Home / Browse projects / Palghar, Maharashtra / CRESCENTPOINT-II

Completed No litigation declared Others project

CRESCENTPOINT-II

By K K CONSTRUCTION

RG-MH-03108 · RERA P99000020521 · Last updated on MahaRERA portal: 15 Mar 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

CRESCENTPOINT-II is a Others project by K K CONSTRUCTION in Palghar, Maharashtra, registered with MahaRERA as P99000020521 on 18 Apr 2019. The registration is recorded completed; possession was promised by 31 Dec 2024. The completion date has moved by 24 months from the original filing.

At a glance

Project

  • NameCRESCENTPOINT-II
  • TypeOthers
  • Location
    • MAHIM - MANOR HIGHWAY ROAD
    • KALAWATI MANDIR AREA
    • Palghar
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000020521
  • ReraGenie IDRG-MH-03108

Builder

  • NameK K CONSTRUCTION
  • Entity typeOthers
  • Named personsNEVIN KARIM AMLANI, ALIF KARIM AMLANI
  • Other registrations4 more →
  • Completed2 of 5
  • Declared earlier projects3 →

Key dates

this monthRegisteredApr 2019First promiseDec 2022Revised toDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Apr 2019
  • Promised completion31 Dec 2024
  • Revised completionRevised to 31 Dec 2024 (originally 31 Dec 2022)
  • Buildings1 building record
  • Documents filed85 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CRESCENT POINT- IINA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

CRESCENT POINT- II: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed70

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots70
Open Space70

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,784 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
SHARADCHANDRA V PADHYEMumbai CityMumbai City
PRAKASH VINAYAK PADHYEMumbai CityMumbai City

Approvals and building plan

Permissible FSI8057.59
Proposed, not sanctioned8,058 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCITY POINT , GROUND FLOOR , KACHERI ROAD, PALGHAR

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHRIKANT YEVALE
ArchitectPROTECH CONSULTANTS RAJESH DUBEY
ArchitectDIMENSIONS PROJECT CONSULTANTS RAJESH BULSARA
EngineerPROTECH CONSULTANTS RAJESH DUBEY
Chartered AccountantCA SANTOSH BARNWAL
PartnerRole in project
K K CONSTRUCTION-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000012850Dec 2022 → Dec 2024

Reason as filed by the promoterDue to the COVID-19 pandemic, the regular flow of work is hampered on account of the unavailability of labor on regular basis. The sales in the market was absolutely bad and hence we could not get enough business and fresh income to run the construction flow as per the schedule. Most of our investors and directors faced issues in fund flow and hence even the additional fund pumping also faced a tough scenarios.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Apr 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Apr 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Jan 2025

