Home / Browse projects / Pune, Maharashtra / BRAMHA SKYUZURI PHASE 1

Registration lapsed No litigation declared Commercial project

BRAMHA SKYUZURI PHASE 1

By BRAMHA LEISURES PVT LTD

RG-MH-24324 · RERA P52100006447 · Last updated on MahaRERA portal: 21 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 39 months past the filed date
  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2023Possession promised39 months past this date
2 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 98%
1Complaints at MahaRERAon this registration
Jump to the 151 documents Report an error

BRAMHA SKYUZURI PHASE 1 is a Commercial project by BRAMHA LEISURES PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100006447 on 14 Aug 2017. Possession was promised by 31 Jul 2023 and is now 39 months past that date. 1 complaint is on record with the regulator.

At a glance

Project

  • NameBRAMHA SKYUZURI PHASE 1
  • TypeCommercial
  • Location
    • Pimpri Chwock
    • Opp. PCMC Building
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411018
  • Pincode411018
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100006447
  • ReraGenie IDRG-MH-24324

Builder

  • NameBRAMHA LEISURES PVT LTD
  • Entity typeCompany
  • Managing DirectorVISHAL SURENDRAKUMAR AGARWAL
  • DirectorShivani Vishal Agarwal
  • ChairpersonSURENDRAKUMAR BRAMHADUTT AGRAWAL
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

39 months past promisethis monthRegisteredAug 2017PromisedJul 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on14 Aug 2017
  • Promised completion31 Jul 2023
  • Revised completionNone
  • Buildings3 building records
  • Documents filed151 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C WING - Not a part of this phaseNA00000
B WING - Not a part of this PhaseNA00000
A WINGNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 21 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 98%.

C WING - Not a part of this phase0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B WING - Not a part of this Phase35%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A WING46%
ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)0%
Plinth90%
Stilt Floor0%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises18%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.24%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.4%

Progress on shared amenities15

As on 21 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes25%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed133

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots133
Closed/Covered133

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area13,638 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI16475.66
Proposed, not sanctioned7,415 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBund Garden, Pune, 411001

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPROJECTION STUDIO CONTECT PERSON SANGRAM SALUNKE
ArchitectM S REZA KABUL ARCHITECTS PVT LTD
Engineerstructural engineer services CONTECT PERSON sanjay thigale
PartnerRole in project
BRAMHA LEISURES PVT LTD-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000023390Sandeep Subhashrao DhumalBRAMHA LEISURES PVT. LTD03/09/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jan 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jan 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Sep 2023

