Home / Browse projects / Sindhudurg, Maharashtra / ALTURA
ALTURA
RG-MH-06235 · RERA P52900055534 · Last updated on MahaRERA portal: 7 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ALTURA is a Residential / Group Housing project by M/s. Block Buildtech LLP in Sindhudurg, Maharashtra, registered with MahaRERA as P52900055534 on 2 Apr 2024. Possession is promised by 31 Dec 2027. 10 of the 52 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.
At a glance
Project
- NameALTURA
- TypeResidential / Group Housing
- Location
- Dodamarg Road
- Kasai Dodamarg
- Kasai
- Dodamarg
- Sindhudurg
- 416512
- Pincode416512
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52900055534
- ReraGenie IDRG-MH-06235
Builder
- NameM/s. Block Buildtech LLP
- Entity typeCompany
- Managing DirectorSunil Kumar Verma
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on2 Apr 2024
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings2 building records
- Documents filed68 files
Current status
Figures as on 7 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building A | NA | 5 | 5 | 24 | 0 | 24 |
| Building B | NA | 5 | 5 | 28 | 0 | 28 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 50%.
Building A19%
| Activity | Progress |
|---|---|
| Excavation | 50% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 50% |
| Stilt Floor | 30% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 25% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building B19%
| Activity | Progress |
|---|---|
| Excavation | 50% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 50% |
| Stilt Floor | 30% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 25% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| M/s, Block Buildtech LLP | - | North Goa |
| Mrs. Anvita Appaji Sawant | Kasai | Sindhudurg |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building B | NA | Rs 2.28 cr | - |
| Building A | NA | Rs 2.26 cr | Rs 1.06 cr |
| - | NA | Rs 29.00 lakh | - |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Gitesh Mahendrakumar Murkar |
| Architect | Gitesh Murkar |
| Engineer | Krishnraj Chavan |
| Engineer | Krishanaraj Chavan |
| Chartered Accountant | KPT & Associates LLP |
| Chartered Accountant | Sameer Kulkarni |
| Chartered Accountant | Darshan Balchandra Prabhukhanolkar |
| Partner | Role in project |
|---|---|
| M/s. Block Buildtech LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Aug 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Feb 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Mar 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed68
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect Certificate - Oct to Dec 2025.pdf | 7 May 2026 |
| Withdrawal Update Form 1File: Architect Certeficate - (Jan to March 2026).pdf | 7 May 2026 |
| Withdrawal Update Form 2File: Engineer Certificate - Oct to Dec 2025.pdf | 7 May 2026 |
| Withdrawal Update Form 2File: Engineer Certificate Jan- March 2026.pdf | 7 May 2026 |
| Withdrawal Update Form 3File: RERA CERTIFICATE Q3.pdf | 7 May 2026 |
| Withdrawal Update Form 3File: RERA CERTIFICATE Q4.pdf | 7 May 2026 |
| Withdrawal Update Form 1File: Architect Certificate - Oct to Dec 2025.pdf | 13 Feb 2026 |
| Withdrawal Update Form 2File: Engineer Certificate - Oct to Dec 2025.pdf | 13 Feb 2026 |
| Withdrawal Update Form 3File: CA REPORT ALTURA OCT TO DEC 2025.pdf | 13 Feb 2026 |
| Withdrawal Update Form 1File: Architect Certificate - Altura (July to Sep 2025).pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Engineer Certificate ( July to Sep 25).pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: RERA FORM - 3 FINAL SIGN NEW.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Altura april june25 form-1.pdf | 4 Sep 2025 |
| Withdrawal Update Form 2File: Engineer certificate Altura.pdf | 4 Sep 2025 |
| Withdrawal Update Form 3File: CA Report Altura (2).pdf | 4 Sep 2025 |
| Form 5 (FY 2024-2025)File: Form 5 Block Buildtech llp.pdf | 19 Aug 2025 |
| Form 1File: ARCHITECT CERTIFICATE - Altura(2) (1).pdf | 11 Aug 2025 |
| Form 2File: Engineer's Certificate (Building A&B) ALTURA (1).pdf | 11 Aug 2025 |
| Form 3File: CA Report Altura (1).pdf | 11 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Altura Sold inventory janto march25.pdf | 11 Aug 2025 |
| Form 1File: Architect' Certificate - Altura (1).pdf | 11 Aug 2025 |
| Form 2File: Engineer's Certificate (Building A&B).pdf | 11 Aug 2025 |
