Home / Browse projects / Mumbai Suburban, Maharashtra / SAYBA ELYSIA

Registered No litigation declared Others project

SAYBA ELYSIA

By SAYBA HOME MAKERS

RG-MH-19241 · RERA P51800078321 · Last updated on MahaRERA portal: 25 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jul 2027Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 90%
276 of 326Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

SAYBA ELYSIA is a Others project by SAYBA HOME MAKERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800078321 on 4 Dec 2024. Possession is promised by 31 Jul 2027. 50 of the 326 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameSAYBA ELYSIA
  • TypeOthers
  • Location
    • AT S.G.BARVE MARG & MEHTAB LANE
    • KURLA
    • Mumbai Suburban
    • 400070
  • Pincode400070
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800078321
  • ReraGenie IDRG-MH-19241

Builder

  • NameSAYBA HOME MAKERS
  • Entity typePartnership
  • PartnersABDULRAHIM ISMAIL PAYAK, SHAIKH FIROZ JHINKU AHMED, SHAKEEL AHMAD MOHAMMAD

Key dates

this monthRegisteredDec 2024PromisedJul 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Dec 2024
  • Promised completion31 Jul 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed65 files

Current status

15%50 of 326 units booked
82.7%Work done, per cost certificate

Figures as on 25 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA16151195124
B WINGNA161519012202

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 90%.

A WING62%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B WING62%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes60%
Water conservation /Rain water harvestingYes40%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed55

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots55
Closed/Covered55
BuildingClosed/CoveredTotal
A WING2828
B WING2727

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,224 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Oct 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI13065.25
Proposed, not sanctioned13,065 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchIST FLOOR, GOL BUILDING, OPP. HOMI BHABHA HOS
Estimated costRs 18.40 cr
Cost incurredRs 15.22 cr
Work done82.73%
BuildingWingEstimatedIncurred
A WINGNARs 9.20 crRs 7.61 cr
B WINGNARs 9.20 crRs 7.61 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKaushal Chouhan
EngineerR.F CONSULTANTS
EngineerHabib Ansari
Chartered AccountantSKDJ & CO
Chartered AccountantKapil M Gupta
Chartered AccountantFaheem Akhter Ansari
PartnerRole in project
SAYBA HOME MAKERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2027

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Sayba Elysia March 2026.pdf25 Apr 2026
Withdrawal Update Form 2File: Form 2 Sayba Elysia March 2026.pdf25 Apr 2026
Withdrawal Update Form 3File: Form 3 Sayba Elysia March 2026.pdf25 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A Sayba Elysia 2025-2026.pdf18 Apr 2026
Form 5 (FY 2024-2025)File: Form 5 Sayba Elysia 2024-2025.pdf30 Mar 2026
Withdrawal Update Form 1File: Form 1 Sayba Elysia Dec 2025.pdf4 Feb 2026
Withdrawal Update Form 2File: Form 2 Sayba Elysia Dec 2025.pdf4 Feb 2026
Withdrawal Update Form 3File: Form 3 Sayba Elysia Dec 2025.pdf4 Feb 2026
Withdrawal Update Form 1File: Form 1 Sayba Elysia Sept 25.pdf5 Nov 2025
Withdrawal Update Form 2File: Form 2 Sayba Elysia Sept 25.pdf5 Nov 2025
Withdrawal Update Form 3File: Form 3 Sayba Elysia Sept 25.pdf5 Nov 2025
Form 1File: Form 1 Sayba Elysia June 25.pdf29 Aug 2025
Form 2File: Form 2 Sayba Elysia June 25.pdf29 Aug 2025
Form 3File: Form 3 Sayba Elysia June 25.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sold Booked Inventory Sayba Elysia June 25.pdf29 Aug 2025
Self-declaration of Quarterly ProgressFile: Self Declaration Sayba Elysia June 25.pdf29 Aug 2025
Form 1File: Form 1 Sayba Elysia Q4.pdf16 Jun 2025
Form 2File: Form 2 Sayba Elysia Q4.pdf16 Jun 2025
Form 3File: Form 3 Sayba Elysia March Q4.pdf16 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sold Inventory Sayba Elysia Q4.pdf16 Jun 2025
Self-declaration of Quarterly ProgressFile: Sayba Elysia Self Declaration RERA QPR Q4.pdf16 Jun 2025
Form 2A (FY 2024-2025)File: Form 2A Sayba Elysia Q4.pdf13 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4 Form 1 Sayba Elysia.pdf9 Apr 2025
Disclosure of sold/ booked inventoryFile: Elysia Sold.pdf4 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA SAYBA ELYSIA.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SAYBA ELYSIA ENGINEER.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SAYBA ELYSIA ARCHITECT CERTIFICATE.pdf16 Jan 2025
Other - LegalFile: declration.pdf13 Nov 2024
Deviation Report with respect to model copy of AgreementFile: SaybaElysia_Devition Clause_17-end.pdf13 Nov 2024
Other - LegalFile: Deed of conveyance A R Associates (1).pdf16 Oct 2024
Other - LegalFile: A R Associates Partnership Deed (1)_rotated_rotated (1).pdf16 Oct 2024
Other - LegalFile: Deed of conveyance Sayba Home makers (1).pdf16 Oct 2024
Other - LegalFile: AR Associates Retirement FINAL (1).pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Elysai Ca certificate (1) (1).pdf5 Aug 2024
Other - TechnicalFile: Declaration-Cum-Undertaking (1).pdf5 Aug 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Eleshiya Bank Letter_221024 (2).pdf5 Aug 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclousure mehtab secured Loan (1).pdf5 Aug 2024
Proforma of Allotment letterFile: Allotment Letter RIJJU - Sale Sayba Elysia NO CHANGES no deviation (1).pdf26 Jul 2024
Deviation Report with respect to Allotment letterFile: Mehtab Allotment D and CC Decl_2-end.pdf26 Jul 2024
Deviation Report with respect to model copy of AgreementFile: SaybaElysia_Devition Clause_1-16.pdf26 Jul 2024
Proforma of Agreement for saleFile: riju_syaba_agreement_for_sale_amrked_in_red_to_be_removed_marked_in_blue_changes_made_by_u26 Jul 2024
Layout approvalFile: 4.pdf24 Jul 2024
Layout approvalFile: 3.pdf24 Jul 2024
Layout approvalFile: 2.pdf24 Jul 2024
Layout approvalFile: IOD Drawing Dtd (FINAL).pdf24 Jul 2024
Copy of Layout Approval (in case of layout)File: IOD Drawing Dtd (FINAL).pdf24 Jul 2024
Copy of Layout Approval (in case of layout)File: 2.pdf24 Jul 2024
Copy of Layout Approval (in case of layout)File: 3.pdf24 Jul 2024
Copy of Layout Approval (in case of layout)File: 4.pdf24 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Mehtab Bank Format A Letter of promoter (1).pdf24 Jul 2024
Copy of the legal title reportFile: Title Report_SaybaHomeMakers.pdf23 Jul 2024
Details of encumbrances concerned to FinanceFile: no encumbarance.pdf23 Jul 2024
Declaration in FORM BFile: Form b.pdf23 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mehtab Form 1 Architect.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mehtab Form 2 Structural.pdf23 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Plinth cc .pdf23 Jul 2024
Declaration about Commencement CertificateFile: Mehtab Allotment D and CC Decl_1-1.pdf23 Jul 2024
CERSAI detailsFile: cersai.pdf23 Jul 2024
Details of encumbrances concerned to LegalFile: no encumbarance.pdf23 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure.pdf23 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclousure.pdf23 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure 3.pdf23 Jul 2024
Building plan approvalFile: IOD Letter Dtd 30 May 2023.pdf28 Mar 2024
PAN CardFile: Sayba Home Makers Pan Card.pdf28 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Letter Dtd 30 May 2023.pdf28 Mar 2024

How this compares with Mumbai Suburban

15%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAYBA ELYSIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KURLA6,700+ in Mumbai Suburban

2 kmSAYBA ELYSIACompleted 98Lapsed / revoked 89Other 120Dot size: filed unitsN

Filed coordinates, straight-line distance. 307 registered projects within 2 km.

Builder: SAYBA HOME MAKERS

SAYBA HOME MAKERS has 1 registration on MahaRERA, including SAYBA ELYSIA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SAYBA ELYSIA is delayed beyond 31 Jul 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAYBA ELYSIA?

The registered promoter entity is SAYBA HOME MAKERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAYBA ELYSIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAYBA ELYSIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAYBA ELYSIA?

The professionals named in the filing: Architect: Kaushal Chouhan; Engineer: R.F CONSULTANTS; Engineer: Habib Ansari; Chartered Accountant: SKDJ & CO; Chartered Accountant: Kapil M Gupta; Chartered Accountant: Faheem Akhter Ansari. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAYBA ELYSIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAYBA ELYSIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAYBA ELYSIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.