ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / CENTRAL PARK

Registered No litigation declared Commercial project

CENTRAL PARK

By KANESA EDIFICE PVT LTD

RG-MH-18743 · RERA P99000077552 · Last updated on MahaRERA portal: 18 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2035Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
59 of 62Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 118 documents Report an error

CENTRAL PARK is a Commercial project by KANESA EDIFICE PVT LTD in Palghar, Maharashtra, registered with MahaRERA as P99000077552 on 10 Oct 2024. Possession is promised by 31 Dec 2035. 3 of the 62 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameCENTRAL PARK
  • TypeCommercial
  • Location
    • PALGHAR - BOISAR ROAD
    • GOTHANPUR AREA
    • Palghar
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000077552
  • ReraGenie IDRG-MH-18743

Builder

  • NameKANESA EDIFICE PVT LTD
  • Entity typeCompany
  • GSTIN27AAJCK7799N1ZC
  • DirectorKARIM ALLAUDDIN AMLANI
  • DirectorsSAHIB KARIM AMLANI, ALIF KARIM ALMANI
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2024PromisedDec 2035

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Oct 2024
  • Promised completion31 Dec 2035
  • Revised completionNone
  • Buildings1 building record
  • Documents filed118 files

Current status

5%3 of 62 units booked
45.0%Work done, per cost certificate

Figures as on 18 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CENTRAL HUBNA8806262

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

CENTRAL HUB: 29% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed154

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots154
Open Space154

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,190 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Jul 2025
LandownerVillageDistrict
ABHIJIT ASHOK TALWALKARPalghar Palghar
KANESA EDIFICE PVT LTDPalghar Palghar

Approvals and building plan

Sanctioning authorityPALGHAR NAGAR PARISHAD
Permissible FSI6181.27
Proposed, not sanctioned6,181 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOPP JAMA MASJID, KACHERI ROAD PALGHAR WEST
Estimated costRs 19.00 cr
Cost incurredRs 8.56 cr
Work done45.05%
BuildingWingEstimatedIncurred
CENTRAL HUBNARs 16.00 crRs 8.56 cr
-NARs 3.00 cr-

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCT ATUL PRAJAPATI
EngineerPROTECH CONSULTANTS
EngineerRajesh Thakor
EngineerRAJESH DUBEY
Chartered AccountantASHWIN NAIR
Chartered AccountantPRASHANT MITTAL AND ASSOCIATES LLP
Chartered AccountantCA Pratik D Jain
Chartered AccountantRSPH & Associates
PartnerRole in project
KANESA EDIFICE PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Jun 2024

Documents filed118

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 118 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 (March 2026).pdf18 Apr 2026
Withdrawal Update Form 2File: Form 2 (March 2026).pdf18 Apr 2026
Withdrawal Update Form 3File: Form 3 (March 2026)-final.pdf18 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A - March 25 .pdf7 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A-March 26.pdf7 Apr 2026
Form 1File: AR - Sept 25 .pdf3 Apr 2026
Form 2File: Form 2 September 2025.pdf3 Apr 2026
Form 3File: Form-3 (Sept-2025).pdf3 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - Sept 25 .pdf3 Apr 2026
Form 1File: AR - June 25 .pdf2 Apr 2026
Form 2File: FORM 2 JUNE 2025.pdf2 Apr 2026
Form 3File: Form-3 (June-2025).pdf2 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - June 25 .pdf2 Apr 2026
Form 1File: AR - Dec 25 .pdf2 Apr 2026
Form 2File: FORM 2 DECEMBER 2025.pdf2 Apr 2026
Form 3File: Form-3 (Dec-2025).pdf2 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - Dec 25 .pdf2 Apr 2026
Form 1File: AR - March 25 .pdf2 Apr 2026
Form 2File: FORM 2 MARCH 2025.pdf2 Apr 2026
Form 3File: Form-3 (March-2025).pdf2 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - March 25 .pdf2 Apr 2026
Form 1File: AR - Dec 24 .pdf2 Apr 2026
Form 2File: Form 2 December 2024.pdf2 Apr 2026
Form 3File: Form-3 (Dec-2024).pdf2 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - Dec 24 .pdf2 Apr 2026
Form 5 (FY 2024-2025)File: Signed RERA audit report .pdf26 Mar 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-ARCHITECT march 2025.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: March -2025 Booked Inventory Central Park Land Owner Share.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: March -2025 Booked Inventory Central Park Developer Share.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-ARCHITECT R1.pdf16 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 667-Central Hub-Form 2 - Engineer Certificate-Dec 25.pdf16 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Inventory Developer share December 2024.pdf12 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Inventory Land Owner share December 2024.pdf12 Feb 2025
Disclosure of sold/ booked inventoryFile: Dev Details December 2024.pdf12 Feb 2025
Proforma of Allotment letterFile: Allotment letter for Central Hub Aug 2024.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 NEW.pdf13 Aug 2024
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter.pdf13 Aug 2024
Deviation Report with respect to model copy of AgreementFile: Deviation for Agreement of Central park .pdf13 Aug 2024
Proforma of Agreement for saleFile: KANESA AFS.pdf13 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Central park Karim Amlani Annexure A .pdf13 Aug 2024
Proforma of Allotment letterFile: Allotment letter for Central Hub Aug 2024.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 NEW.pdf13 Aug 2024
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter.pdf13 Aug 2024
Deviation Report with respect to model copy of AgreementFile: Deviation for Agreement of Central park .pdf13 Aug 2024
Proforma of Agreement for saleFile: KANESA AFS.pdf13 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Central park Karim Amlani Annexure A .pdf13 Aug 2024
Proforma of Allotment letterFile: Allotment letter for Central Hub Aug 2024.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 NEW.pdf13 Aug 2024
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter.pdf13 Aug 2024
Deviation Report with respect to model copy of AgreementFile: Deviation for Agreement of Central park .pdf13 Aug 2024
Proforma of Agreement for saleFile: KANESA AFS.pdf13 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Central park Karim Amlani Annexure A .pdf13 Aug 2024
Details of encumbrances concerned to FinanceFile: NON ENCUMBRANCE LETTER .pdf9 Jul 2024
CERSAI detailsFile: NO CERSAI REPORT .pdf9 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Central park BANK DECLARATION FORMAT A .pdf9 Jul 2024
Details of encumbrances concerned to LegalFile: NON ENCUMBRANCE LETTER .pdf9 Jul 2024
Details of encumbrances concerned to FinanceFile: NON ENCUMBRANCE LETTER .pdf9 Jul 2024
CERSAI detailsFile: NO CERSAI REPORT .pdf9 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Central park BANK DECLARATION FORMAT A .pdf9 Jul 2024
Details of encumbrances concerned to LegalFile: NON ENCUMBRANCE LETTER .pdf9 Jul 2024
Details of encumbrances concerned to FinanceFile: NON ENCUMBRANCE LETTER .pdf9 Jul 2024
CERSAI detailsFile: NO CERSAI REPORT .pdf9 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Central park BANK DECLARATION FORMAT A .pdf9 Jul 2024
Details of encumbrances concerned to LegalFile: NON ENCUMBRANCE LETTER .pdf9 Jul 2024
Declaration in FORM BFile: FORM B Landowner Declaration.pdf6 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Alif Karim Amlani.pdf6 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Sahib Karim Amlani.pdf6 Jul 2024
Declaration in FORM BFile: FORM B Landowner Declaration.pdf6 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Alif Karim Amlani.pdf6 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Sahib Karim Amlani.pdf6 Jul 2024
Declaration in FORM BFile: FORM B Landowner Declaration.pdf6 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Alif Karim Amlani.pdf6 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Sahib Karim Amlani.pdf6 Jul 2024
Other - TechnicalFile: Kanesa Edifice Pvt Ltd Mechanical Room Report (1).pdf3 Jul 2024
Other - TechnicalFile: Kanesa Edifice Pvt Ltd Mechanical Room Report (1).pdf3 Jul 2024
Other - TechnicalFile: Kanesa Edifice Pvt Ltd Mechanical Room Report (1).pdf3 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ARCHITECT BUILDING COMPLETION CERTIFICATE.pdf29 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ARCHITECT BUILDING COMPLETION CERTIFICATE.pdf29 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ARCHITECT BUILDING COMPLETION CERTIFICATE.pdf29 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: N P Building Permission.pdf25 Jun 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
CRESCENTPOINT-IIP99000020521KALAWATI MANDIR AREA, PalgharApr 2019CompletedDec 2024Registered original: Dec 2022Dec 2024

How this compares with Palghar

5%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CENTRAL PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GOTHANPUR AREA3,200+ in Palghar

2 kmCENTRAL PARKCompleted 108Lapsed / revoked 50Other 114Dot size: filed unitsN

Filed coordinates, straight-line distance. 272 registered projects within 2 km.

Builder: KANESA EDIFICE PVT LTD

KANESA EDIFICE PVT LTD has 2 registrations on MahaRERA, including CENTRAL PARK and CITY CENTRE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if CENTRAL PARK is delayed beyond 31 Dec 2035?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CENTRAL PARK?

The registered promoter entity is KANESA EDIFICE PVT LTD, a company as per the filing. Its GSTIN 27AAJCK7799N1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CENTRAL PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CENTRAL PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CENTRAL PARK?

The professionals named in the filing: Architect: ARCT ATUL PRAJAPATI; Engineer: PROTECH CONSULTANTS; Engineer: Rajesh Thakor; Engineer: RAJESH DUBEY; Chartered Accountant: ASHWIN NAIR; Chartered Accountant: PRASHANT MITTAL AND ASSOCIATES LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CENTRAL PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CENTRAL PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CENTRAL PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.