Home / Browse projects / Mumbai Suburban, Maharashtra / Dadamiyas Emerald

Registered No litigation declared Residential / Group Housing project

Dadamiyas Emerald

By Dadamiya Infrastructure LLP

RG-MH-18170 · RERA P51800056273 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
29 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
89 of 96Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

Dadamiyas Emerald is a Residential / Group Housing project by Dadamiya Infrastructure LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800056273 on 22 May 2024. Possession is promised by 31 Mar 2027. 7 of the 96 units on this registration are recorded sold or booked, and 29 of 33 construction stages are filed complete.

At a glance

Project

  • NameDadamiyas Emerald
  • TypeResidential / Group Housing
  • Location
    • New Hall Road
    • Kurla West
    • Kurla
    • Mumbai Suburban
    • 400070
  • Pincode400070
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800056273
  • ReraGenie IDRG-MH-18170

Builder

  • NameDadamiya Infrastructure LLP
  • Entity typeOthers
  • LLPINAAN-5758
  • GSTIN27AAPFD4553J1Z1
  • LLPIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Designated PartnersMoinuddin Shahid Shaikh Shahid Shaikh, Sana Moinuddin Shaikh Moinuddin Shaikh
  • Other registrations2 more →
  • Declared earlier projects4 →

Key dates

this monthRegisteredMay 2024PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 May 2024
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed92 files

Current status

7%7 of 96 units booked
109.7%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Dadamiya Emerald - Wing ANA5527936
Dadamiya Emerald - Wing BNA7540040
Dadamiya Emerald - Wing CNA7520020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

29 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

Dadamiya Emerald - Wing A82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Dadamiya Emerald - Wing B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Dadamiya Emerald - Wing C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed37

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots37
Open Space37
BuildingOpen SpaceTotal
Dadamiya Emerald - Wing B2424
Dadamiya Emerald - Wing C1313

