DWARKA BLUE WATER
RG-MH-05642 · RERA P52100076746 · Last updated on MahaRERA portal: 14 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 26 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DWARKA BLUE WATER is a Residential / Group Housing project by SHAKUNTAL BUILDCON in Pune, Maharashtra, registered with MahaRERA as P52100076746 on 25 Jun 2024. Possession is promised by 31 May 2031. The completion date has moved by 26 months from the original filing. 27 of the 296 units on this registration are recorded sold or booked, and 4 of 22 construction stages are filed complete.
At a glance
Project
- NameDWARKA BLUE WATER
- TypeResidential / Group Housing
- Location
- KOLOUS GREEN CITY ROAD
- CHIKHALI
- Haveli
- Pune
- 411062
- Pincode411062
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100076746
- ReraGenie IDRG-MH-05642
Builder
- NameSHAKUNTAL BUILDCON
- Entity typePartnership
- PartnersNANDKUMAR SHANTARAM JADHAV, AJAY SHAMLAL VIJAY, TUSHAR RAJKUMAR JADHAV, DIPAK KUMAR RAJUBHAI POKAR
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on25 Jun 2024
- Promised completion31 May 2031
- Revised completionRevised to 31 May 2031 (originally 31 Mar 2029)
- Buildings2 building records
- Documents filed91 files
Current status
Figures as on 14 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 17 | 15 | 222 | 21 | 243 |
| WING B | NA | 10 | 7 | 53 | 0 | 53 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 14 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 50%.
WING A29%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 50% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING B29%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 50% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 14 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed558
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| WING A | 461 | 461 |
| WING B | 97 | 97 |
Land and ownership21
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| MR SUDAM MAHADU JADHAV | Chikhali | Pune |
| RAGHUNATH DNYANOBA JADHAV | Chikhali | Pune |
| SHANKAR RAGHU BHUJBAL | Chakan (CT) | Pune |
| TARABAI DATTATRAY BHUJBAL | Chakan (CT) | Pune |
| DINESH D BHUJBAL | Chakan (CT) | Pune |
| TUSHAR DATTATTRAY BHUJBAL | Chakan (CT) | Pune |
| ROHINI KISHOR BHUJBAL | Pune (M Corp.) | Pune |
| HANUMANT NIVRUTTI JADHAV | Chikhali | Pune |
| SHANTARAM RANGNATH JADHAV | Chikhali | Pune |
| RAJKUMAR JADHAV | Chikhali | Pune |
| NANDKUMAR SHANTARAM JADHAV | Chikhali | Pune |
| MADHUKAR RANGNATH JADHAV | Chikhali | Pune |
| DHANVIR JADHAV | Chikhali | Pune |
| DAULAT MADHUKAR JADHAV | Chikhali | Pune |
| BEBI RAMCHANDRA JADHAV | Chikhali | Pune |
| VISHNU MADHU JADHAV | Chikhali | Pune |
| VITHU GOVIND JADHAV | Chikhali | Pune |
| BHAGUBAI JAYSING BURDE | Chikhali | Pune |
| NABABABAI KHEVRAM ALHAT | Moshi | Pune |
| MANISHA DATTATRYA BHUJBAL | Chakan (CT) | Pune |
| VIKAS PANDIT JADHAV | Chikhali | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING A | NA | Rs 65.53 cr | Rs 11.14 cr |
| WING B | NA | Rs 43.69 cr | - |
| - | NA | Rs 4.52 cr | Rs 45.22 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MANIK BUCHUDE |
| Engineer | NILESH DIGHE AND ASSOCIATES |
| Engineer | Prashant Desai |
| Chartered Accountant | UJJAM PATEL & ASSOCIATES |
| Chartered Accountant | CA DIPALI KADAM |
| Partner | Role in project |
|---|---|
| SHAKUNTAL BUILDCON | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe, Shakuntal Buildcon (Promoter of DWARKA BLUE WATER, Reg. No. P52100076746), request extension of project completion date from 31/03/2029 to 31/05/2031, as delay occurred due to non-receipt of mandatory Environmental Clearance beyond our control.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Jun 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Jan 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Dec 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 May 2031
