Home / Browse projects / Nagpur, Maharashtra / RACHANA PURVA

Registered Litigation declared Others project

RACHANA PURVA

By Rachana Developers

RG-MH-67874 · RERA P50500053221 · Last updated on MahaRERA portal: 17 Jul 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Litigation declared, 1 case
  • Completion date moved by 3 months
  • 1 extension taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
4 of 11Construction stages donefurthest along: Internal walls, 90%
20 of 135Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

RACHANA PURVA is a Others project by Rachana Developers in Nagpur, Maharashtra, registered with MahaRERA as P50500053221 on 23 Oct 2023. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 3 months from the original filing. 115 of the 135 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameRACHANA PURVA
  • TypeOthers
  • Location
    • Plot no. 5
    • KH. No. 22/1-2-3/3
    • Borgaon
    • Nagpur- 440013.
    • Borgaon
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440013
  • Pincode440013
  • RERA no.P50500053221
  • ReraGenie IDRG-MH-67874

Builder

  • NameRachana Developers
  • Entity typePartnership
  • Partnersshishir shankarrao Diote, Nilima shishir Diote, Raunak Shishir Diote
  • Other registrations11 more →
  • Completed8 of 12
  • Past their filed date1
  • Declared earlier projects1 →

Key dates

1 months past promisethis monthRegisteredOct 2023First promiseJun 2026Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Oct 2023
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 30 Jun 2026)
  • Buildings1 building record
  • Documents filed102 files

Current status

85%115 of 135 units booked
81.9%Work done, per cost certificate

Figures as on 17 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Rachana PurvaNA14141305135

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

Rachana Purva: 63% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed449

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots449
Closed/Covered158
Open Space291

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,431 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Jul 2025

Approvals and building plan

Sanctioning authorityNagpur Improvement Trust
Permissible FSI15953.11
Proposed, not sanctioned15,953 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDHARMAPETH NAGPUR
Estimated costRs 43.21 cr
Cost incurredRs 35.39 cr
Work done81.91%
BuildingWingEstimatedIncurred
Rachana PurvaNARs 40.36 crRs 31.65 cr
-NARs 2.86 crRs 3.75 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUlhas Mude and Associates Ulhas Mude
EngineerMR PRANIL KACHOLE
EngineerVinay Kulkarni
Chartered AccountantMr Shirish Waman Bhagat
Chartered AccountantUrja Shekhar Jain
Chartered AccountantHimesh Narayan Demble
PartnerRole in project
Rachana Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA30042620797Jun 2026 → Sep 2026

Reason as filed by the promoterApplying under section 6 of RERA ACT.. That it is to be submitted that our project “Rachana Purva” is completed about 85% and due for completion and Occupancy Certificate (OC) till 30.06.2026. But due to present Middle East War crisis more specifically pertaining to Power and fuel section, we are not getting the supply of Tiles/Fire Equipment’s/Steel/Cement/Aluminium from the manufacturer, as raw material required to make these products contents petroleum, oil, natural gases etc. and also diesel for transportation. Due to interruption in supply of these material, interruption in ship routes et

