Home / Browse projects / Pune, Maharashtra / BHUMI SILVERIIO PHASE 1

Completed No litigation declared Residential / Group Housing project

BHUMI SILVERIIO PHASE 1

By Bhumi Shelters (India) Pvt Ltd

RG-MH-23843 · RERA P52100005434 · Last updated on MahaRERA portal: 24 Nov 2020

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2019Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
1Complaints at MahaRERAon this registration
Jump to the 22 documents Report an error

BHUMI SILVERIIO PHASE 1 is a Residential / Group Housing project by Bhumi Shelters (India) Pvt Ltd in Pune, Maharashtra, registered with MahaRERA as P52100005434 on 11 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2019. The completion date has moved by 12 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameBHUMI SILVERIIO PHASE 1
  • TypeResidential / Group Housing
  • Location
    • 0
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411062
  • Pincode411062
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100005434
  • ReraGenie IDRG-MH-23843

Builder

  • NameBhumi Shelters (India) Pvt Ltd
  • Entity typeCompany
  • CINU45202PN2007PTC131183
  • GSTIN27AADCB3062B1Z8
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorDinesh Venkatrao Gunthe
  • DirectorsRekha Damodar More, Suresh Uttam Kasbe
  • Other registrations3 more →
  • Completed2 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredAug 2017First promiseDec 2018Revised toDec 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Aug 2017
  • Promised completion31 Dec 2019
  • Revised completionRevised to 31 Dec 2019 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed22 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BHUMI SILVERIIO PHASE 1NA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Nov 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

BHUMI SILVERIIO PHASE 1: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Nov 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes10%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Open Space40

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPIMPARI CHINCHWAD MUNCIPAL CORPORATION
Permissible FSI34561.51
Proposed, not sanctioned6,562 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchG BLOCK, SAMBHAJI NAGAR, CHINCHWAD 411019

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAvinash Nawathe Architects
EngineerUPENDRA PURANDARE
Chartered AccountantNIKHIL
Chartered Accountantsummet kate
PartnerRole in project
Bhumi Shelters (INDIA) PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100001177Dec 2018 → Dec 2019

Reason as filed by the promoterDelay in granting Environment Clearance from competent authorities.

Litigation declared1

CaseCourtStatus
CNR NO MHPU04-011308-2015/2015Chief Judicial Magistrate PuneHEARING BEFORE CHARGE

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000471244Rajeshwar Anantrao ShendeBhumi Shelters India Pvt Ltd17/07/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Aug 2019

Documents filed22

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
OtherFile: Enviornment Clearnce letter-2020_.pdf24 Nov 2020
Details of encumbrancesFile: EC1_compressed (1)_compressed.pdf24 Sep 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: society formation_compressed.pdf24 Sep 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: appl acknow_.pdf8 Feb 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Rera Form 5.pdf2 Dec 2019
Architect’s Certificate on Completion of Project (Form 4)File: arch certificate.pdf12 Nov 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion certificate.pdf10 Aug 2019
OtherFile: Completion certificate.pdf7 Aug 2019
Certificates of CA (Form 5)File: Form 5 Silveriio.pdf15 Oct 2018
Details of encumbrancesFile: ENCUBRANCE CERT.pdf10 Aug 2017
Building plan approvalFile: Building Flor Plans Phase 1 C building.pdf31 Jul 2017
Layout approvalFile: SILVERIIO LAYOUT PLAN PROPOSED.pdf31 Jul 2017
PAN CardFile: BHUMI PAN.pdf31 Jul 2017
Copy of the legal title reportFile: Title search report.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: SILVERIIO LAYOUT PLAN PROPOSED.pdf31 Jul 2017
Building Plan Approval (IOD)File: Building Flor Plans Phase 1 C building.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: commencement.pdf31 Jul 2017
Declaration in FORM BFile: FORM B SILVERIIO.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate form.pdf31 Jul 2017
Certificates of CA (Form 3)File: Form 3 CA Certificate_Silveriio1.pdf31 Jul 2017
Proforma of Allotment letterFile: Silveriio_Agreement Draft.pdf31 Jul 2017

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
BHUMI SILVERIIO PHASE 3P52100051295DEHU ALANDI ROAD, Pune104Jun 2023OngoingDec 2026Not due yet
BHUMI SILVERIIO PHASE 2P52100025555CHIKHALI, Pune-Jun 2020CompletedDec 2023Registered original: Jun 2023Dec 2023
BHUMI SILVERIIO PHASE IGAT NO 114P 124 125 126 127P at Pimpri Chinchwad M Corp Tq Haveli Pune 411062113-CompletedSep 2017Late, Jul 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BHUMI SILVERIIO PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pimpri Chinchawad (M Corp.)13,700+ in Pune

2 kmBHUMI SILVERIIO PHASE 1Completed 75Lapsed / revoked 41Other 76Dot size: filed unitsN

Filed coordinates, straight-line distance. 192 registered projects within 2 km.

Builder: Bhumi Shelters (India) Pvt Ltd

Bhumi Shelters (India) Pvt Ltd has 4 registrations on MahaRERA, including BHUMI SILVERIIO PHASE 1 and Bhumi Pride. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if BHUMI SILVERIIO PHASE 1 is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BHUMI SILVERIIO PHASE 1?

The registered promoter entity is Bhumi Shelters (India) Pvt Ltd, a company as per the filing. Its CIN U45202PN2007PTC131183 and GSTIN 27AADCB3062B1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BHUMI SILVERIIO PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against BHUMI SILVERIIO PHASE 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for BHUMI SILVERIIO PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BHUMI SILVERIIO PHASE 1?

The professionals named in the filing: Architect: Avinash Nawathe Architects; Engineer: UPENDRA PURANDARE; Chartered Accountant: NIKHIL; Chartered Accountant: summet kate. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BHUMI SILVERIIO PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BHUMI SILVERIIO PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BHUMI SILVERIIO PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.