Dadamiyas Emerald
By Dadamiya Infrastructure LLP
RG-MH-18170 · RERA P51800056273 · Last updated on MahaRERA portal: 20 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Dadamiyas Emerald is a Residential / Group Housing project by Dadamiya Infrastructure LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800056273 on 22 May 2024. Possession is promised by 31 Mar 2027. 7 of the 96 units on this registration are recorded sold or booked, and 29 of 33 construction stages are filed complete.
At a glance
Project
- NameDadamiyas Emerald
- TypeResidential / Group Housing
- Location
- New Hall Road
- Kurla West
- Kurla
- Mumbai Suburban
- 400070
- Pincode400070
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800056273
- ReraGenie IDRG-MH-18170
Builder
- NameDadamiya Infrastructure LLP
- Entity typeOthers
- LLPINAAN-5758
- GSTIN27AAPFD4553J1Z1
- LLPIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Designated PartnersMoinuddin Shahid Shaikh Shahid Shaikh, Sana Moinuddin Shaikh Moinuddin Shaikh
- Other registrations2 more →
- Declared earlier projects4 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 May 2024
- Promised completion31 Mar 2027
- Revised completionNone
- Buildings3 building records
- Documents filed92 files
Current status
Figures as on 20 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Dadamiya Emerald - Wing A | NA | 5 | 5 | 27 | 9 | 36 |
| Dadamiya Emerald - Wing B | NA | 7 | 5 | 40 | 0 | 40 |
| Dadamiya Emerald - Wing C | NA | 7 | 5 | 20 | 0 | 20 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
29 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.
Dadamiya Emerald - Wing A82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Dadamiya Emerald - Wing B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Dadamiya Emerald - Wing C91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed37
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| Dadamiya Emerald - Wing B | 24 | 24 |
| Dadamiya Emerald - Wing C | 13 | 13 |
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Al-Qadri C.H.S. Ltd. | Kurla | Mumbai Suburban |
| Sheetal Chandrika C.H.S. Ltd. | Kurla | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Dadamiya Emerald - Wing B | NA | Rs 3.75 cr | Rs 4.15 cr |
| Dadamiya Emerald - Wing C | NA | Rs 2.25 cr | Rs 2.49 cr |
| Dadamiya Emerald - Wing A | NA | Rs 1.50 cr | Rs 1.66 cr |
| - | NA | Rs 80.00 lakh | Rs 80.00 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sana N Malik Shaikh N Malik Shaikh |
| Engineer | Bopari Mohammed Farooque Nizamuddin Nizamuddin Bopari |
| Chartered Accountant | A. R. Sodha & Co |
| Chartered Accountant | P.S. Sakhalkar & Co. |
| Partner | Role in project |
|---|---|
| Dadamiya Infrastructure LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Apr 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Apr 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Apr 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed92
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 - Updated Q4 2025-2026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Engineers Certificate on Cost Incurred on Project Emerald Form 2 mar 26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 Emerald Mar 26 Signed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: ENGINEER FORM -DEC 25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: ENGINEER FORM -DEC 25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: ENGINEER FORM -DEC 25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form-3 CA certificate (Dadamiyau0027s Emerald).pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: FORM - 3 EMERALD DEC-25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: FORM - 3 EMERALD DEC-25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1-Dadamiya’s Emerald.pdf | 20 Oct 2025 |
| Withdrawal Update Form 2File: Engineer’s Certificate on Cost Incurred on Project Emerald (Form 2).pdf | 20 Oct 2025 |
| Withdrawal Update Form 3File: Form-3 CA certificate (Dadamiyau0027s Emerald).pdf | 20 Oct 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 EMERALD.pdf | 18 Oct 2025 |
| Withdrawal Update Form 1File: Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 19 Jul 2025 |
| Withdrawal Update Form 2File: Engineeru0027s Certificate form-21.pdf | 19 Jul 2025 |
| Withdrawal Update Form 3File: Emerald RERA FORM 3 CA Signed.pdf | 19 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dadamiya's Emerald (Form-3) CA.pdf | 21 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 ENGINEER FORM NO 02 - EMERALD.pdf | 21 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 12 Apr 2025 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf | 12 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: 2444596_FurtherCC_signed.pdf | 22 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 EMERALD.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 EMERALD.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 EMERALD.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 ENGINEER FORM NO 02 - SEPT 24 EMERALD.pdf | 10 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 ENGINEER FORM NO 02 - SEPT 24 EMERALD.pdf | 10 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (Dadamiya's Emerald) CA Certified_compressed.pdf | 10 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 (Dadamiya's Emerald) CA Certified.pdf | 10 Oct 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of sold-Booked Inventory Word.pdf | 10 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory Word.pdf | 10 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 ENGINEER FORM NO 02 - SEPT 24 EMERALD.pdf | 10 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 ENGINEER FORM NO 02 - SEPT 24 EMERALD.pdf | 10 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (Dadamiya's Emerald) CA Certified_compressed.pdf | 10 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 (Dadamiya's Emerald) CA Certified.pdf | 10 Oct 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of sold-Booked Inventory Word.pdf | 10 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory Word.pdf | 10 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 ENGINEER FORM NO 02 - SEPT 24 EMERALD.pdf | 10 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 ENGINEER FORM NO 02 - SEPT 24 EMERALD.pdf | 10 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (Dadamiya's Emerald) CA Certified_compressed.pdf | 10 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 (Dadamiya's Emerald) CA Certified.pdf | 10 Oct 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of sold-Booked Inventory Word.pdf | 10 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory Word.pdf | 10 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (Dadamiya's Emerald) CA Certified_compressed.pdf | 10 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 ENGINEER FORM NO 02 - SEPT 24 EMERALD.pdf | 10 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 ENGINEER FORM NO 02 - SEPT 24 EMERALD.pdf | 10 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory Word.pdf | 10 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 (Dadamiya's Emerald) CA Certified.pdf | 10 Oct 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of sold-Booked Inventory Word.pdf | 10 Oct 2024 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf | 6 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 2441764_FurtherCC_signed.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Updated.pdf | 6 Oct 2024 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf | 6 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 2441764_FurtherCC_signed.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Updated.pdf | 6 Oct 2024 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf | 6 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 2441764_FurtherCC_signed.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Updated.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Updated.pdf | 6 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 2441764_FurtherCC_signed.pdf | 6 Oct 2024 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - emerald.pdf | 16 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer form 02 - AL QADRI.pdf | 16 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Emerald sbi withdraw (AR Sodha).pdf | 16 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Plinth CC 28022024.pdf | 26 Apr 2024 |
| Details of encumbrances concerned to FinanceFile: encumbrance certificate.pdf | 18 Apr 2024 |
| Details of encumbrances concerned to LegalFile: encumbrance certificate.pdf | 18 Apr 2024 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf | 18 Apr 2024 |
| CERSAI detailsFile: cersai letter.pdf | 18 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf | 18 Apr 2024 |
| Proforma of Agreement for saleFile: model form of agreement.pdf | 18 Apr 2024 |
| Proforma of Allotment letterFile: Proforma of Allotment letter Dadamya.pdf | 18 Apr 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Dadamiya's Deluxe ApartmentP51800030492 | Kurla West, Mumbai Suburban | 62 | Aug 2021 | Completed | Mar 2023 | Late, May 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 92 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Dadamiyas Emerald on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kurla West6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 253 registered projects within 2 km.
Sayba Badr
Star Shine
Yojan One
MERU REALTY LLP
SAYBA ELYSIA
SAYBA HOME MAKERS
Sayba Olympia
Star Shine
Kohinoor City Residential Phase 2 Block 2
Kohinoor Developers
DSK MADHUKOSH
D S Kulkarni Developers Limited
See every Mumbai Suburban project, with the district possession charts
Builder: Dadamiya Infrastructure LLP
Dadamiya Infrastructure LLP has 3 registrations on MahaRERA, including Dadamiyas Emerald and Ambrose Heights. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Dadamiyas Emerald is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Dadamiyas Emerald?
The registered promoter entity is Dadamiya Infrastructure LLP, an others as per the filing. Its LLPIN AAN-5758 and GSTIN 27AAPFD4553J1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Dadamiyas Emerald?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Dadamiyas Emerald?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Dadamiyas Emerald?
The professionals named in the filing: Architect: Sana N Malik Shaikh N Malik Shaikh; Engineer: Bopari Mohammed Farooque Nizamuddin Nizamuddin Bopari; Chartered Accountant: A. R. Sodha & Co; Chartered Accountant: P.S. Sakhalkar & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Dadamiyas Emerald?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback