Home / Browse projects / Sindhudurg, Maharashtra / AXIS YOG VILLAS

Registered No litigation declared Residential / Group Housing project

AXIS YOG VILLAS

By ARUSH INFRA PROMOTERS PRIVATE LIMITED

RG-MH-04319 · RERA P52900021552 · Last updated on MahaRERA portal: 2 Jun 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 34 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
May 2027Possession promisedmoved 34 months from the original
0 of 66Construction stages doneacross 6 buildings; furthest along: Excavation, 25%
1Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

AXIS YOG VILLAS is a Residential / Group Housing project by ARUSH INFRA PROMOTERS PRIVATE LIMITED in Sindhudurg, Maharashtra, registered with MahaRERA as P52900021552 on 8 Jul 2019. Possession is promised by 31 May 2027. The completion date has moved by 34 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameAXIS YOG VILLAS
  • TypeResidential / Group Housing
  • Location
    • Yog City Main Road
    • Yog City
    • Maneri
    • Dodamarg
    • Sindhudurg
    • 416512
  • Pincode416512
  • RERA no.P52900021552
  • ReraGenie IDRG-MH-04319

Builder

  • NameARUSH INFRA PROMOTERS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsDEVESH KUMAR, ASHISH KUSHWAHA, PADMAJA KUSHWAHA

Key dates

this monthRegisteredJul 2019First promiseJul 2024Revised toMay 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Jul 2019
  • Promised completion31 May 2027
  • Revised completionRevised to 31 May 2027 (originally 31 Jul 2024)
  • Buildings6 building records
  • Documents filed80 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1NA20000
2NA20000
3NA20000
4NA20000
5NA20000
6NA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 2 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Excavation, at 25%.

12%
ActivityProgress
Excavation25%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
32%
ActivityProgress
Excavation25%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
42%
ActivityProgress
Excavation25%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
52%
ActivityProgress
Excavation25%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
62%
ActivityProgress
Excavation25%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed18

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots18
Open Space18
BuildingOpen SpaceTotal
133
233
333
433
533
633

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,989 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1539.0
Proposed, not sanctioned1,539 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVaishali, Ghaziabad

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpace design Group
EngineerSpace design Group
Chartered AccountantSatya Prakash Kushwaha
Chartered AccountantAshok Jayesh and Associates
PartnerRole in project
ARUSH INFRA PROMOTERS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52900027375Jul 2024 → May 2027

Reason as filed by the promoterAs you are aware, the COVID-19 pandemic began shortly after our project's launch in 2019 and persisted for nearly two years, significantly impacting our construction schedule. Additionally, our project is located in the Konkan region, which is known for heavy rainfall. The years 2022 and 2023 experienced exceptionally heavy rains, further hampering our construction activities.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12603211Navaneet Kumar SharmaARUSH INFRA PROMOTERS PRIVATE LIMITED28/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Jul 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Jul 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jul 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Jul 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 May 2027

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: 24-25 Form 1 Q1.pdf2 Jun 2026
Form 2File: FORM 2 FY 24-25 Q1.pdf2 Jun 2026
Form 3File: Form 3 Q1 FY 24-25.pdf2 Jun 2026
Disclosure of Sold and Booked InventoryFile: Discloser of Sold unsold inventory.pdf2 Jun 2026
Form 1File: 24-25 Form 1 Q2.pdf2 Jun 2026
Form 2File: FORM 2 FY 24-25 Q2.pdf2 Jun 2026
Form 3File: Form 3 Q2 FY 24-25.pdf2 Jun 2026
Disclosure of Sold and Booked InventoryFile: Discloser of Sold unsold inventory.pdf2 Jun 2026
Form 1File: 24-25 Form 1 Q3.pdf2 Jun 2026
Form 2File: FORM 2 FY 24-25 Q3.pdf2 Jun 2026
Form 3File: Form 3 Q3 FY 24-25.pdf2 Jun 2026
Disclosure of Sold and Booked InventoryFile: Discloser of Sold unsold inventory.pdf2 Jun 2026
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 FY 21-22.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 FY 22-23.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 FY 23-24.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 FY 24-25 Q1.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 FY 24-25 Q2.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 FY 24-25 Q3.pdf14 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A 21-22.pdf14 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A 22-23.pdf14 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A 23-24.pdf14 Apr 2025
Certificates of CA (Form 3)File: Form 3 Q3 FY 24-25.pdf7 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 FY 24-25 Q3.pdf7 Apr 2025
Declaration in FORM BFile: Form B Latest - Arush Infra Promoters Pvt Ltd.pdf28 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 21-22.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 22-23.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 22-23.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 22-23.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 22-23.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 23-24.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 23-24.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 23-24.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 23-24.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 24-25.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 24-25.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 21-22.pdf31 Jan 2025
Certificates of CA (Form 3)File: Form 3 Q1 FY 23-24.pdf14 Dec 2024
Certificates of CA (Form 3)File: Form 3 Q2 FY 23-24.pdf14 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format A - Separate Bank Account Declaration.pdf14 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 24-25 Qtr1.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 24-25 Qtr2.pdf22 Nov 2024
Proforma of Agreement for saleFile: Agreement to sale.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 24-25 Qtr1.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 24-25 Qtr2.pdf22 Nov 2024
Proforma of Agreement for saleFile: Agreement to sale.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 up to FY 21-22.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 up to FY 22-23.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 up to FY 23-24.pdf24 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A FY 21-22.pdf24 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A FY 22-23.pdf24 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A FY 23-24.pdf24 Oct 2024
Details of encumbrances concerned to FinanceFile: Encumbrance related to Legal.pdf12 Aug 2024
Details of encumbrances concerned to LegalFile: Encumbrance related to Legal.pdf12 Aug 2024
Disclosure of sold/ booked inventoryFile: Discloser of Sold unsold inventory.pdf12 Aug 2024
Certificates of CA (Form 3)File: form 3.pdf12 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Disclosure of interest in other real estate organizations.pdf12 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5.pdf12 Aug 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Separate Bank Account Declaration.pdf12 Aug 2024
Certificates of CA (Form 3)File: Rera Certificate Arush Infra.pdf21 Feb 2024
Certificates of CA (Form 3)File: Arush Infra Form-3.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Arush INFRA From-5.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form-5 Arush.pdf29 Mar 2023
Certificates of CA (Form 3)File: Arush Form 3.pdf23 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Rera 1.pdf23 Jan 2023
Certificates of CA (Form 3)File: Form03 Rera.pdf29 Sep 2022
Declaration about Commencement CertificateFile: ARUSH_YOG VILLAS.pdf30 Jul 2021
Disclosure of sold/ booked inventoryFile: Arush Infra.pdf30 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2.pdf29 Jul 2021
Copy of the legal title reportFile: Arush Infra Title report.pdf2 Jul 2019
Declaration in FORM BFile: AFFIDAVIT.pdf2 Jul 2019
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf2 Jul 2019
Building plan approvalFile: BUILDING APPROVAL PLAN.pdf1 Jul 2019
Layout approvalFile: LAYOUT PLAN.pdf1 Jul 2019
PAN CardFile: Pan Card_Arush Infra.pdf1 Jul 2019
Details of encumbrancesFile: No Ecumbrance Certificate.pdf1 Jul 2019
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf1 Jul 2019
Building Plan Approval (IOD)File: BUILDING APPROVAL PLAN.pdf1 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CUM NA PERMISSION.pdf1 Jul 2019
Proforma of Allotment letterFile: Allotment and Sales Agreement.pdf1 Jul 2019
Status of ConveyanceFile: INDEX II.pdf1 Jul 2019

How this compares with Sindhudurg

21%of Sindhudurg projects moved their completion datethis one moved by 34 months
30%of Sindhudurg registrations have lapsed or been cancelledthis one is on the register

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep AXIS YOG VILLAS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Yog City530+ in Sindhudurg

Builder: ARUSH INFRA PROMOTERS PRIVATE LIMITED

ARUSH INFRA PROMOTERS PRIVATE LIMITED has 1 registration on MahaRERA, including AXIS YOG VILLAS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if AXIS YOG VILLAS is delayed beyond 31 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AXIS YOG VILLAS?

The registered promoter entity is ARUSH INFRA PROMOTERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AXIS YOG VILLAS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against AXIS YOG VILLAS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for AXIS YOG VILLAS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AXIS YOG VILLAS?

The professionals named in the filing: Architect: Space design Group; Engineer: Space design Group; Chartered Accountant: Satya Prakash Kushwaha; Chartered Accountant: Ashok Jayesh and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AXIS YOG VILLAS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AXIS YOG VILLAS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AXIS YOG VILLAS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.