Litigation declared1

CaseCourtStatus
1351/2023CIVIL JUDGE SR DIVISION NAGPUR URBAN NAGPURClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Purva June 2026.pdf17 Jul 2026
Withdrawal Update Form 1File: Architect Purva June 2026.pdf17 Jul 2026
Withdrawal Update Form 2File: Engineer Purva June 2026.pdf17 Jul 2026
Withdrawal Update Form 2File: Engineer Purva June 2026.pdf17 Jul 2026
Withdrawal Update Form 3File: CA Purva June 26.pdf17 Jul 2026
Withdrawal Update Form 3File: CA Purva June 26.pdf17 Jul 2026
Withdrawal Update Form 1File: Purva Architect March 2026.pdf16 Apr 2026
Withdrawal Update Form 2File: Purva Engineer March 2026.pdf16 Apr 2026
Withdrawal Update Form 3File: Purva CA March 2026.pdf16 Apr 2026
Withdrawal Update Form 1File: Purva Architect Dec 2025.pdf13 Jan 2026
Withdrawal Update Form 2File: purva Engineers Dec 2025.pdf13 Jan 2026
Withdrawal Update Form 3File: PURVA CA Dec 2025.pdf13 Jan 2026
Withdrawal Update Form 1File: Purva Architect Sep 2025.pdf10 Oct 2025
Withdrawal Update Form 2File: Purva Engineer Sep 2025.pdf10 Oct 2025
Withdrawal Update Form 3File: Purva CA Sep 2025.pdf10 Oct 2025
Form 2A (FY 2024-2025)File: PURVA Form 2A anually Sep 2025.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: PURVA Form 5 CA anuual Sep 25.pdf30 Sep 2025
Form 1File: Architect Purva March 25.pdf12 Jun 2025
Form 2File: Engineer Purva March 25.pdf12 Jun 2025
Form 3File: CA Purva March 25.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold unsold Purva March.pdf12 Jun 2025
OthersFile: Quality Purva March 25.pdf12 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Purva March 25.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Purva March 25.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Purva March 25.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: sold unsold Purva March.pdf11 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Purva March 25.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Purva Dec 2024.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Purva Dec 2024.pdf9 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Purva Dec 24.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold unsold purva Dec 2024.pdf9 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: quality Purva Dec 2024.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: RAchana Purva sold unsold sep 2024.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PURVA Architect September 2024.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PURVA CA Sep 2024.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Purva Engineer Sep 2024.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Purva Quality Sep 24.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PURVA Architect Certificate June 2024.pdf6 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PURVA Form 2 Engineer Certificate June 2024.pdf6 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: PURVA Form 2 A Quality Engineer June 2024.pdf6 Jul 2024
Disclosure of sold/ booked inventoryFile: PURVA Sold unsold inventory June 2024.pdf6 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PURVA reduce CA CERTIFICATE June 2024_11zon.pdf6 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 PURVA MARCH 24.pdf9 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PURVA MARCH 24_compressed.pdf9 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 PDF 2.pdf8 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form -2A Purva.pdf8 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure PDF Purva.pdf8 Apr 2024
Proforma of Allotment letterFile: Updated Allotment Letter Purva.pdf27 Mar 2024
Proforma of Agreement for saleFile: Updated ATS Purva 260324.pdf27 Mar 2024
Details of encumbrances concerned to FinanceFile: Declaration PURVA.pdf21 Mar 2024
Details of encumbrances concerned to FinanceFile: REJOINDER OF PURVA.pdf21 Mar 2024
Details of encumbrances concerned to FinanceFile: DISCLOSURE PURVA.pdf21 Mar 2024
Details of encumbrances concerned to LegalFile: Declaration PURVA.pdf21 Mar 2024
Details of encumbrances concerned to LegalFile: REJOINDER OF PURVA.pdf21 Mar 2024
Details of encumbrances concerned to LegalFile: DISCLOSURE PURVA.pdf21 Mar 2024
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf11 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rachana Purva F1.pdf9 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2.pdf9 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Purva 2A.pdf9 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3.pdf9 Jan 2024
Building plan approvalFile: Main layout Highlighted with all details.pdf17 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Main layout Highlighted with all details.pdf17 Oct 2023
Other - TechnicalFile: 11 Other - Legal.pdf12 Oct 2023
Other - LegalFile: Layout Approval 1.pdf7 Oct 2023
Other - LegalFile: Layout Approval 2_compressed_compressed.pdf7 Oct 2023
Other - LegalFile: Layout Approval 3_compressed.pdf7 Oct 2023
Other - LegalFile: Layout Approval 4.pdf7 Oct 2023
Other - LegalFile: CompressedSALE DEED RACHANA DEVELOPERS (1).pdf22 Sep 2023
Other - LegalFile: CompressedSALE DEED RACHANA DEVELOPERS (2).pdf22 Sep 2023
Other - LegalFile: CompressedSALE DEED RACHANA DEVELOPERS (3).pdf22 Sep 2023
Other - LegalFile: CompressedSALE DEED RACHANA DEVELOPERS (4).pdf22 Sep 2023
Other - LegalFile: CompressedSALE DEED RACHANA DEVELOPERS (5).pdf22 Sep 2023
Other - LegalFile: 1-SALE DEED RACHANA DEVELOPERS 18-02-17-76-79.pdf22 Sep 2023
Proforma of Agreement for saleFile: ATS Rachana purva (1).pdf15 Sep 2023
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement (17) (1).pdf15 Sep 2023
CERSAI detailsFile: CERSAI_Search_Report_200280375076_For_Asset_Based_Search_14_09_2023_16_35_45_877 (1).pdf14 Sep 2023
Layout approvalFile: 1 Copy of Layout Approval (in case of layout) (33).pdf11 Sep 2023
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development (14).pdf11 Sep 2023
Building plan approvalFile: 8 Other - Legal (1).pdf11 Sep 2023
Building plan approvalFile: 9 Other - Legal (1).pdf11 Sep 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationStatusPromisedDelivered
Rachana Mithila Phase 1KH No 8 Mouza- Pipla Nagpur Rural 440034CompletedJul 2017Jul 2017

How this compares with Nagpur

85%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 3 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RACHANA PURVA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borgaon2,800+ in Nagpur

Builder: Rachana Developers

Rachana Developers has 12 registrations on MahaRERA, including Rachana Samruddhi and GURUVIHAR. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if RACHANA PURVA is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RACHANA PURVA?

The registered promoter entity is Rachana Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RACHANA PURVA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RACHANA PURVA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RACHANA PURVA?

The professionals named in the filing: Architect: Ulhas Mude and Associates Ulhas Mude; Engineer: MR PRANIL KACHOLE; Engineer: Vinay Kulkarni; Chartered Accountant: Mr Shirish Waman Bhagat; Chartered Accountant: Urja Shekhar Jain; Chartered Accountant: Himesh Narayan Demble. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RACHANA PURVA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RACHANA PURVA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RACHANA PURVA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.