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Final Form 5 Crescent Point-II.pdf15 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Crescent Point-II Form-1 (June-2024).pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Crescent Point-II Form-1 (Sept-2024).pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate KKP September 2022-min.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate KKP Dec 2022-min.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate KKP March 2023-min.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate KKP June 2023-min.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate KKP June 2022-min.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate KKP Sept 2023-min.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate KKP December 2023-min.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Crescent Point-II Form-1- (March-2024).pdf25 Feb 2025
Certificates of CA (Form 3)File: 3 CA Sept 23-min.pdf25 Feb 2025
Certificates of CA (Form 3)File: 7 CA Sept 24-min.pdf25 Feb 2025
Certificates of CA (Form 3)File: 6 CA June 24-min.pdf25 Feb 2025
Certificates of CA (Form 3)File: 5 CA Mar 24-min.pdf25 Feb 2025
Certificates of CA (Form 3)File: 4 CA dec 23-min.pdf25 Feb 2025
Certificates of CA (Form 3)File: 2 CAJUne 23-min.pdf25 Feb 2025
Certificates of CA (Form 3)File: 1 CA Mar 23-min.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Crescent Point-II Form-2 (March-2024).pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Crescent Point-II Form-2 (June-2024)_compressed.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Crescent Point-II Form-2 (Oct-2024).pdf25 Feb 2025
Disclosure of sold/ booked inventoryFile: Crescent Point-II Disclosure Of Sold Booked Inventory.pdf10 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: CRESCENT POINT II OC.pdf20 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: CRESCENT POINT II OC.pdf1 Jan 2025
Disclosure of sold/ booked inventoryFile: Crescent Point-II Sold Inventory (Sept-24).pdf23 Dec 2024
Disclosure of sold/ booked inventoryFile: Crescent Point-II Sold-Booked Inventory-June-24.pdf3 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory- Crescent Point March-24.pdf11 Apr 2024
Other - TechnicalFile: Engineer certificate Form -2A.pdf11 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf13 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf13 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Rera Engineer Form 2 Dec2023 .pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 (CPII) June-22.pdf13 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 (CPII) Dec-22.pdf13 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 (CPII) March-23.pdf13 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 (CPII) June-23.pdf13 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 (CPII) Sept-23.pdf13 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 (CPII) Dec-23.pdf13 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 (CPII) Sept-22.pdf13 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 (CPII) June-22.pdf13 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 (CPII) Sept-22.pdf13 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 (CPII) Dec-22.pdf13 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 (CPII) March-23.pdf13 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 (CPII) June-23.pdf13 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 (CPII) Sept-23.pdf13 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 (CPII) Dec-23.pdf13 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclouser.pdf13 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure.pdf13 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Audit Report_22-23 - Finalised.pdf22 Nov 2023
Disclosure of sold/ booked inventoryFile: ilovepdf_merged.pdf27 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: CRESCENT POINT - II APPROVAL ORDER.pdf7 Jun 2023
Disclosure of sold/ booked inventoryFile: Disclosure_compressed.pdf13 Apr 2023
Other - TechnicalFile: Crescent Point-II 2023 (Form-2A)-2.pdf13 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Crescent Point-II 2020.pdf3 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Crescent Point-II 2021.pdf3 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Crescent Point-II 2022.pdf3 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Crescent Point-II (Form-1).pdf15 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Crescent Point-II (Form-2).pdf15 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Crescent Point-II (Form-2).pdf15 Mar 2023
Certificates of CA (Form 3)File: CA Certificate (Form-3)_ As on 31-03-22.pdf14 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: K K Constructions Audit report - 2021-22.pdf14 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: crescent point II form 1 Arct.pdf28 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: crescent point II form 2 Arct.pdf28 Jan 2023
Certificates of CA (Form 3)File: RERA Form 3 (Crescent Point-II) NEW.pdf28 Jan 2023
Disclosure of sold/ booked inventoryFile: revised format(3) (3 files merged).pdf8 Dec 2022
Building plan approvalFile: CRESCENT POINT - II APPROVAL DRAWING.pdf25 Nov 2022
Building Plan Approval (IOD)File: CRESCENT POINT - II APPROVAL DRAWING.pdf25 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: CRESCENT POINT - II APPROVAL ORDER - Copy.pdf25 Nov 2022
Declaration about Commencement CertificateFile: Form-D.pdf11 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: KK Constructions audit Report 19-20.pdf10 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: KK Constructions audit Report 20-21.pdf10 Nov 2022
OtherFile: MAHARERA LETTER PDF.pdf21 Sep 2019
Building plan approvalFile: SCAN PDF SALE PLAN.pdf12 Apr 2019
Layout approvalFile: SCAN PDF LAYOUT PLAN.pdf12 Apr 2019
Copy of Layout Approval (in case of layout)File: SCAN PDF LAYOUT PLAN.pdf12 Apr 2019
Building Plan Approval (IOD)File: SCAN PDF SALE PLAN.pdf12 Apr 2019
Proforma of Allotment letterFile: allotment letter.pdf12 Apr 2019
Proforma of Allotment letterFile: Output 1.pdf12 Apr 2019
Copy of the legal title reportFile: Output 1.pdf9 Apr 2019
Details of encumbrancesFile: Output.pdf9 Apr 2019
Details of encumbrancesFile: Output 1.pdf9 Apr 2019

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
CRESCENT POINT PADHYE COMPLEXOPP HOLY SPIRIT HIGH SCHOOL MAHIM - MANOR HIGHWAY ROAD PALGHAR WEST162CompletedDec 2015Oct 2015
PADHYE COMPLEX - PHASE 1PALGHAR162CompletedOct 2015Oct 2015

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 24 months
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CRESCENTPOINT-II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KALAWATI MANDIR AREA3,200+ in Palghar

2 kmCRESCENTPOINT-IICompleted 128Lapsed / revoked 60Other 147Dot size: filed unitsN

Filed coordinates, straight-line distance. 335 registered projects within 2 km.

Builder: K K CONSTRUCTION

K K CONSTRUCTION has 5 registrations on MahaRERA, including PADHYE COMPLEX PHASE II and CRESCENTPOINT-II. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if CRESCENTPOINT-II is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CRESCENTPOINT-II?

The registered promoter entity is K K CONSTRUCTION, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CRESCENTPOINT-II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CRESCENTPOINT-II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CRESCENTPOINT-II?

The professionals named in the filing: Architect: SHRIKANT YEVALE; Architect: PROTECH CONSULTANTS RAJESH DUBEY; Architect: DIMENSIONS PROJECT CONSULTANTS RAJESH BULSARA; Engineer: PROTECH CONSULTANTS RAJESH DUBEY; Chartered Accountant: CA SANTOSH BARNWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CRESCENTPOINT-II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CRESCENTPOINT-II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CRESCENTPOINT-II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.