Home / Browse projects / BOMBAY XI

Registration lapsed Litigation declared Residential / Group Housing project

BOMBAY XI

By Tattva & Mittal Lifespaces Pvt Ltd

RG-MH-24636 · RERA P51900008408 · Last updated on MahaRERA portal: 1 Oct 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date
  • Litigation declared, 2 cases
  • 11 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
  • Allotment letter follows the model form

6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2023Possession promised34 months past this date
0 of 11Construction stages donefurthest along: Excavation, 0%
0 of 53Units unsoldnot recorded sold or booked
11Complaints at MahaRERAon this registration
Jump to the 164 documents Report an error

BOMBAY XI is a Residential / Group Housing project by Tattva & Mittal Lifespaces Pvt Ltd in Mahalaxmi, 400011, registered with MahaRERA as P51900008408 on 18 Aug 2017. Possession was promised by 30 Dec 2023 and is now 34 months past that date. The completion date has moved by 12 months from the original filing. 53 of the 53 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete. 11 complaints are on record with the regulator.

At a glance

Project

  • NameBOMBAY XI
  • TypeResidential / Group Housing
  • Location
    • K. K. Marg
    • Mahalaxmi
    • 400011
  • Pincode400011
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900008408
  • ReraGenie IDRG-MH-24636

Builder

  • NameTattva & Mittal Lifespaces Pvt Ltd
  • Entity typeCompany
  • DirectorsAnand Vilayannur, Uma Subbaraman

Key dates

34 months past promisethis monthRegisteredAug 2017First promiseDec 2022Revised toDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on18 Aug 2017
  • Promised completion30 Dec 2023
  • Revised completionRevised to 30 Dec 2023 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed164 files

Current status

100%53 of 53 units booked

Figures as on 1 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bombay 11NA412353053

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

Bombay 11: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed60

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots60
Closed/Covered60

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,902 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI22270.74
Proposed, not sanctioned19,979 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKamla Mills compound

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectConsultants Continued Architects
Chartered AccountantS T P & ASSOCIATES
Chartered AccountantN B Sayed & Associate
PartnerRole in project
Tattva & Mittal Lifespaces Pvt Ltd-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900012798Dec 2022 → Dec 2023

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.

Litigation declared2

CaseCourtStatus
CPIB3072/2019NCLT MUMBAIwithdrawal of CIRP proceedings
CPIB3072/2019NCLTClosed

Complaints filed with MahaRERA11

Case no.ComplainantRespondentFiled
CC006000000196931Ms. SHAMIM AFZAL FURNITUREWALATATTVA & MITTAL LIFESPACES PRIVATE LIMITED24/05/2021
CC006000000198556VOSTOK (FAREAST) SECURITIES PVT. LTD.TATTVA & MITTAL LIFESPACES PVT. LTD.05/10/2021
CC006000000198603ABHISHEK GOENKA THROUGH CONSTITUTED ATTORNEY ADITYA SARAFTATTVA & MITTAL LIFESPACES PVT. LTD.11/10/2021
CC006000000198604ANKITA SARAF through Constituted Attorney Aditya SarafTATTVA & MITTAL LIFESPACES PVT. LTD.11/10/2021
CC006000000198605ADITI SARAFF THROUGH CONSTITUTED ATTORNEY ADITYA SARAFTATTVA & MITTAL LIFESPACES PVT. LTD.11/10/2021
CC006000000199160Ms. Kshma Shah and Mr. Sagar Ashok RungtaTattva & Mittal Life spaces Private Limited & Ors26/11/2021
CC006000000375253SAMATA RAJ MALKANIM/s TATTVA & MITTAL LIFESPACES PVT. LTD.13/04/2023
CC12401062SAMATA ALIAS SONU RAJ MALKANITattva & Mittal Lifespaces Pvt Ltd07/12/2024
CC12501532AHMEDALI HUSAMUDDIN RINGWALABOMBAY XI08/05/2025
CC12502038Jayshree Hitesh MehtaTattva & Mittal Lifespaces Pvt Ltd22/06/2025
CC12503680SAMATA ALIAS SONU RAJ MALKANITattva & Mittal Lifespaces Pvt Ltd15/10/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed164

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 164 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2023-2024)File: Form 5 of Bombay XI as on 31-03-2024.pdf1 Oct 2025
Certificates of CA (Form 3)File: Form 3_Bombay XI as on 31st March 2024.pdf12 Nov 2024
Certificates of CA (Form 3)File: Form 3_Bombay XI as on 30th June 2024.pdf12 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Bombay XI as on 31st March 2024.pdf12 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Bombay XI as on 30th June 2024.pdf12 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 of Bombay XI as on 31-03-2024.pdf12 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 As on 30th June 2024.pdf9 Aug 2024
Building plan approvalFile: Tattva Mittal_Part1.pdf27 Jul 2024
Building plan approvalFile: Tattva Mittal_Part2.pdf27 Jul 2024
Building plan approvalFile: Tattva Mittal_Part3.pdf27 Jul 2024
Layout approvalFile: Layout bombay XI.pdf27 Jul 2024
Copy of Layout Approval (in case of layout)File: Layout bombay XI.pdf27 Jul 2024
Building Plan Approval (IOD)File: Tattva Mittal_Part1.pdf27 Jul 2024
Building Plan Approval (IOD)File: Tattva Mittal_Part2.pdf27 Jul 2024
Building Plan Approval (IOD)File: Tattva Mittal_Part3.pdf27 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 35 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf16 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 32 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf16 Jul 2024
Certificates of CA (Form 3)File: 34 Certificates of CA (Form 3).pdf16 Jul 2024
Layout approvalFile: Plan - Bombay XI-1.pdf19 Jun 2024
Building plan approvalFile: Plan - Bombay XI-2.pdf19 Jun 2024
Copy of Layout Approval (in case of layout)File: Plan - Bombay XI-1.pdf19 Jun 2024
Building Plan Approval (IOD)File: Plan - Bombay XI-2.pdf19 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: CC - Bombay XI.pdf19 Jun 2024
Layout approvalFile: Layout Drawing - Bombay XI Latest.pdf30 May 2024
Copy of Layout Approval (in case of layout)File: Layout Drawing - Bombay XI Latest.pdf30 May 2024
Declaration in FORM BFile: FORM B (Affidavit cum Declaration).pdf17 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (Anand Vilayannur).pdf17 Apr 2024
Declaration about Commencement CertificateFile: Format D.pdf12 Apr 2024
Disclosure of sold/ booked inventoryFile: Circular 29 (1).pdf12 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Uma Subbaraman .pdf12 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A TML.pdf12 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A .pdf12 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Mar 24.pdf8 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dec.pdf5 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec.pdf5 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A (2019-20).pdf5 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A (2020-21).pdf5 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A (2021-22).pdf5 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FOrm 2A (2022-23).pdf5 Apr 2024
Certificates of CA (Form 3)File: Form 3 Dec.pdf5 Apr 2024
Certificates of CA (Form 5)File: Form 5 (2017-2018).pdf5 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 (2020-2021).pdf5 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 (2021-2022).pdf5 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 (2022-23).pdf5 Apr 2024
Certificates of CA (Form 3)File: 10 FORM 03 AS ON 30th September 2023.pdf7 Mar 2024
Certificates of CA (Form 3)File: 11 FORM 03 AS ON 31st December 2023.pdf7 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Bombay XI as on 30th September 2023.pdf2 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Bombay XI as on 31st December 2023.pdf2 Mar 2024
Certificates of CA (Form 3)File: Form 3 - Bombay XI as on 30th September 2023.pdf2 Mar 2024
Certificates of CA (Form 3)File: Form 3 - Bombay XI as on 31st December 2023.pdf2 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Bombay XI as on Sept 2017.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Bombay XI as on Dec 2017.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Bombay XI as on June 2018.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Bombay XI as on Sept 2018.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Bombay XI as on Dec 2018.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Bombay XI as on June 2019.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Bombay XI as on Sept 2019.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Bombay XI as on Dec 2019.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Bombay XI as on Dec 2019.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Bombay XI as on Dec 2019.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Bombay XI as on June 2020.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Bombay XI as on Sept 2020.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Bombay XI as on Dec 2020.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Bombay XI as on June 2021.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Bombay XI as on Sept 2021.pdf29 Jan 2024
Certificates of CA (Form 3)File: Form 3_Bombay XI_30-09-2017.pdf25 Jan 2024
Certificates of CA (Form 3)File: Form 3_Bombay XI_31-12-2017.pdf25 Jan 2024
Certificates of CA (Form 3)File: New Format Form 3_Bombay XI_June 2018.pdf25 Jan 2024
Certificates of CA (Form 3)File: New Format Form 3_Bombay XI 30-09-2018.pdf25 Jan 2024
Certificates of CA (Form 3)File: New Format Form 3_Bombay XI_Dec 2018.pdf25 Jan 2024
Certificates of CA (Form 3)File: New Format Form 3_Bombay XI June 2019.pdf25 Jan 2024
Certificates of CA (Form 3)File: New Format Form 3_Bombay XI Sept 2019.pdf25 Jan 2024
Certificates of CA (Form 3)File: New Format Form 3_Bombay XI 31-12-2019.pdf25 Jan 2024
Certificates of CA (Form 3)File: New Format Form 3_Bombay XI 30-06-2020.pdf25 Jan 2024
Certificates of CA (Form 3)File: New Format Form 3_Bombay XI 30-09-2020.pdf25 Jan 2024
Certificates of CA (Form 3)File: New Format Form 3_Bombay XI 31-12-2020.pdf25 Jan 2024
Certificates of CA (Form 3)File: New Format Form 3_Bombay XI 30-06-2021.pdf25 Jan 2024
Certificates of CA (Form 3)File: New Format Form 3_Bombay XI 30-09-2021.pdf25 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: New Format Form 5 - Bombay XI.pdf11 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: September 2017.pdf10 Jan 2024

Keep BOMBAY XI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mahalaxmi

2 kmBOMBAY XICompleted 9Lapsed / revoked 15Other 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 44 registered projects within 2 km.

Builder: Tattva & Mittal Lifespaces Pvt Ltd

Tattva & Mittal Lifespaces Pvt Ltd has 1 registration on MahaRERA, including BOMBAY XI. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record.

Frequently asked questions

What does it mean that BOMBAY XI shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if BOMBAY XI is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BOMBAY XI?

The registered promoter entity is Tattva & Mittal Lifespaces Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BOMBAY XI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against BOMBAY XI?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for BOMBAY XI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BOMBAY XI?

The professionals named in the filing: Architect: Consultants Continued Architects; Chartered Accountant: S T P & ASSOCIATES; Chartered Accountant: N B Sayed & Associate. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BOMBAY XI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BOMBAY XI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BOMBAY XI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.