Documents filed91
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2025-2026)File: Form 5 25 -26 Shakuntal Buildcon Blue Water.pdf | 14 Aug 2026 |
| Withdrawal Update Form 1File: Form - 1.pdf | 15 Jul 2026 |
| Withdrawal Update Form 2File: Form - 2.pdf | 15 Jul 2026 |
| Withdrawal Update Form 3File: Form - 3.pdf | 15 Jul 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 17 Apr 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 17 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 (1).pdf | 17 Apr 2026 |
| Layout approvalFile: LAYOUT (2)_page-0001 (1).pdf | 18 Jan 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 18 Jan 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 18 Jan 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 18 Jan 2026 |
| Layout approvalFile: layout 17012025.pdf | 18 Dec 2025 |
| Building plan approvalFile: Plan 2 17012025.pdf | 18 Dec 2025 |
| Building plan approvalFile: Plan 3 17012025.pdf | 18 Dec 2025 |
| Building plan approvalFile: Plan 4 17012025.pdf | 18 Dec 2025 |
| Building plan approvalFile: Plan 5 17012025.pdf | 18 Dec 2025 |
| Building plan approvalFile: Plan 6 17012025.pdf | 18 Dec 2025 |
| Building plan approvalFile: Plan 7 17012025.pdf | 18 Dec 2025 |
| Building plan approvalFile: Plan 8 17012025.pdf | 18 Dec 2025 |
| Building plan approvalFile: Plan 9 17012025.pdf | 18 Dec 2025 |
| Building plan approvalFile: Plan 10 17012025.pdf | 18 Dec 2025 |
| Building plan approvalFile: Plan 11_11zon.pdf | 18 Dec 2025 |
| Layout approvalFile: layout 17012025.pdf | 17 Dec 2025 |
| Building plan approvalFile: Plan 2 17012025.pdf | 17 Dec 2025 |
| Building plan approvalFile: Plan 3 17012025.pdf | 17 Dec 2025 |
| Building plan approvalFile: Plan 4 17012025.pdf | 17 Dec 2025 |
| Building plan approvalFile: Plan 5 17012025.pdf | 17 Dec 2025 |
| Building plan approvalFile: Plan 6 17012025.pdf | 17 Dec 2025 |
| Building plan approvalFile: Plan 7 17012025.pdf | 17 Dec 2025 |
| Building plan approvalFile: Plan 8 17012025.pdf | 17 Dec 2025 |
| Building plan approvalFile: Plan 9 17012025.pdf | 17 Dec 2025 |
| Building plan approvalFile: Plan 10 17012025.pdf | 17 Dec 2025 |
| Building plan approvalFile: Plan 11 17012025.pdf | 17 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 Shakuntal Buildcon 30-09-2025.pdf | 29 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 Shakuntal Buildcon 30-09-2025.pdf | 29 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Shakuntal Buildcon 30-09-2025.pdf | 29 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5 Shakuntal Buildcon Blue Water.pdf | 29 Sep 2025 |
| Form 1File: Form 1 Shakuntal Buildcon 30-06-2025.pdf | 5 Aug 2025 |
| Form 2File: Form 2 Shakuntal Buildcon 30-06-2025.pdf | 5 Aug 2025 |
| Form 3File: Form 3 Shakuntal Buildcon 30-06-2025.pdf | 5 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Shakuntal Buildcon Disclosure of Sold-Booked Inventory 30-06-2025.pdf | 5 Aug 2025 |
| Form 1File: Shakuntal Buildcon Form -1.pdf | 19 May 2025 |
| Form 2File: Shakuntal Buildcon Form -2.pdf | 19 May 2025 |
| Form 3File: Shakuntal Buildcon Form -3.pdf | 19 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Shakuntal Buildcon -31-12-2024.pdf | 19 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Shakuntal Buildcon.pdf | 19 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Shakuntal Buildcon 31-12-2024.pdf | 19 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form-1.pdf | 22 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-31.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2.pdf | 19 Oct 2024 |
| Copy of the legal title reportFile: shakuntal title.pdf | 6 Jun 2024 |
| Other - LegalFile: चिखली Satbara.pdf | 6 Jun 2024 |
| Proforma of Agreement for saleFile: AFS 27-04-2024.pdf | 7 May 2024 |
| Details of encumbrances concerned to FinanceFile: GetUserDocumentFileContent_page-0001.pdf | 9 Apr 2024 |
| Details of encumbrances concerned to FinanceFile: 2 a Details of encumbrances concerned to Finance_page-0001.pdf | 9 Apr 2024 |
| Details of encumbrances concerned to LegalFile: GetUserDocumentFileContent_page-0001.pdf | 9 Apr 2024 |
| Details of encumbrances concerned to LegalFile: 2 a Details of encumbrances concerned to Finance_page-0001.pdf | 9 Apr 2024 |
| CERSAI detailsFile: 1 CERSAI details_page-0001.pdf | 9 Apr 2024 |
| Other - TechnicalFile: Order No-50_page-0001.pdf | 9 Apr 2024 |
| Layout approvalFile: 1-10.pdf | 8 Apr 2024 |
| Building plan approvalFile: 2-10.pdf | 8 Apr 2024 |
| Building plan approvalFile: 3-10.pdf | 8 Apr 2024 |
| Building plan approvalFile: 3-10.pdf | 8 Apr 2024 |
| Building plan approvalFile: 4-10.pdf | 8 Apr 2024 |
| Building plan approvalFile: 5-10.pdf | 8 Apr 2024 |
| Building plan approvalFile: 6-10.pdf | 8 Apr 2024 |
| Building plan approvalFile: 7-10.pdf | 8 Apr 2024 |
| Building plan approvalFile: 8-10.pdf | 8 Apr 2024 |
| Building plan approvalFile: 9-10.pdf | 8 Apr 2024 |
| PAN CardFile: Pan Card - Shakuntal Buildcon.pdf | 8 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: 1-10.pdf | 8 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 2-10.pdf | 8 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 3-10.pdf | 8 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 3-10.pdf | 8 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 4-10.pdf | 8 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 5-10.pdf | 8 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 6-10.pdf | 8 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 7-10.pdf | 8 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 8-10.pdf | 8 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 9-10.pdf | 8 Apr 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 91 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep DWARKA BLUE WATER on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHIKHALI13,700+ in Pune
Filed coordinates, straight-line distance. 155 registered projects within 2 km.
SHAKUNTAL COMMERCIA
SHAKUNTAL GROUP
Santiago Skyarc
Anjani Promoters
24 SUNSHINE TOWERS
SHIV ASSOCIATES
Ganesh Paradise Phase I
EKDANTA NEST LLP
GANESH SIDDHI PHASE 3
S B PATIL SPACES AND INFRA PVT LTD
Krystal One Phase IV
RAMA SPACES
Builder: SHAKUNTAL BUILDCON
SHAKUNTAL BUILDCON has 1 registration on MahaRERA, including DWARKA BLUE WATER. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if DWARKA BLUE WATER is delayed beyond 31 May 2031?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DWARKA BLUE WATER?
The registered promoter entity is SHAKUNTAL BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DWARKA BLUE WATER?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DWARKA BLUE WATER?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DWARKA BLUE WATER?
The professionals named in the filing: Architect: MANIK BUCHUDE; Engineer: NILESH DIGHE AND ASSOCIATES; Engineer: Prashant Desai; Chartered Accountant: UJJAM PATEL & ASSOCIATES; Chartered Accountant: CA DIPALI KADAM. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DWARKA BLUE WATER?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback