Red flags

  • Completion date moved by 71 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 71 months from the original
5 of 11Construction stages donefurthest along: Internal walls, 85%
29 of 78Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

AMANS MANNAT is a Residential / Group Housing project by GREEN CITY BUILDERS in Nagpur, Maharashtra, registered with MahaRERA as P50500008476 on 19 Aug 2017. Possession is promised by 31 Mar 2027. The completion date has moved by 71 months from the original filing. 49 of the 78 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameAMANS MANNAT
  • TypeResidential / Group Housing
  • Location
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440013
  • Pincode440013
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500008476
  • ReraGenie IDRG-MH-01783

Builder

  • NameGREEN CITY BUILDERS
  • Entity typePartnership
  • PartnerABID SHABBIR KHAN
  • Other registrations4 more →
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredAug 2017First promiseApr 2021Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Aug 2017
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 20 Apr 2021)
  • Buildings1 building record
  • Documents filed83 files

Current status

63%49 of 78 units booked
42.1%Work done, per cost certificate

Figures as on 20 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AMANS MANNATNA151378078

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 85%.

AMANS MANNAT: 75% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises55%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.45%

Progress on shared amenities15

As on 20 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes45%
Water SupplyYes15%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes15%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes40%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes35%
Electrical meter room, sub-station, receiving stationYes15%
Aggregate area of recreational Open SpaceYes50%
Open ParkingYes60%

Parking filed45

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots45
Closed/Covered1
Open Space44

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,664 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Nov 2025

Approvals and building plan

Sanctioning authorityNIT NAGPUR
Permissible FSI37052.5
Proposed, not sanctioned5,830 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch222 Vishnu Vaibhav Gr Floor Palm Road Civil Lines Nagpur
Estimated costRs 22.87 cr
Cost incurredRs 9.63 cr
Work done42.13%
BuildingWingEstimatedIncurred
AMANS MANNATNARs 21.90 crRs 9.31 cr
-NARs 97.00 lakhRs 32.00 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAJIV CHOUDHARY
EngineerP S PATANKAR
Engineershahbaz m khan
EngineerSHAHBAZ s KHAN
Chartered AccountantMTS & ASSOCIATES
Chartered AccountantHARIYANI AND ASSOCIATES A A
PartnerRole in project
GREEN CITY BUILDERS-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500019642Apr 2021 → Mar 2025

Reason as filed by the promoterCovid

EXT50500009544Apr 2021 → Apr 2022

Reason as filed by the promoterTHE REASON FOR DELAY ABOVE SAID SCHEME BECAUSE OF COVID-19 AND DUE NON AVAILABILITY OF LABOURS FOR CONSTRUCTION WORK .

EXT50500012777Apr 2021 → Mar 2024

Reason as filed by the promoterConstruction Work not yet completed.

EXT50500028343Apr 2021 → Mar 2027

Reason as filed by the promoterDue to unforeseen circumstances, the project has experienced unavoidable delays. Despite our best efforts to adhere to the original schedule, factors have significantly impacted our progress. We assure you that we are committed to completing the project at the earliest and are taking all necessary measures to expedite construction while maintaining the highest quality and compliance standards. In light of the above, we kindly request MahaRERA to consider our application and grant an extension for the completion deadline.We sincerely appreciate your understanding and cooperation. Kindly let us

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Apr 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 July to Sep-25.pdf20 Dec 2025
Withdrawal Update Form 2File: Form 2 A wing.pdf20 Dec 2025
Withdrawal Update Form 3File: Form 3 A wing.pdf20 Dec 2025
Withdrawal Update Form 1File: Form 1 April to June A wing.pdf9 Oct 2025
Withdrawal Update Form 2File: Form 2 April to June A wing.pdf9 Oct 2025
Withdrawal Update Form 3File: Form 3 April to June A wing.pdf9 Oct 2025
Declaration in FORM BFile: Form B.pdf16 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 A wing.pdf16 Jun 2025
Certificates of CA (Form 3)File: Form 3 A wing_compressed.pdf16 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 A wing.pdf16 Jun 2025
Disclosure of sold/ booked inventoryFile: Sold unsold inventory.pdf16 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A wing.pdf16 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 A wing.pdf26 Feb 2025
Certificates of CA (Form 3)File: Form 3 A wing_11zon.pdf26 Feb 2025
Proforma of Agreement for saleFile: Mannat blank.pdf26 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A wing.pdf26 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: From 1 April to june A.pdf2 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 July to sep A.pdf2 Dec 2024
Certificates of CA (Form 3)File: April to June 24 Awing form 3_compressed.pdf2 Dec 2024
Certificates of CA (Form 3)File: form 3_compressed.pdf2 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 April to June A.pdf2 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 July to sep A.pdf2 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf25 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf25 Jun 2024
Disclosure of sold/ booked inventoryFile: sold unsold inventory.pdf25 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank account details.pdf25 Jun 2024
Declaration in FORM BFile: Form B.pdf24 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2.pdf24 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf24 Jun 2024
Layout approvalFile: lAYOUT SANCTION.pdf30 Apr 2024
Building plan approvalFile: 4.PDF30 Apr 2024
Building plan approvalFile: 3.PDF30 Apr 2024
Building plan approvalFile: 2.PDF30 Apr 2024
Building plan approvalFile: 1 (2).PDF30 Apr 2024
Building plan approvalFile: 0.PDF30 Apr 2024
Layout approvalFile: Mannat sanctioned layout plan.pdf30 Apr 2024
Copy of Layout Approval (in case of layout)File: lAYOUT SANCTION.pdf30 Apr 2024
Copy of Layout Approval (in case of layout)File: Mannat sanctioned layout plan.pdf30 Apr 2024
Building Plan Approval (IOD)File: 4.PDF30 Apr 2024
Building Plan Approval (IOD)File: 3.PDF30 Apr 2024
Building Plan Approval (IOD)File: 2.PDF30 Apr 2024
Building Plan Approval (IOD)File: 1 (2).PDF30 Apr 2024
Building Plan Approval (IOD)File: 0.PDF30 Apr 2024
Declaration in FORM BFile: Form B.pdf30 Apr 2024
Declaration in FORM BFile: Application for extension.pdf30 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2.pdf30 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200305330168_For_Asset_Based_Search_30_04_2024_15_45_30_425.pdf30 Apr 2024
Certificates of CA (Form 3)File: Form 3.pdf30 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration of interest in other.pdf30 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration bank account.pdf30 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf30 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21).pdf9 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf9 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2.pdf9 Dec 2023
Disclosure of sold/ booked inventoryFile: sold unsold inventory.pdf9 Dec 2023
Certificates of CA (Form 3)File: form 3.pdf9 Dec 2023
Declaration about Commencement CertificateFile: Awing mannat-Declaration.pdf11 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: engg 19-20.pdf11 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: engg 2020-21.pdf11 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: engg 2021-22.pdf11 Nov 2022
Disclosure of sold/ booked inventoryFile: A-wing information of sold (1).pdf11 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Mannat FY 18-19.pdf11 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Mannat FY 19-20.pdf11 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Mannat 20-21.pdf11 Nov 2022
Building plan approvalFile: aman mannat_0005-0005.pdf14 Apr 2021
Building Plan Approval (IOD)File: aman mannat_0005-0005.pdf14 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: aman mannat_0007-0007.pdf14 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: aman mannat_0008-0008.pdf14 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: aman mannat_0009-0009.pdf14 Apr 2021
Layout approvalFile: scan018 (2 files merged).pdf29 Jul 2017
Building plan approvalFile: PERMIT.pdf29 Jul 2017
PAN CardFile: GCB PAN.pdf29 Jul 2017
Copy of the legal title reportFile: mannat letter.pdf29 Jul 2017
Details of encumbrancesFile: embrancement.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: scan018 (2 files merged).pdf29 Jul 2017
Building Plan Approval (IOD)File: PERMIT.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: PERMIT.pdf29 Jul 2017
Declaration in FORM BFile: FORM B.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG.pdf29 Jul 2017

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late1 not delivered by the promised date1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
AMANS MANNAT-BLOCK C-1P50500048603Opposite Ayyappa Temple Ring Road, Nagpur52Jan 2023OngoingMar 2027Registered original: Mar 2025Not due yet
AMANS MANNAT-BLOCK C-2P50500029956Opposite Ayyappa Temple Ring Road, Nagpur-Jul 2021Certificate SignedSep 2025Not delivered
AMAN IMPERIALKHURANA LAYOUT ANANT NAGAR NAGPUR44-CompletedFeb 2015Late, May 2015
AMAN SIGNATURENEW COLONONY BYRAMJI TOWN NAGPUR21-CompletedMar 2014Late, Jun 2014

How this compares with Nagpur

63%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 71 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AMANS MANNAT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nagpur (M Corp.)2,800+ in Nagpur

2 kmAMANS MANNATCompleted 15Lapsed / revoked 4Other 27Dot size: filed unitsN

Filed coordinates, straight-line distance. 46 registered projects within 2 km.

Builder: GREEN CITY BUILDERS

GREEN CITY BUILDERS has 5 registrations on MahaRERA, including AMANS GREEN PARK and AMAN SERENITY. Its filings disclose 5 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if AMANS MANNAT is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AMANS MANNAT?

The registered promoter entity is GREEN CITY BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AMANS MANNAT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AMANS MANNAT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AMANS MANNAT?

The professionals named in the filing: Architect: RAJIV CHOUDHARY; Engineer: P S PATANKAR; Engineer: shahbaz m khan; Engineer: SHAHBAZ s KHAN; Chartered Accountant: MTS & ASSOCIATES; Chartered Accountant: HARIYANI AND ASSOCIATES A A. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AMANS MANNAT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AMANS MANNAT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AMANS MANNAT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.