private Limited, Shankala Realtors Private Limited

Key dates

this monthRegisteredAug 2017PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Aug 2017
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed49 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DB ViewsNA640000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

DB Views: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed48

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots48
Closed/Covered48

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,507 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI9597.75
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Moti Mahal, Dr Annie Besant Road, Worli, Mumbai 400018

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPradeep Harackar
PartnerRole in project
M/s Shree Shantinagar Venture-

Litigation declared4

CaseCourtStatus
Summary Suit No 80 of 2014/2014High Court BombayMatter pending for orders
CC No 13/370/2013State Commission MaharashtraMatter kept for Arguments
Summary Suit No 58 of 2016/2016City Civil Court Dindoshi MumbaiMatter kept for hearing summons of judgement
CC No 14/49/2013State Commission MaharashtraMatter pending

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000000498SUMIT BHALOTIANEELKAMAL SHANTINAGAR PROPERTIES PVT LTD09/09/2017
CC006000000057004Joy KapurDB Realty Limited21/11/2018
CC006000000195319Joy KapurD B Realty Ltd, Neelkamal Shantinagar Properties Pvt. Ltd., M/s. Shree Shanti Nagar Venture23/12/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed49

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: 20201231 FORM 3.pdf22 May 2023
Certificates of CA (Form 3)File: 20210331 FORM 3.pdf22 May 2023
Certificates of CA (Form 3)File: 20210630 FORM 3.pdf22 May 2023
Certificates of CA (Form 3)File: 20210930 FORM 3.pdf22 May 2023
Certificates of CA (Form 3)File: 20211231 FORM 3.pdf22 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Shri Shanti Nagar March 2020.pdf29 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Shri Shanti Nagar June 2020.pdf29 Oct 2020
Certificates of CA (Form 5)File: DB view.pdf30 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Shantinagar Dec Qtr.pdf2 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Shree Shantinagar Venture March Qtr.pdf2 Sep 2020
Certificates of CA (Form 3)File: Form 3 DB Views.pdf2 Sep 2020
Certificates of CA (Form 3)File: Form-3- DB View March 2020_compressed.pdf2 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - DB Views Phase 1 Sep.pdf3 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - DB Views Phase 1 Dec.pdf3 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DB Views form 2.pdf31 Dec 2019
Certificates of CA (Form 3)File: Shantinagar DB Views Form 3_compressed.pdf31 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate - DB View.pdf6 Nov 2019
Certificates of CA (Form 3)File: Form-3_DB View_June,19_compressed.pdf29 Oct 2019
Certificates of CA (Form 5)File: Form-5_DB Views.pdf30 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch certi Mar 19- DB View P1.pdf29 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engg Certi March 2019.pdf29 Jul 2019
Form 2AFile: Form 2A March 19.pdf29 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q6 (Dec18) Form2 - DB View.pdf15 Apr 2019
Certificates of CA (Form 3)File: Q6 (Dec18) Form3 - DB Views.pdf15 Apr 2019
Certificates of CA (Form 3)File: Q4 (Jun18) Form3 - DB Views - Pt1.pdf21 Oct 2018
Certificates of CA (Form 3)File: Q4 (Jun18) Form3 - DB Views - Pt2.pdf21 Oct 2018
Certificates of CA (Form 5)File: Form 5 (Jul17 - Mar18) DB Views.pdf29 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q2 - Form 1 DB Views.pdf31 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q2 Form-2 DB views.pdf31 Mar 2018
Certificates of CA (Form 3)File: Q2 - Form 3 DB Views (pt1).pdf31 Mar 2018
Certificates of CA (Form 3)File: Q2 - Form 3 DB Views (pt2).pdf31 Mar 2018
Certificates of CA (Form 3)File: Q1 (Sep17) form 3 - DB Views pt1.pdf23 Feb 2018
Certificates of CA (Form 3)File: Q1 (Sep17) form 3 - DB Views pt2.pdf23 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q1 (Sep17) Form-1 DB View.pdf22 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q1 (Sep17) Form 2 - DB Views.pdf22 Feb 2018
Building plan approvalFile: Building Plan Approval IOD.pdf29 Jul 2017
Layout approvalFile: Approved Layout copy.pdf29 Jul 2017
PAN CardFile: ECC-DB JV - Pan Card.PDF29 Jul 2017
Copy of the legal title reportFile: Legal Title Report pt1.pdf29 Jul 2017
Details of encumbrancesFile: Details of Encumbrances - Pt1.pdf29 Jul 2017
Details of encumbrancesFile: Details of Encumbrances - Pt2.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: Approved Layout copy.pdf29 Jul 2017
Building Plan Approval (IOD)File: Building Plan Approval IOD.pdf29 Jul 2017
Declaration in FORM BFile: Decleration in Form B.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 Architects Certificate.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Engineers Certificate.pdf29 Jul 2017
Certificates of CA (Form 3)File: Form-3 CAs Certificate part 1.pdf29 Jul 2017
Certificates of CA (Form 3)File: Form-3 CAs Certificate part 2.pdf29 Jul 2017
Proforma of Allotment letterFile: Proforma of the Allotment Letter and AFS.pdf29 Jul 2017

Keep DB Views on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near this project

Builder: M/s Shree Shantinagar Venture

M/s Shree Shantinagar Venture has 1 registration on MahaRERA, including DB Views. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if DB Views is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DB Views?

The registered promoter entity is M/s Shree Shantinagar Venture, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DB Views?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against DB Views?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for DB Views?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DB Views?

The professionals named in the filing: Architect: Pradeep Harackar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DB Views?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DB Views. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DB Views to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.