Documents filed151

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 151 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 01 Form-2 Dec 23 skyzuri ph 1_0001.pdf21 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Skyzuri ph 1 mar 24 -2_0001.pdf21 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 sky uzuri ph 1 jun 24_0001.pdf21 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 sept 24 Skyzuri ph 1_0001.pdf21 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 02 Form-2 Dec24 SKYZURI_0001.pdf21 Feb 2025
Disclosure of sold/ booked inventoryFile: 01 sold-unsold sky uzuri dec 23.pdf20 Feb 2025
Disclosure of sold/ booked inventoryFile: 02 sold-unsold sky uzuri mar 24.pdf20 Feb 2025
Disclosure of sold/ booked inventoryFile: 03 sold-unsold sky uzuri sept 24.pdf20 Feb 2025
Disclosure of sold/ booked inventoryFile: 04 SPLIT PDF JUNE 24.pdf20 Feb 2025
Disclosure of sold/ booked inventoryFile: 05 sold-unsold ksy uzuri dec 24.pdf20 Feb 2025
Certificates of CA (Form 3)File: 03 form -3 scan sign 0001 (1).pdf15 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: BRAMHA LEISURES PVT LTD PH-1 FORM 5.pdf17 Dec 2024
Certificates of CA (Form 3)File: BLPL FORM 3 SKY UZURI PHASE 1 300624 SIGNED_compressed.pdf6 Dec 2024
Certificates of CA (Form 3)File: BLPL FORM 3 SKY UZURI PHASE 1 111024 SIGNED_compressed.pdf6 Dec 2024
Certificates of CA (Form 3)File: BLPL FORM 3 SKY UZURI 31122023 compressed.pdf13 Nov 2024
Certificates of CA (Form 3)File: Form 3 Signed 2.pdf13 Nov 2024
Copy of the legal title reportFile: 2 Copy of the legal title report.pdf10 May 2024
Declaration in FORM BFile: Form B Sky Uzuri.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: 01 SOLD OR BOOKED DT 30062021.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: 02 SOLD OR BOOKED DT 30092021.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: 03 SOLD OR BOOKED DT 31122021.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: 04 SOLD OR BOOKED DT 31032022.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: 05 SOLD OR BOOKED DT 31062022.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: 06 SOLD OR BOOKED DT 30092022.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: 07 SOLD OR BOOKED DT 31122022.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: 07 SOLD OR BOOKED DT 31122022.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: 08 SOLD OR BOOKED DT 31032023.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: 09 SOLD OR BOOKED DT 30062023_11zon.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: 10 SOLD OR BOOKED DT 30092023_11zon.pdf10 May 2024
CERSAI detailsFile: Cersai.pdf10 May 2024
Certificates of CA (Form 3)File: 01 30092021_1_11zon.pdf10 May 2024
Certificates of CA (Form 3)File: 02 31122021_9_11zon.pdf10 May 2024
Certificates of CA (Form 3)File: 03 31032022_2_11zon.pdf10 May 2024
Certificates of CA (Form 3)File: 04 30062022_3_11zon.pdf10 May 2024
Certificates of CA (Form 3)File: 05 30092022_4_11zon.pdf10 May 2024
Certificates of CA (Form 3)File: 06 31122022_5_11zon.pdf10 May 2024
Certificates of CA (Form 3)File: 07 31032023_6_11zon.pdf10 May 2024
Certificates of CA (Form 3)File: 08 30062023_7_11zon.pdf10 May 2024
Certificates of CA (Form 3)File: 09 30092023_8_11zon.pdf10 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Sky Uzuri.pdf10 May 2024
Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter.pdf10 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation AFS.pdf10 May 2024
Proforma of Agreement for saleFile: 6 Proforma of Allotment letter.pdf12 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Competion Certificate A Bldg Full Dt 25-05-2023.pdf21 Sep 2023
Details of encumbrances concerned to FinanceFile: 4 Sky Uzuri-Declaration of Encubrances Legal.pdf10 Jul 2023
Details of encumbrances concerned to LegalFile: 4 Sky Uzuri-Declaration of Encubrances Legal.pdf10 Jul 2023
Declaration about Commencement CertificateFile: Bramha Sky Uzuri-Declaration about Commencement Certificate 08-06-2023.pdf13 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI Shivani Agarwal 08-06-2023 Bramha Leisures.pdf13 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI Vishal Sir 08-06-2023 Bramha Leisures.pdf12 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI SK Sir 08-06-2023 Bramha Leisures.pdf12 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI SK Sir 08-06-2023 Bramha Leisures.pdf12 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI SK Sir 08-06-2023 Bramha Leisures.pdf12 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: BLPL FORM 5 FY 21-22.PDF1 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: BLPL FORM 5 FY 19-20.PDF1 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: BLPL FORM 5 FY 20-21.PDF1 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: BLPL FORM 5 FY 21-22.PDF1 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION FOR BANK ACCOUNT.PDF14 Feb 2023
Proforma of Allotment letterFile: 4) ATS Draft final 03 03 2022 To Upload.pdf4 Mar 2022
Details of encumbrancesFile: 1 Details of Encumberences.PDF7 Jan 2022
CERSAI detailsFile: CERSAI Report Sky uzuri.pdf5 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CRETIFICATE SkyUzuri 30 09 2021.PDF28 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Q A Certificate Form 2A Skyuzuri 30-09-2021.PDF28 Dec 2021
Proforma of Allotment letterFile: 3) ATS Draft final 10 12 2021 converted.pdf28 Dec 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold Skyuzuri 30 06 2021.pdf27 Oct 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold Skyuzuri 30 09 2021.pdf27 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Q A Certificate Form 2A Skyuzuri 30 06 2021.PDF7 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ar FORM 1 SkyUzuri 30 06 2021.PDF1 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CRETIFICATE SkyUzuri Form2 30 06 2021.PDF1 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Q A Certificate Form 2A Skyuzuri 30 06 2021.PDF1 Oct 2021
Certificates of CA (Form 3)File: Form 3 BSU RERA 31 3 2021.PDF1 Oct 2021
Certificates of CA (Form 3)File: Form 3 BSU RERA 30 6 2021.PDF1 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ar FORM 1 SkyUzuri - 31-03-2021.pdf19 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CRETIFICATE SkyUzuri - 31-03-2021.PDF19 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Q A Certificate Form 2A Skyuzuri 31-03-2021.PDF19 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ar FORM 1 SkyUzuri - 31-12-2020.PDF8 Mar 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CRETIFICATE SkyUzuri - 31-12-2020.PDF8 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Q A Certificate Form 2A Skyuzuri 31-12-2020.PDF8 Mar 2021
Certificates of CA (Form 3)File: Scan10001.PDF8 Mar 2021
Certificates of CA (Form 3)File: Scan1.PDF8 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ar FORM 1 SkyUzuri jun2020.PDF19 Oct 2020

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
BRAMHA SKYCITY PHASE- ISERVEY NO 25 & 25A VILAGE- DHANORI TALUKA- HAVELI DIST- PUNE270CompletedSep 2016Sep 2016
BRAMHA SKYCITY PHASE- 1SURVEY NO 25 25A VILAGE- DHANORI TALUKA- HAVELI DIST- PUNE257CompletedSep 2016Late, Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BRAMHA SKYUZURI PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Opp. PCMC Building13,700+ in Pune

2 kmBRAMHA SKYUZURI PHASE 1Completed 4Lapsed / revoked 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 5 registered projects within 2 km.

Builder: BRAMHA LEISURES PVT LTD

BRAMHA LEISURES PVT LTD has 2 registrations on MahaRERA, including BRAMHA SKYUZURI PHASE 1 and Bramha Sky Uzuri Phase 2. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that BRAMHA SKYUZURI PHASE 1 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if BRAMHA SKYUZURI PHASE 1 is delayed beyond 31 Jul 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BRAMHA SKYUZURI PHASE 1?

The registered promoter entity is BRAMHA LEISURES PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BRAMHA SKYUZURI PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against BRAMHA SKYUZURI PHASE 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for BRAMHA SKYUZURI PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BRAMHA SKYUZURI PHASE 1?

The professionals named in the filing: Architect: PROJECTION STUDIO CONTECT PERSON SANGRAM SALUNKE; Architect: M S REZA KABUL ARCHITECTS PVT LTD; Engineer: structural engineer services CONTECT PERSON sanjay thigale. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BRAMHA SKYUZURI PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BRAMHA SKYUZURI PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BRAMHA SKYUZURI PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.