| Form 3File: CA Report Altura (2).pdf | 11 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Altura sold inventory April-June2025.pdf | 11 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - Altura(2).pdf | 26 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Report Altura.pdf | 26 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate ALTURA.pdf | 26 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: sold and booked inventory.pdf | 26 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - ALTURA (1).pdf | 17 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Report -Altura (1).pdf | 17 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate Altura.pdf | 17 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: sold inventory altura.pdf | 17 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Altura.pdf | 27 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Report Altura_compressed.pdf | 27 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate Altura.pdf | 27 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - 1st Update(1) (1).pdf | 21 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Altura.pdf | 21 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Report for Altura june.pdf | 21 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold and Booked Inventory.pdf | 21 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - 1st Update(1) (1).pdf | 21 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Report for Altura june.pdf | 21 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Altura.pdf | 21 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold and Booked Inventory.pdf | 21 Nov 2024 |
| Building plan approvalFile: APPROVED DROWING.pdf | 20 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: APPROVED DROWING.pdf | 20 Mar 2024 |
| Other - TechnicalFile: ANNEXURE ‘A.pdf | 21 Feb 2024 |
| Layout approvalFile: SITE PLAN_240207_175341 (2)_feb.pdf | 7 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: SITE PLAN_240207_175341 (2)_feb.pdf | 7 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates.pdf | 22 Sep 2023 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf | 22 Sep 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: NA order .pdf | 31 Aug 2023 |
| Declaration in FORM BFile: Form B land owners.pdf | 31 Aug 2023 |
| Declaration in FORM BFile: Form B Promotor .pdf | 31 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: No Finance Encumbrances.pdf | 17 Aug 2023 |
| Details of encumbrances concerned to LegalFile: No Finance Encumbrances.pdf | 17 Aug 2023 |
| Copy of the legal title reportFile: legal title serach report _SSA .pdf | 8 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA CERTIFICATE.pdf | 8 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organisations - Sunil.pdf | 21 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organisations - Maya.pdf | 21 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: No legal encumbrance.pdf | 20 Jul 2023 |
| Details of encumbrances concerned to LegalFile: No legal encumbrance.pdf | 20 Jul 2023 |
| CERSAI detailsFile: No CERSAI report (promoter letter head).pdf | 20 Jul 2023 |
| Proforma of Agreement for saleFile: Agreement for Sale.pdf | 20 Jul 2023 |
| Proforma of Allotment letterFile: allotment letter _final.pdf | 20 Jul 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank letter - Format A ( promotos letterhead).pdf | 20 Jul 2023 |
| Deviation Report with respect to Allotment letterFile: DEVIATION REPORT WITH RESPECT TO THE ALLOTMENT LETTER.pdf | 20 Jul 2023 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT WITH RESPECT TO THE AGREEMENT FOR SALE.pdf | 20 Jul 2023 |
| PAN CardFile: Pan Card BBLLP.pdf | 28 Jun 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sindhudurg
Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 68 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ALTURA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kasai Dodamarg530+ in Sindhudurg
Filed coordinates, straight-line distance. 9 registered projects within 2 km.
AXIS BLUES
EEJAK HOLDINGS PRIVATE LIMITED
AXIS BLUES
EEJAK HOLDINGS PRIVATE LIMITED
AXIS BLUES
EEJAK HOLDINGS PRIVATE LIMITED
AXIS LAKE CITY
GIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED
YOG ANAND
Abome Real Estate Private Limited
YOG CITY PH 1
Jayprakash Ramawadh Maurya
See every Sindhudurg project, with the district possession charts
Builder: M/s. Block Buildtech LLP
M/s. Block Buildtech LLP has 1 registration on MahaRERA, including ALTURA. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Sindhudurg district page.
Frequently asked questions
What are my rights if ALTURA is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ALTURA?
The registered promoter entity is M/s. Block Buildtech LLP, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ALTURA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ALTURA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ALTURA?
The professionals named in the filing: Architect: Gitesh Mahendrakumar Murkar; Architect: Gitesh Murkar; Engineer: Krishnraj Chavan; Engineer: Krishanaraj Chavan; Chartered Accountant: KPT & Associates LLP; Chartered Accountant: Sameer Kulkarni. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ALTURA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback