AMANS MANNAT-BLOCK C-1

By GREEN CITY BUILDERS

RG-MH-16331 · RERA P50500048603 · Last updated on MahaRERA portal: 20 Dec 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 24 months from the original
5 of 11Construction stages donefurthest along: Internal walls, 95%
19 of 52Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

AMANS MANNAT-BLOCK C-1 is a Residential / Group Housing project by GREEN CITY BUILDERS in Nagpur, Maharashtra, registered with MahaRERA as P50500048603 on 10 Jan 2023. Possession is promised by 31 Mar 2027. The completion date has moved by 24 months from the original filing. 33 of the 52 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameAMANS MANNAT-BLOCK C-1
  • TypeResidential / Group Housing
  • Location
    • Chaudhary Layout
    • Zingabai Takli Nagpur
    • Opposite Ayyappa Temple Ring Road
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440013
  • Pincode440013
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500048603
  • ReraGenie IDRG-MH-16331

Builder

  • NameGREEN CITY BUILDERS
  • Entity typePartnership
  • PartnerABID SHABBIR KHAN
  • Other registrations4 more →
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredJan 2023First promiseMar 2025Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Jan 2023
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 21 Mar 2025)
  • Buildings1 building record
  • Documents filed80 files

Current status

63%33 of 52 units booked
92.5%Work done, per cost certificate

Figures as on 20 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK C-1NA0052052

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

BLOCK C-1: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.45%

Progress on shared amenities15

As on 20 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes85%
Street LightingYes75%
Community BuildingsYes55%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes35%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,630 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Nov 2025
LandownerVillageDistrict
Greencity BuildersNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNIT NAGPUR
Permissible FSI3629.0
Proposed, not sanctioned3,629 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNo 742, Ground Floor Byramji Town, Nelson Square, Chindwara Rd, Nagpur,
Estimated costRs 8.40 cr
Cost incurredRs 7.77 cr
Work done92.48%
BuildingWingEstimatedIncurred
BLOCK C-1NARs 8.00 crRs 7.43 cr
-NARs 40.00 lakhRs 34.00 lakh

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRajiv Choudhary R CHOUDHARY
ArchitectRAJIV CHOUDHARY
EngineerShahbaz Khan
Engineershahbaz m khan
EngineerSHAHBAZ s KHAN
Chartered AccountantKapil Maheshwari
Chartered AccountantHARIYANI AND ASSOCIATES F F
Chartered AccountantNEHA A HARIYANI ASSOCIATES
Chartered AccountantHARIYANI AND ASSOCIATES A A
PartnerRole in project
GREEN CITY BUILDERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500027934Mar 2025 → Mar 2027

Reason as filed by the promoterDue to unforeseen circumstances, the project has experienced unavoidable delays. Despite our best efforts to adhere to the original schedule, these factors have significantly impacted our progress. We assure you that we are committed to completing the project at the earliest and are taking all necessary measures to expedite construction while maintaining the highest quality and compliance standards. In light of the above, we kindly request MahaRERA to consider our application and grant an extension for the completion deadline. We sincerely appreciate your understanding and cooperation. Kindly

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 July to Sep-25.pdf20 Dec 2025
Form 2File: Form 2 C1 wing.pdf20 Dec 2025
Form 3File: Form 3 C1 wing.pdf20 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf20 Dec 2025
Self-declaration of Quarterly ProgressFile: sold unsold.pdf20 Dec 2025
Withdrawal Update Form 1File: Form 1 April To June.pdf9 Oct 2025
Withdrawal Update Form 2File: Form 2 April to June C1.pdf9 Oct 2025
Withdrawal Update Form 3File: Form 3 April to June C1.pdf9 Oct 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format b C1.pdf1 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 C1.pdf26 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 C1_11zon.pdf26 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 C1.pdf26 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 C1.pdf26 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 C1.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 April to June C1.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: from 1 mannat July to sep.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 April to June 24 C1_compressed.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: July to sep 24 C1 from 3_compressed.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 April to June C1.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 July to Sep.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jan-Mar 24.pdf30 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: C1 form 2.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C1 form 3.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JAN-MAR 23 form- 1.pdf12 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: april-june 23 form 1.pdf12 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: april-june23 form 2.pdf12 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JAN-MAR 23 form- 2.pdf12 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JAN-MAR 23 form- 3_compressed.pdf12 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: april-june 23 form 3_compressed.pdf12 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_compressed.pdf10 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2-jan-mar.pdf10 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2-april-june.pdf10 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1- april-june_compressed.pdf10 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2.pdf10 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_compressed.pdf10 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3-april-june_compressed.pdf10 Nov 2023
Declaration about Commencement CertificateFile: commencement.pdf23 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect.pdf23 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Form 2.pdf23 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engg Form 2.pdf23 Sep 2023
CERSAI detailsFile: CERSAI_Search_Report_200281060313_For_Asset_Based_Search_21_09_2023_12_34_05_157.pdf23 Sep 2023
Disclosure of sold/ booked inventoryFile: Desclosure sold unsold.pdf23 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf23 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf23 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT NGP.pdf4 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXER 1.pdf3 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXER 2.pdf3 Jan 2023
Details of encumbrances concerned to FinanceFile: Legal Concerned.pdf15 Dec 2022
Details of encumbrances concerned to LegalFile: Legal Concerned.pdf15 Dec 2022
CERSAI detailsFile: Cersai Consern.pdf12 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf5 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf5 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Details.pdf23 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf8 Nov 2022
Declaration about Commencement CertificateFile: CC 1.pdf8 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: CC Regarding.pdf7 Nov 2022
Details of encumbrances concerned to FinanceFile: No Encumbrance.pdf11 Oct 2022
Details of encumbrances concerned to LegalFile: Legal Concerned.pdf11 Oct 2022
Deviation Report with respect to Allotment letterFile: Deviation AL.pdf11 Oct 2022
Deviation Report with respect to model copy of AgreementFile: Deviation AFS.pdf11 Oct 2022
Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf10 Oct 2022
Building plan approvalFile: 1.pdf10 Oct 2022
Building plan approvalFile: 2.pdf10 Oct 2022
Building plan approvalFile: 3.pdf10 Oct 2022
Building plan approvalFile: 4.pdf10 Oct 2022
PAN CardFile: 1 PAN Card.pdf10 Oct 2022
Copy of the legal title reportFile: Title Report.pdf10 Oct 2022
Copy of the legal title reportFile: Legal Report.pdf10 Oct 2022
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout).pdf10 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf10 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf10 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf10 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf10 Oct 2022
Declaration in FORM BFile: Form B.pdf10 Oct 2022
CERSAI detailsFile: CERSAI Search Report.pdf10 Oct 2022
Proforma of Agreement for saleFile: Agreement For Sale Format in RERA.pdf10 Oct 2022
Proforma of Allotment letterFile: Agreement For Sale Format in RERA.pdf10 Oct 2022
Proforma of Allotment letterFile: Allotment Letter RERA Format.pdf10 Oct 2022
Proforma of Agreement for saleFile: Allotment Letter RERA Format.pdf10 Oct 2022

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late2 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
AMANS MANNAT-BLOCK C-2P50500029956Opposite Ayyappa Temple Ring Road, Nagpur-Jul 2021Certificate SignedSep 2025Not delivered
AMANS MANNATP50500008476Nagpur (M Corp.), Nagpur78Aug 2017Certificate SignedMar 2025Registered original: Apr 2021Not delivered
AMAN IMPERIALKHURANA LAYOUT ANANT NAGAR NAGPUR44-CompletedFeb 2015Late, May 2015
AMAN SIGNATURENEW COLONONY BYRAMJI TOWN NAGPUR21-CompletedMar 2014Late, Jun 2014

How this compares with Nagpur

63%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 24 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AMANS MANNAT-BLOCK C-1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Opposite Ayyappa Temple Ring Road2,800+ in Nagpur

2 kmAMANS MANNAT-BLOCK C-1Completed 15Lapsed / revoked 4Other 27Dot size: filed unitsN

Filed coordinates, straight-line distance. 46 registered projects within 2 km.

Builder: GREEN CITY BUILDERS

GREEN CITY BUILDERS has 5 registrations on MahaRERA, including AMANS GREEN PARK and AMAN SERENITY. Its filings disclose 5 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if AMANS MANNAT-BLOCK C-1 is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AMANS MANNAT-BLOCK C-1?

The registered promoter entity is GREEN CITY BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AMANS MANNAT-BLOCK C-1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AMANS MANNAT-BLOCK C-1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AMANS MANNAT-BLOCK C-1?

The professionals named in the filing: Architect: Rajiv Choudhary R CHOUDHARY; Architect: RAJIV CHOUDHARY; Engineer: Shahbaz Khan; Engineer: shahbaz m khan; Engineer: SHAHBAZ s KHAN; Chartered Accountant: Kapil Maheshwari. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AMANS MANNAT-BLOCK C-1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AMANS MANNAT-BLOCK C-1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AMANS MANNAT-BLOCK C-1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.