Home / Browse projects / Pune, Maharashtra / SHAKUNTAL COMMERCIA

Registered No litigation declared Commercial project

SHAKUNTAL COMMERCIA

By SHAKUNTAL GROUP

RG-MH-63903 · RERA P52100048730 · Last updated on MahaRERA portal: 13 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 15 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 15 months from the original
5 of 11Construction stages donefurthest along: Internal walls, 95%
153 of 328Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

SHAKUNTAL COMMERCIA is a Commercial project by SHAKUNTAL GROUP in Pune, Maharashtra, registered with MahaRERA as P52100048730 on 17 Jan 2023. Possession is promised by 30 Jun 2027. The completion date has moved by 15 months from the original filing. 175 of the 328 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHAKUNTAL COMMERCIA
  • TypeCommercial
  • Location
    • Dehu Alandi Road
    • Chikhali
    • Haveli
    • Pune
    • 411062
  • Pincode411062
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100048730
  • ReraGenie IDRG-MH-63903

Builder

  • NameSHAKUNTAL GROUP
  • Entity typePartnership
  • PartnersJITENDRAKUMAR ARVINDBHAI PATEL, AJAY SHAMLAL VIJAY, ARUN SHAMLAL VIJAY, RAMESHBHAI ARVINDBHAI POKAR

Key dates

this monthRegisteredJan 2023First promiseMar 2026Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Jan 2023
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 31 Mar 2026)
  • Buildings1 building record
  • Documents filed89 files

Current status

53%175 of 328 units booked
80.0%Work done, per cost certificate

Figures as on 13 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHAKUNTAL COMMERCIANA1170328328

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

SHAKUNTAL COMMERCIA: 87% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 13 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes90%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,016 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
KERU BALA BHUJBALChikhaliPune
NARAYAN BALA BHUJBALChikhaliPune

Approvals and building plan

Sanctioning authorityPimpri-Chinchwad Municipal Corporation
Permissible FSI19085.94
Proposed, not sanctioned10,033 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMOSHI, PUNE - 412105
Estimated costRs 57.58 cr
Cost incurredRs 46.07 cr
Work done80.0%
BuildingWingEstimatedIncurred
SHAKUNTAL COMMERCIANARs 55.58 crRs 44.46 cr
-NARs 2.00 crRs 1.60 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRECISION ARCHITECHTS AND PLANNER
EngineerNILESH DIGHE & ASSOCIATES
Chartered AccountantH V PATEL AND ASSOCIATES
Chartered AccountantDIPALI KADAM
PartnerRole in project
SHAKUNTAL GROUP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA19022619911Mar 2026 → Jun 2027

Reason as filed by the promoterDear Sir/Ma’am, We, SHAKUNTAL GROUP, hereby declare the following with respect to the project “SHAKUNTAL COMMERCIA” bearing registration number P52100034545 registered under MahaRERA 1. Status of Work Completed: We are pleased to inform you that we have completed the 100% of RCC (Reinforced Cement Concrete) work for the buildings. Currently, we are undertaking the finishing work, which includes plastering, flooring, electrical fittings, and other essential internal and external works. 2. Expected Timeline for Completion: We are committed to completing all balance works and applying for the Occ

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Shakuntal Group Form 5 - Commercia 15-07-2026.pdf13 Aug 2026
Withdrawal Update Form 1File: Form 1.pdf24 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf24 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf24 Jul 2026
Withdrawal Update Form 1File: FORM 1 Shakuntal Group Commercia Mar 26.pdf20 Apr 2026
Withdrawal Update Form 2File: FORM 2 Shakuntal Group Commercia Mar 26.pdf20 Apr 2026
Withdrawal Update Form 3File: FORM 3 Shakuntal Group Commercia Mar 26.pdf20 Apr 2026
Form 1File: Form 1 Shakuntal Group 31-12-2025.pdf20 Jan 2026
Form 2File: Form 2 Shakuntal Group 31-12-2025.pdf20 Jan 2026
Form 3File: Form 3 Shakuntal Group 31-12-2025.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: Shakuntal Group Sold Unsold Disclosure.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: Shakuntal Group Sold Unsold Inventory Declaration Sep 25.pdf2 Nov 2025
Form 1File: Form 1 Shakuntal Group 30-09-2025.pdf2 Nov 2025
Form 2File: Form 2 Shakuntal Group 30-09-2025.pdf2 Nov 2025
Form 3File: Form 3 Shakuntal Group 30-09-2025.pdf2 Nov 2025
Form 1File: Form 1 Shakuntal Group 30-06-2025.pdf28 Jul 2025
Form 2File: Form 2 Shakuntal Group 30-06-2025.pdf28 Jul 2025
Form 3File: Form 3 Shakuntal Group 30-06-2025.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold & Booked Inventory - Shakuntal Group 30-06-2025.pdf28 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shakuntal Group 31-03-2025.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shakuntal Group 31-03-2025_compressed.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shakuntal Group 31-03-2025.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From -1 Shakuntal Group 31-12-2024.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From -3 Shakuntal Group 31-12-2024.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From -2 Shakuntal Group 31-12-2024.pdf16 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: From -5 Shakuntal Group.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shakuntal Group Commercia 30-09-2024.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shakuntal Group Commercia 30-09-2024_compressed.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shakuntal Group Commercia 30-09-2024.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shakuntal Group 30-06-2024.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shakuntal Group 30-06-2024.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shakuntal Group 30-06-2024.pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shakuntal Group 31-03-2024.pdf16 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shakuntal Group 31-03-2024 .pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shakuntal Group 31-03-2024 _compressed.pdf16 Apr 2024
Layout approvalFile: Layout_compressed.pdf30 Mar 2024
Building plan approvalFile: SENCTION PLAN 2.pdf30 Mar 2024
Building plan approvalFile: SENCTION PLAN 3.pdf30 Mar 2024
Building plan approvalFile: SENCTION PLAN 4.pdf30 Mar 2024
Building plan approvalFile: SENCTION PLAN 5.pdf30 Mar 2024
Building plan approvalFile: SENCTION PLAN 6.pdf30 Mar 2024
Copy of Layout Approval (in case of layout)File: Layout_compressed.pdf30 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: SENCTION PLAN 2.pdf30 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: SENCTION PLAN 3.pdf30 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: SENCTION PLAN 4.pdf30 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: SENCTION PLAN 5.pdf30 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: SENCTION PLAN 6.pdf30 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Shakuntal Group.pdf30 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shakuntal Group 04-01-2024.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shakuntal Commercia 31-12-2023.pdf14 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shakuntal Group 31-12-2023.pdf14 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Shakuntal CommercialGroup 30-09-2023.pdf27 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Shakuntal Group 30-09-2023 Comercial.pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 OF COMMERCIA 30-09-2023 .pdf12 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shakuntal Commercia 30-09-2023 .pdf12 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 OF COMMERCIA 30-09-23.pdf12 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 of Shakuntal Commercia 07-07-2023.pdf21 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 of commercia 30062023.pdf21 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Commercia 21072023.pdf21 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Commercia .pdf5 May 2023
Proforma of Agreement for saleFile: SHAKUNTAL GROUP 11-01-23.pdf11 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report 11-01-2023_11zon.pdf11 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 31-12-2022 FORM 3 OF CA_compressed.pdf10 Jan 2023
Details of encumbrances concerned to FinanceFile: No Encumrances Finance.pdf1 Jan 2023
Details of encumbrances concerned to FinanceFile: No Encumrances Legal.pdf1 Jan 2023
Details of encumbrances concerned to LegalFile: No Encumrances Finance.pdf1 Jan 2023
Details of encumbrances concerned to LegalFile: No Encumrances Legal.pdf1 Jan 2023
CERSAI detailsFile: CERSAI Search Report 01-01-2023.pdf1 Jan 2023
CERSAI detailsFile: UNDERTAKING FOR CERSAI REPORT.pdf1 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Partner.pdf1 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Formate A Bank Declration.pdf1 Jan 2023
Details of encumbrances concerned to FinanceFile: Encumbrances concerned to Legal.pdf22 Nov 2022
Details of encumbrances concerned to LegalFile: Encumbrances concerned to Legal.pdf22 Nov 2022
Declaration in FORM BFile: Form B Promoter .pdf22 Nov 2022
Deviation Report with respect to Allotment letterFile: Devaiton report Form Of allotment letter .pdf22 Nov 2022
Declaration about Commencement CertificateFile: Declaration about commencement FORMAT-D.pdf16 Nov 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER OF SHAKUNTAL COMMERCIA.pdf16 Nov 2022
Layout approvalFile: SANCTION PLAN 1.pdf15 Nov 2022
Building plan approvalFile: SANCTION PLAN 2 .pdf15 Nov 2022
Building plan approvalFile: SANCTION PLAN 3 .pdf15 Nov 2022

How this compares with Pune

53%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 15 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHAKUNTAL COMMERCIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chikhali13,700+ in Pune

2 kmSHAKUNTAL COMMERCIACompleted 76Lapsed / revoked 38Other 72Dot size: filed unitsN

Filed coordinates, straight-line distance. 186 registered projects within 2 km.

Builder: SHAKUNTAL GROUP

SHAKUNTAL GROUP has 1 registration on MahaRERA, including SHAKUNTAL COMMERCIA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SHAKUNTAL COMMERCIA is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHAKUNTAL COMMERCIA?

The registered promoter entity is SHAKUNTAL GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHAKUNTAL COMMERCIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHAKUNTAL COMMERCIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHAKUNTAL COMMERCIA?

The professionals named in the filing: Architect: PRECISION ARCHITECHTS AND PLANNER; Engineer: NILESH DIGHE & ASSOCIATES; Chartered Accountant: H V PATEL AND ASSOCIATES; Chartered Accountant: DIPALI KADAM. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHAKUNTAL COMMERCIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHAKUNTAL COMMERCIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHAKUNTAL COMMERCIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.