Home / Browse projects / BISMILLAH TOWER

Registered No litigation declared Residential / Group Housing project

BISMILLAH TOWER

By HAYAT AHMED ASIR AHMED ANSARI

RG-MH-29427 · RERA P51900028695 · Last updated on MahaRERA portal: 19 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2026Possession promisedmoved 18 months from the original
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
75 of 93Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 179 documents Report an error

BISMILLAH TOWER is a Residential / Group Housing project by HAYAT AHMED ASIR AHMED ANSARI in AGRIPADA, 400011, registered with MahaRERA as P51900028695 on 25 Mar 2021. Possession is promised by 31 Dec 2026. The completion date has moved by 18 months from the original filing. 18 of the 93 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameBISMILLAH TOWER
  • TypeResidential / Group Housing
  • Location
    • MEGHRAJ SETHI MARG
    • AGRIPADA
    • 400011
  • Pincode400011
  • RERA no.P51900028695
  • ReraGenie IDRG-MH-29427

Builder

  • NameHAYAT AHMED ASIR AHMED ANSARI
  • Entity typeIndividual

Key dates

this monthRegisteredMar 2021First promiseJun 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Mar 2021
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2025)
  • Buildings1 building record
  • Documents filed179 files

Current status

19%18 of 93 units booked
95.2%Work done, per cost certificate

Figures as on 19 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BISMILLAH TOWERNA292989493

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

BISMILLAH TOWER: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 19 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes99%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed21

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots21
Closed/Covered21

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area423 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Jun 2025
LandownerVillageDistrict
GHADIYAL CHAWL CHS-Mumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI3169.46
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch202 Battiwala Building, Dr Mascrenhas Road Mumbai 400 010
Estimated costRs 13.00 cr
Cost incurredRs 12.38 cr
Work done95.24%
BuildingWingEstimatedIncurred
BISMILLAH TOWERNARs 13.00 crRs 12.38 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMHATRE & ASSOCIATES
EngineerM Naushad Qureshi Monu Enterprises
Chartered AccountantKapure & Kapure Chartered Accountants
Chartered AccountantShripati Gandhi Choudhari & Co Chartered Accountants
PartnerRole in project
HAYAT AHMED ASIR AHMED ANSARI-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA19062501677Jun 2025 → Dec 2026

Reason as filed by the promoterAs per the attachment

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Mar 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Feb 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Feb 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed179

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 179 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Architect Certificate Mar 2026.pdf19 Jul 2026
Withdrawal Update Form 2File: Q4 FORM 2 ENGINEEAR CERTIF 2025-26.pdf19 Jul 2026
Withdrawal Update Form 3File: Form 3 June 26_compressed.pdf19 Jul 2026
Withdrawal Update Form 1File: Form 1 - Architect Certificate Mar 2026.pdf29 Apr 2026
Withdrawal Update Form 2File: Q4 FORM 2 ENGINEEAR CERTIF 2025-26.pdf29 Apr 2026
Withdrawal Update Form 3File: Final Form 3 Bismillah Tower March 26_compressed.pdf29 Apr 2026
Withdrawal Update Form 1File: Form 1 - Architect Certificate Dec 2025_page-0001.pdf3 Feb 2026
Withdrawal Update Form 2File: ENG CERTIFICATE FORM 2 Q3 25-26.pdf3 Feb 2026
Withdrawal Update Form 3File: Form 3 Bismillah Tower Dec 25.pdf3 Feb 2026
Withdrawal Update Form 1File: Form 1 3112204.pdf5 Nov 2025
Withdrawal Update Form 2File: BBD FORM 2 ENGINEER CERTIFICATE Q2 2025-26.pdf5 Nov 2025
Withdrawal Update Form 3File: Form 3 Bismillah Tower Sep 25_compressed.pdf5 Nov 2025
Withdrawal Update Form 1File: Form 1 3112204.pdf23 Aug 2025
Withdrawal Update Form 2File: FORM 2 30-06-25_page-0001.pdf23 Aug 2025
Withdrawal Update Form 3File: FORM NO 3 BBD Q1 25-26.pdf23 Aug 2025
Withdrawal Update Form 1File: Form 1 3112204.pdf14 Aug 2025
Withdrawal Update Form 2File: FORM 2 30-06-25_page-0001.pdf14 Aug 2025
Withdrawal Update Form 3File: FORM NO 3 BBD Q1 25-26.pdf14 Aug 2025
Form 2A (FY 2020-2021)File: Baacha Builders Form 2A_Mar 21.pdf23 Jul 2025
Form 2A (FY 2021-2022)File: Form No 2A Ghadiyal Chawl Site Superviser Certi .pdf23 Jul 2025
Form 2A (FY 2022-2023)File: Form 2A March 23.pdf23 Jul 2025
Form 2A (FY 2023-2024)File: Form 2A March 24.pdf23 Jul 2025
Form 1File: FORM NO 1 SEP22.pdf19 Jul 2025
Form 2File: Form 2 - Bismillah Tower Sep 22_page-0001.pdf19 Jul 2025
Form 3File: Form 3 - Sep 22.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Diclosure of Sold_Booked Inventory Sept 22.pdf19 Jul 2025
Form 1File: FORM NO 1 DEC22.pdf19 Jul 2025
Form 2File: Form 2 - Bismillah Tower Dec 22_page-0001_page-0001.pdf19 Jul 2025
Form 3File: Form 3 Dec 22.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Diclosure of Sold_Booked Inventory dec 22.pdf19 Jul 2025
Form 1File: Architect DT 30-06-2023.pdf19 Jul 2025
Form 2File: Form 2 - Bismillah Tower June 23.pdf19 Jul 2025
Form 3File: Form 3 June 23.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Diclosure of Sold_Booked Inventory June 23_page-0001.pdf19 Jul 2025
Form 1File: Architect DT 30-09-2023.pdf19 Jul 2025
Form 2File: Form 2 - Bismillah Tower Sep23.pdf19 Jul 2025
Form 3File: Final Form 3 Baccha Builders and Developers Sep 2023.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Diclosure of Sold_Booked Inventory Se.pdf19 Jul 2025
Form 1File: Architect DT 31-12-2023.pdf19 Jul 2025
Form 2File: Form 2 Dec 23.pdf19 Jul 2025
Form 3File: Form 3 Baccha Builders and DevelopersDec 23.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of inventories Dec 23.pdf19 Jul 2025
Form 1File: Form 1 - Architect Certificate Mar 2024_page-0001.pdf19 Jul 2025
Form 2File: Form 2 - Bismillah Tower March 24.pdf19 Jul 2025
Form 3File: Final Form 3 Bismillah Tower mar-24_compressed.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Diclosure of Sold_Booked Inventory March 24.pdf19 Jul 2025
Form 5 (FY 2020-2021)File: Baacha Form 5 March 2021.pdf19 Jul 2025
Form 5 (FY 2021-2022)File: Baacha Form 5 March 2022.pdf19 Jul 2025
Form 5 (FY 2022-2023)File: Bismillah Tower- Form 5 Mar 23.pdf19 Jul 2025
Form 3File: Form 3 June 21.pdf18 Jul 2025
Form 1File: Architects dt 30062021 001.pdf18 Jul 2025
Form 2File: Baacha Form No 2 Jun 21.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Diclosure of Sold_Booked Inventory JUN 21.pdf18 Jul 2025
Form 1File: Architects 30-09-2021 001.pdf18 Jul 2025
Form 2File: Baacha Form No 2 Sep 21.pdf18 Jul 2025
Form 3File: Form 3 Sep 21.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Diclosure of Sold_Booked Inventory SEP 21.pdf18 Jul 2025
Form 1File: Architects 31-12-2021 001.pdf18 Jul 2025
Form 2File: Baacha Form No 2 Dec 21.pdf18 Jul 2025
Form 3File: Form 3 Dec 21.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Diclosure of Sold_Booked Inventory DEC 21.pdf18 Jul 2025
Form 1File: Architects Dt 31-03-2022 001_11zon.pdf18 Jul 2025
Form 2File: Baacha Form No 2 Mar 22_11zon.pdf18 Jul 2025
Form 3File: Form 3 March 2022.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: BBD Disclosure of inventries Mar 22.pdf18 Jul 2025
Form 3File: Form 3 June 22.pdf18 Jul 2025
Form 1File: Architects 30-06-2022 001_11zon.pdf18 Jul 2025
Form 2File: Form 2 Engineer Cert Jun 22.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Diclosure of Sold_Booked Inventory JUN 22.pdf18 Jul 2025
Form 1File: Architect DT 31-03-2023.pdf18 Jul 2025
Form 2File: ENGINEER SING REPORT MARCH 2023.pdf18 Jul 2025
Form 3File: Form 3 March 23.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Diclosure of Sold_Booked Inventory MARCH 23.pdf18 Jul 2025
Form 1File: Baacha Form 1 Mar 21.pdf8 Jul 2025
Form 2File: Baacha Form No 2 Mar 21.pdf8 Jul 2025
Form 3File: Form 3 March 2021.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of inventories Mar 2021.pdf8 Jul 2025
Form 1File: Form 1 - Architect Certificate June 2024_compressed.pdf8 Jul 2025
Form 2File: Form 2 June 24.pdf8 Jul 2025
Form 3File: Final Form 3 Bismillah Tower June 24_compressed.pdf8 Jul 2025

Keep BISMILLAH TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AGRIPADA

Builder: HAYAT AHMED ASIR AHMED ANSARI

HAYAT AHMED ASIR AHMED ANSARI has 1 registration on MahaRERA, including BISMILLAH TOWER. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if BISMILLAH TOWER is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BISMILLAH TOWER?

The registered promoter entity is HAYAT AHMED ASIR AHMED ANSARI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BISMILLAH TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BISMILLAH TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BISMILLAH TOWER?

The professionals named in the filing: Architect: MHATRE & ASSOCIATES; Engineer: M Naushad Qureshi Monu Enterprises; Chartered Accountant: Kapure & Kapure Chartered Accountants; Chartered Accountant: Shripati Gandhi Choudhari & Co Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BISMILLAH TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BISMILLAH TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BISMILLAH TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.