Home / Browse projects / Nagpur, Maharashtra / OAK STERLING VISTA
OAK STERLING VISTA
RG-MH-72661 · RERA P50500055834 · Last updated on MahaRERA portal: 24 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 12 months
- 1 extension taken
- Rs 18.00 crore secured on the land, in favour of STATE BANK OF INDIA
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
OAK STERLING VISTA is a Residential / Group Housing project by OAK STERLING VISTA LLP in Nagpur, Maharashtra, registered with MahaRERA as P50500055834 on 22 Apr 2024. Possession is promised by 31 Dec 2027. The completion date has moved by 12 months from the original filing. 17 of the 133 units on this registration are recorded sold or booked, and 2 of 33 construction stages are filed complete.
At a glance
Project
- NameOAK STERLING VISTA
- TypeResidential / Group Housing
- Location
- ZINGABAI TAKLI
- MOUZA ZINGABAI TAKLI
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 440013
- Pincode440013
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500055834
- ReraGenie IDRG-MH-72661
Builder
- NameOAK STERLING VISTA LLP
- Entity typePartnership
- PartnersOMAIR ABDUL KHADER, MAHESH CHANDRABHAN KINGRANI, RAJESH CHANDRABHAN KINGRANI
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Apr 2024
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2026)
- Buildings3 building records
- Documents filed122 files
Current status
Figures as on 24 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 9 | 7 | 56 | 0 | 56 |
| WING B | NA | 9 | 7 | 56 | 0 | 56 |
| WING C | NA | 5 | 3 | 21 | 0 | 21 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 24 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 95%.
WING A63%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 95% |
| Podiums (if any) | 0% |
| Plinth | 95% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 95% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 87% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 65% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING B39%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 80% |
| Podiums (if any) | 0% |
| Plinth | 95% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 60% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING C0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 24 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed266
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| WING A | 103 | 103 |
| WING B | 103 | 103 |
| WING C | 60 | 60 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING B | NA | Rs 12.10 cr | Rs 8.44 cr |
| WING A | NA | Rs 12.04 cr | Rs 11.54 cr |
| WING C | NA | Rs 4.61 cr | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SYED MOBIN ARCHITECTS |
| Engineer | N B DANDEKAR |
| Chartered Accountant | CA ANKIT TALREJA |
| Chartered Accountant | SUMIT SANTOSH AGRAWAL & ASSOCIATES |
| Partner | Role in project |
|---|---|
| OAK STERLING VISTA LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterTo, The Maharashtra Real Estate Regulatory Authority (MahaRERA) Mumbai, Maharashtra Subject: Declaration for Extension of Project under Section 7(3) of the Real Estate (Regulation and Development) Act, 2016. Project Name: OAK STERLING VISTA RERA Registration Number: P50500055834 Original Project Completion Date: 31/12/2026 Proposed Extended Completion Date: 31/12/2027 ________________________________________ Declaration and Reason for Extension We, M/s Oak Sterling Vista LLP, the Promoter of the project titled “OAK STERLING VISTA”, bearing MahaRERA Registration No. P50500055834, hereby apply f
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Mar 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Mar 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Mar 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed122
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM-1 OAK STERLING VISTA JUN-2026.pdf | 24 Jul 2026 |
| Withdrawal Update Form 2File: FORM-2 OAK STERLING VISTA JUN-2026.pdf | 24 Jul 2026 |
| Withdrawal Update Form 3File: FORM-3 OAK STERLING VISTA JUN-2026.pdf | 24 Jul 2026 |
| Withdrawal Update Form 1File: FORM-1 OAK STERLING VISTA MAR-2026.pdf | 18 Jul 2026 |
| Withdrawal Update Form 2File: FORM-2 OAK STERLING VISTA MAR-2026.pdf | 18 Jul 2026 |
| Withdrawal Update Form 3File: FORM-3 OAK STERLING VISTA MAR-2026.pdf | 18 Jul 2026 |
| Withdrawal Update Form 1File: FORM-1 OAK STERLING VISTA MAR-2026.pdf | 23 Apr 2026 |
| Withdrawal Update Form 2File: FORM-2 OAK STERLING VISTA MAR-2026.pdf | 23 Apr 2026 |
| Withdrawal Update Form 3File: FORM-3 OAK STERLING VISTA MAR-2026.pdf | 23 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Oak Sterling Vista_ DEC 2025.pdf | 8 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Sterling Vista_DEC 2025.pdf | 8 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 Sterling Vista_DEC 2025.pdf | 8 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Oak Sterling Vista_ DEC 2025.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Sterling Vista_DEC 2025.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Sterling Vista_DEC 2025.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: FORM-1.pdf | 27 Oct 2025 |
| Withdrawal Update Form 2File: FORM-2.pdf | 27 Oct 2025 |
| Withdrawal Update Form 3File: FORM-3.pdf | 27 Oct 2025 |
| Form 1File: FORM-1 JUN-24 UPDATE.pdf | 22 Sep 2025 |
| Form 2File: FORM-2 JUN-24.pdf | 22 Sep 2025 |
| Form 3File: FORM-3 JUN-24 UPDATE.pdf | 22 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD JUN-24.pdf | 22 Sep 2025 |