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,565 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Sep 2024
LandownerVillageDistrict
Al-Qadri C.H.S. Ltd.KurlaMumbai Suburban
Sheetal Chandrika C.H.S. Ltd.KurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI4019.67
Proposed, not sanctioned3,948 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCorporate Park No II, Plot No 8, Unit No 11, Sion Trombay Road, Chembur, Mumbai - 400071
Estimated costRs 8.30 cr
Cost incurredRs 9.11 cr
Work done109.72%
BuildingWingEstimatedIncurred
Dadamiya Emerald - Wing BNARs 3.75 crRs 4.15 cr
Dadamiya Emerald - Wing CNARs 2.25 crRs 2.49 cr
Dadamiya Emerald - Wing ANARs 1.50 crRs 1.66 cr
-NARs 80.00 lakhRs 80.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSana N Malik Shaikh N Malik Shaikh
EngineerBopari Mohammed Farooque Nizamuddin Nizamuddin Bopari
Chartered AccountantA. R. Sodha & Co
Chartered AccountantP.S. Sakhalkar & Co.
PartnerRole in project
Dadamiya Infrastructure LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Updated Q4 2025-2026.pdf20 Apr 2026
Withdrawal Update Form 2File: Engineers Certificate on Cost Incurred on Project Emerald Form 2 mar 26.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 Emerald Mar 26 Signed.pdf20 Apr 2026
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf20 Jan 2026
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf20 Jan 2026
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf20 Jan 2026
Withdrawal Update Form 2File: ENGINEER FORM -DEC 25.pdf20 Jan 2026
Withdrawal Update Form 2File: ENGINEER FORM -DEC 25.pdf20 Jan 2026
Withdrawal Update Form 2File: ENGINEER FORM -DEC 25.pdf20 Jan 2026
Withdrawal Update Form 3File: Form-3 CA certificate (Dadamiyau0027s Emerald).pdf20 Jan 2026
Withdrawal Update Form 3File: FORM - 3 EMERALD DEC-25.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM - 3 EMERALD DEC-25.pdf20 Jan 2026
Withdrawal Update Form 1File: Withdrawal Application Form1-Dadamiya’s Emerald.pdf20 Oct 2025
Withdrawal Update Form 2File: Engineer’s Certificate on Cost Incurred on Project Emerald (Form 2).pdf20 Oct 2025
Withdrawal Update Form 3File: Form-3 CA certificate (Dadamiyau0027s Emerald).pdf20 Oct 2025
Form 5 (FY 2024-2025)File: FORM 5 EMERALD.pdf18 Oct 2025
Withdrawal Update Form 1File: Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf19 Jul 2025
Withdrawal Update Form 2File: Engineeru0027s Certificate form-21.pdf19 Jul 2025
Withdrawal Update Form 3File: Emerald RERA FORM 3 CA Signed.pdf19 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dadamiya's Emerald (Form-3) CA.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 ENGINEER FORM NO 02 - EMERALD.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf12 Apr 2025
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf12 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: 2444596_FurtherCC_signed.pdf22 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 EMERALD.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 EMERALD.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 EMERALD.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 ENGINEER FORM NO 02 - SEPT 24 EMERALD.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 ENGINEER FORM NO 02 - SEPT 24 EMERALD.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (Dadamiya's Emerald) CA Certified_compressed.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 (Dadamiya's Emerald) CA Certified.pdf10 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of sold-Booked Inventory Word.pdf10 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory Word.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 ENGINEER FORM NO 02 - SEPT 24 EMERALD.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 ENGINEER FORM NO 02 - SEPT 24 EMERALD.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (Dadamiya's Emerald) CA Certified_compressed.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 (Dadamiya's Emerald) CA Certified.pdf10 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of sold-Booked Inventory Word.pdf10 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory Word.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 ENGINEER FORM NO 02 - SEPT 24 EMERALD.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 ENGINEER FORM NO 02 - SEPT 24 EMERALD.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (Dadamiya's Emerald) CA Certified_compressed.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 (Dadamiya's Emerald) CA Certified.pdf10 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of sold-Booked Inventory Word.pdf10 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory Word.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (Dadamiya's Emerald) CA Certified_compressed.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 ENGINEER FORM NO 02 - SEPT 24 EMERALD.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 ENGINEER FORM NO 02 - SEPT 24 EMERALD.pdf10 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory Word.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 (Dadamiya's Emerald) CA Certified.pdf10 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of sold-Booked Inventory Word.pdf10 Oct 2024
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf6 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: 2441764_FurtherCC_signed.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Updated.pdf6 Oct 2024
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf6 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: 2441764_FurtherCC_signed.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Updated.pdf6 Oct 2024
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf6 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: 2441764_FurtherCC_signed.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Updated.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Updated.pdf6 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: 2441764_FurtherCC_signed.pdf6 Oct 2024
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - emerald.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer form 02 - AL QADRI.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Emerald sbi withdraw (AR Sodha).pdf16 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Plinth CC 28022024.pdf26 Apr 2024
Details of encumbrances concerned to FinanceFile: encumbrance certificate.pdf18 Apr 2024
Details of encumbrances concerned to LegalFile: encumbrance certificate.pdf18 Apr 2024
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf18 Apr 2024
CERSAI detailsFile: cersai letter.pdf18 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf18 Apr 2024
Proforma of Agreement for saleFile: model form of agreement.pdf18 Apr 2024
Proforma of Allotment letterFile: Proforma of Allotment letter Dadamya.pdf18 Apr 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Dadamiya's Deluxe ApartmentP51800030492Kurla West, Mumbai Suburban62Aug 2021CompletedMar 2023Late, May 2023

How this compares with Mumbai Suburban

7%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Dadamiyas Emerald on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla West6,700+ in Mumbai Suburban

2 kmDadamiyas EmeraldCompleted 73Lapsed / revoked 75Other 105Dot size: filed unitsN

Filed coordinates, straight-line distance. 253 registered projects within 2 km.

Builder: Dadamiya Infrastructure LLP

Dadamiya Infrastructure LLP has 3 registrations on MahaRERA, including Dadamiyas Emerald and Ambrose Heights. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Dadamiyas Emerald is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Dadamiyas Emerald?

The registered promoter entity is Dadamiya Infrastructure LLP, an others as per the filing. Its LLPIN AAN-5758 and GSTIN 27AAPFD4553J1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Dadamiyas Emerald?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Dadamiyas Emerald?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Dadamiyas Emerald?

The professionals named in the filing: Architect: Sana N Malik Shaikh N Malik Shaikh; Engineer: Bopari Mohammed Farooque Nizamuddin Nizamuddin Bopari; Chartered Accountant: A. R. Sodha & Co; Chartered Accountant: P.S. Sakhalkar & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Dadamiyas Emerald?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Dadamiyas Emerald. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Dadamiyas Emerald to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.