Home / Browse projects / Pune, Maharashtra / GANESH SIDDHI PHASE 3

Registered No litigation declared Others project

GANESH SIDDHI PHASE 3

By S B PATIL SPACES AND INFRA PVT LTD

RG-MH-39554 · RERA P52100045411 · Last updated on MahaRERA portal: 20 Aug 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
12 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 20%
235 of 235Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

GANESH SIDDHI PHASE 3 is a Others project by S B PATIL SPACES AND INFRA PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100045411 on 18 May 2022. Possession is promised by 30 Jun 2027. 0 of the 235 units on this registration are recorded sold or booked, and 12 of 33 construction stages are filed complete.

At a glance

Project

  • NameGANESH SIDDHI PHASE 3
  • TypeOthers
  • Location
    • NEWALEVASTI
    • CHIKHALI
    • Haveli
    • Pune
    • 411062
  • Pincode411062
  • RERA no.P52100045411
  • ReraGenie IDRG-MH-39554

Builder

  • NameS B PATIL SPACES AND INFRA PVT LTD
  • Entity typeCompany
  • DirectorsAKASH SATISH PATIL, SATISH BASWANT PATIL, GANESH SATISH PATIL

Key dates

this monthRegisteredMay 2022PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 May 2022
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed89 files

Current status

0%0 of 235 units booked

Figures as on 20 Aug 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GANESH SIDDHI I WINGNA12035237
GANESH SIDDHI J WINGNA121099099
GANESH SIDDHI K WINGNA131099099

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 20 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 20%.

GANESH SIDDHI I WING38%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GANESH SIDDHI J WING38%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GANESH SIDDHI K WING38%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed133

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots133
Closed/Covered3
Open Space130
BuildingClosed/CoveredOpen SpaceTotal
GANESH SIDDHI I WING12021
GANESH SIDDHI J WING15556
GANESH SIDDHI K WING15556

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,900 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI16595.37
Proposed, not sanctioned16,595 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPost Box No 1 Kasarwadi Post Mumbai Pune Road Pune 411034

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAmruta Nikhil
ArchitectDESIGN ASSOCIATES
EngineerRajesh C Ratkalkar
EngineerAVINASH ANDENAPPA GADAVE
Chartered AccountantGANESH GAPAT & ASSOCIATES
Chartered AccountantR S NILANGE & CO
Chartered AccountantA NEGI & COMPANY
PartnerRole in project
S B PATIL SPACES AND INFRA PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1-JUNE 2022.pdf20 Aug 2025
Form 2File: FORM 2 JUN 22.pdf20 Aug 2025
Form 3File: FORM 3 JUN 2022.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY JUN 22.pdf20 Aug 2025
Form 1File: FORM 1-SEPTEMBER 2022.pdf20 Aug 2025
Form 2File: FORM 2 SEP 22.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY SEP 22.pdf20 Aug 2025
Form 3File: FORM 3 SEP 2022.pdf20 Aug 2025
Form 1File: FORM 1-DECEMBER 2022.pdf20 Aug 2025
Form 2File: FORM 2 DEC 22.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY DEC 22.pdf20 Aug 2025
Form 3File: FORM 3 DEC 2022.pdf20 Aug 2025
Form 1File: FORM 1-MARCH 2023.pdf20 Aug 2025
Form 2File: FORM 2 MAR 23.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY MAR 23.pdf20 Aug 2025
Form 3File: FORM 3 MAR 2023.pdf20 Aug 2025
OthersFile: FORM 5 MAR 23.pdf20 Aug 2025
Form 1File: FORM 1-JUNE 2023.pdf20 Aug 2025
Form 2File: FORM 2 JUN 23.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY JUN 23.pdf20 Aug 2025
Form 3File: FORM 3 JUN 2023.pdf20 Aug 2025
Form 1File: FORM 1-SEPTEMBER 2023.pdf20 Aug 2025
Form 2File: FORM 2 SEP 23.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY SEP 23.pdf20 Aug 2025
Form 3File: FORM 3 SEP 2023.pdf20 Aug 2025
Form 1File: FORM 1-DECEMBER 2023.pdf20 Aug 2025
Form 2File: FORM 2 DEC 23.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY DEC 23.pdf20 Aug 2025
Form 3File: FORM 3 DEC 2023.pdf20 Aug 2025
Form 1File: FORM 1-MARCH 2024.pdf20 Aug 2025
Form 2File: FORM 2 MAR 24.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY MAR 24.pdf20 Aug 2025
Form 3File: FORM 3 MAR 2024.pdf20 Aug 2025
OthersFile: FORM 5 MAR 24.pdf20 Aug 2025
Form 1File: FORM 1-JUNE 2024.pdf20 Aug 2025
Form 2File: FORM 2 JUN 24.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY JUN 24.pdf20 Aug 2025
Form 3File: FORM 3 JUN 2024.pdf20 Aug 2025
Form 1File: FORM 1-SEPTEMBER 2024.pdf20 Aug 2025
Form 2File: FORM 2 SEP 24.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY SEP 24.pdf20 Aug 2025
Form 3File: FORM 3 SEP 2024.pdf20 Aug 2025
Form 1File: DISCLOSURE OF INVENTORY DEC 24.pdf20 Aug 2025
Form 2File: FORM 2 DEC 24.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY DEC 24.pdf20 Aug 2025
Form 3File: FORM 3 DEC 2024.pdf20 Aug 2025
Form 1File: FORM 1-MARCH 2025.pdf20 Aug 2025
Form 2File: FORM 2 MAR 25.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY MAR 25.pdf20 Aug 2025
Form 3File: FORM 3 MAR 2025.pdf20 Aug 2025
OthersFile: FORM 5 MAR 25.pdf20 Aug 2025
Form 1File: FORM 1-JUNE 2025.pdf20 Aug 2025
Form 2File: FORM 2 JUN 25.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY JUN 25.pdf20 Aug 2025
Form 3File: FORM 3 JUN 2025.pdf20 Aug 2025
Form 2A (FY 2022-2023)File: FORM 2A MAR 23.pdf20 Aug 2025
Form 2A (FY 2023-2024)File: FORM 2A MAR 24.pdf20 Aug 2025
Form 2A (FY 2024-2025)File: FORM 2A MAR 25.pdf20 Aug 2025
Form 5 (FY 2022-2023)File: FORM 5 MAR 23.pdf20 Aug 2025
Form 5 (FY 2023-2024)File: FORM 5 MAR 24.pdf20 Aug 2025
Form 5 (FY 2024-2025)File: FORM 5 MAR 25.pdf20 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SB Patil Spaces Infra.pdf16 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Ganesh Siddhi Phase 3_compressed.pdf13 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1.PDF6 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.PDF6 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.PDF6 Sep 2023
Details of encumbrancesFile: Index.pdf1 Sep 2023
Proforma of Allotment letterFile: Draft Agreement GS Phase III.pdf11 May 2022
Building plan approvalFile: I BUILDING 1st-9th FLOOR.PDF10 May 2022
Building plan approvalFile: J BUILDING 1st-10th FLOOR PLAN.PDF10 May 2022
Building plan approvalFile: J BUILDING 7th FLOOR.PDF10 May 2022
Building plan approvalFile: K BUILDING 1st- 10th FLOOR.PDF10 May 2022
Building plan approvalFile: K BUILDING 7th FLOOR.PDF10 May 2022
PAN CardFile: SBP SPACES AND INFRA.PDF10 May 2022
Building Plan Approval / NA Order for plotted developmentFile: I BUILDING 1st-9th FLOOR.PDF10 May 2022
Building Plan Approval / NA Order for plotted developmentFile: J BUILDING 1st-10th FLOOR PLAN.PDF10 May 2022
Building Plan Approval / NA Order for plotted developmentFile: J BUILDING 7th FLOOR.PDF10 May 2022
Building Plan Approval / NA Order for plotted developmentFile: K BUILDING 1st- 10th FLOOR.PDF10 May 2022
Building Plan Approval / NA Order for plotted developmentFile: K BUILDING 7th FLOOR.PDF10 May 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf10 May 2022

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GANESH SIDDHI PHASE 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHIKHALI13,700+ in Pune

Builder: S B PATIL SPACES AND INFRA PVT LTD

S B PATIL SPACES AND INFRA PVT LTD has 1 registration on MahaRERA, including GANESH SIDDHI PHASE 3. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GANESH SIDDHI PHASE 3 is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GANESH SIDDHI PHASE 3?

The registered promoter entity is S B PATIL SPACES AND INFRA PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GANESH SIDDHI PHASE 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GANESH SIDDHI PHASE 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GANESH SIDDHI PHASE 3?

The professionals named in the filing: Architect: Amruta Nikhil; Architect: DESIGN ASSOCIATES; Engineer: Rajesh C Ratkalkar; Engineer: AVINASH ANDENAPPA GADAVE; Chartered Accountant: GANESH GAPAT & ASSOCIATES; Chartered Accountant: R S NILANGE & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GANESH SIDDHI PHASE 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GANESH SIDDHI PHASE 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GANESH SIDDHI PHASE 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.