| Form 1File: FORM-1 SEPT-24.pdf | 22 Sep 2025 |
| Form 2File: FORM-2 SEPT-24.pdf | 22 Sep 2025 |
| Form 3File: FORM-3 SEPT-24.pdf | 22 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD SEPT-24.pdf | 22 Sep 2025 |
| Form 1File: FORM-1 DEC-24 UPDATE.pdf | 22 Sep 2025 |
| Form 2File: FORM-2 DEC-24.pdf | 22 Sep 2025 |
| Form 3File: FORM-3 DEC-24 UPDATER.pdf | 22 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD DEC-24 UPDATE.pdf | 22 Sep 2025 |
| Form 1File: FORM-1 MAR-25.pdf | 22 Sep 2025 |
| Form 2File: FORM-2 MAR-25.pdf | 22 Sep 2025 |
| Form 3File: FORM-3 MAR-25.pdf | 22 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD MAR-25.pdf | 22 Sep 2025 |
| Withdrawal Update Form 1File: FORM-1 JUN-25.pdf | 21 Sep 2025 |
| Withdrawal Update Form 2File: FORM-2 JUN-25.pdf | 21 Sep 2025 |
| Withdrawal Update Form 3File: FORM-3 JUN-25.pdf | 21 Sep 2025 |
| Withdrawal Update Form 1File: FORM-1.pdf | 8 Jul 2025 |
| Withdrawal Update Form 1File: FORM-1.pdf | 8 Jul 2025 |
| Withdrawal Update Form 2File: FORM-2.pdf | 8 Jul 2025 |
| Withdrawal Update Form 2File: FORM-2.pdf | 8 Jul 2025 |
| Withdrawal Update Form 3File: FORM-3.pdf | 8 Jul 2025 |
| Withdrawal Update Form 3File: FORM-3.pdf | 8 Jul 2025 |
| Form 2A (FY 2024-2025)File: FORM-2A.pdf | 8 Jul 2025 |
| Form 5 (FY 2024-2025)File: FORM-5.pdf | 8 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Medsquare Form 1 - March 25.pdf | 15 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 15 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Medsquare Form 3 - March 25.pdf | 15 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 15 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Medsquare Form 2 - March 25.pdf | 15 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 15 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Medsquare Inventory March 25.pdf | 15 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD.pdf | 15 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 OAK Sterling Vista_Dec-2024_.pdf | 22 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sterling Vista_Dec-2024.pdf | 22 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold of Sterling Vista_Dec-2024.pdf | 21 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dec 24 OAK Sterling Vista.pdf | 2 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sterling Vista - Form 3 Sep 24 (1).pdf | 17 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sterling Vista - Form 2 Sep 24.pdf | 17 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory - Sterling Vista Sep 24.pdf | 17 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sterling Vista Sep 24.pdf | 15 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sterling Vista - Form 3 June 24_compressed.pdf | 21 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sterling Vista - Form 2 June 24.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sterling Vista Inventory - June 24.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sterling Vista - Form 1 June 24 08-Jul-2024 16-35-52.pdf | 13 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Quality-Annexure A Royal Regency Kalidas.pdf | 3 Apr 2024 |
| Other - TechnicalFile: Quality-Annexure A Royal Regency Kalidas.pdf | 3 Apr 2024 |
| Layout approvalFile: Sterling Vista Layout plan.pdf | 9 Mar 2024 |
| Building plan approvalFile: 1.pdf | 9 Mar 2024 |
| Building plan approvalFile: 2.pdf | 9 Mar 2024 |
| Building plan approvalFile: 3.pdf | 9 Mar 2024 |
| Building plan approvalFile: 4.pdf | 9 Mar 2024 |
| Building plan approvalFile: 5.pdf | 9 Mar 2024 |
| Building plan approvalFile: 6.pdf | 9 Mar 2024 |
| Building plan approvalFile: 7.pdf | 9 Mar 2024 |
| Building plan approvalFile: 8.pdf | 9 Mar 2024 |
| Building plan approvalFile: 9.pdf | 9 Mar 2024 |
| PAN CardFile: PAN.pdf | 9 Mar 2024 |
| Copy of the legal title reportFile: Search Report - OAK STERLING VISTA.pdf | 9 Mar 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance - Finance.pdf | 9 Mar 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 122 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep OAK STERLING VISTA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MOUZA ZINGABAI TAKLI2,800+ in Nagpur
Filed coordinates, straight-line distance. 42 registered projects within 2 km.
MAHALAXMI NAGAR 39
MAHALAXMI AEDIFICATORS PRIVATE LIMITED
Naniks Ashtavinayak Bhakti-4
Bhawana Mahesh Sadhwani
Balaji Town
Surendra R Mahakalkar & 3 Others (Partner
RACHANA PURVA
Rachana Developers
MB TOWN 4
MAHARANA AND BOSE ASSOCIATES
RACHANA ROHINI
Rachana Developers
See every Nagpur project, with the district possession charts
Builder: OAK STERLING VISTA LLP
OAK STERLING VISTA LLP has 1 registration on MahaRERA, including OAK STERLING VISTA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if OAK STERLING VISTA is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of OAK STERLING VISTA?
The registered promoter entity is OAK STERLING VISTA LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in OAK STERLING VISTA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for OAK STERLING VISTA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at OAK STERLING VISTA?
The professionals named in the filing: Architect: SYED MOBIN ARCHITECTS; Engineer: N B DANDEKAR; Chartered Accountant: CA ANKIT TALREJA; Chartered Accountant: SUMIT SANTOSH AGRAWAL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in OAK STERLING VISTA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback