ReraGenieLog inGet a buyer report

Home / Browse projects / Sindhudurg, Maharashtra / ALTURA

Registered No litigation declared Residential / Group Housing project

ALTURA

By M/s. Block Buildtech LLP

RG-MH-06235 · RERA P52900055534 · Last updated on MahaRERA portal: 7 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 50%
42 of 52Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

ALTURA is a Residential / Group Housing project by M/s. Block Buildtech LLP in Sindhudurg, Maharashtra, registered with MahaRERA as P52900055534 on 2 Apr 2024. Possession is promised by 31 Dec 2027. 10 of the 52 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.

At a glance

Project

  • NameALTURA
  • TypeResidential / Group Housing
  • Location
    • Dodamarg Road
    • Kasai Dodamarg
    • Kasai
    • Dodamarg
    • Sindhudurg
    • 416512
  • Pincode416512
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900055534
  • ReraGenie IDRG-MH-06235

Builder

  • NameM/s. Block Buildtech LLP
  • Entity typeCompany
  • Managing DirectorSunil Kumar Verma
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Apr 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed68 files

Current status

19%10 of 52 units booked
21.9%Work done, per cost certificate

Figures as on 7 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA5524024
Building BNA5528028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 50%.

Building A19%
ActivityProgress
Excavation50%
Basement (if any)0%
Podiums (if any)0%
Plinth50%
Stilt Floor30%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building B19%
ActivityProgress
Excavation50%
Basement (if any)0%
Podiums (if any)0%
Plinth50%
Stilt Floor30%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,500 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Aug 2025
LandownerVillageDistrict
M/s, Block Buildtech LLP-North Goa
Mrs. Anvita Appaji SawantKasaiSindhudurg

Approvals and building plan

Sanctioning authorityKasai Dodamarg Nagar Panchyat
Permissible FSI2966.87
Proposed, not sanctioned2,967 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMiramar, Goa
Estimated costRs 4.83 cr
Cost incurredRs 1.06 cr
Work done21.95%
BuildingWingEstimatedIncurred
Building BNARs 2.28 cr-
Building ANARs 2.26 crRs 1.06 cr
-NARs 29.00 lakh-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGitesh Mahendrakumar Murkar
ArchitectGitesh Murkar
EngineerKrishnraj Chavan
EngineerKrishanaraj Chavan
Chartered AccountantKPT & Associates LLP
Chartered AccountantSameer Kulkarni
Chartered AccountantDarshan Balchandra Prabhukhanolkar
PartnerRole in project
M/s. Block Buildtech LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate - Oct to Dec 2025.pdf7 May 2026
Withdrawal Update Form 1File: Architect Certeficate - (Jan to March 2026).pdf7 May 2026
Withdrawal Update Form 2File: Engineer Certificate - Oct to Dec 2025.pdf7 May 2026
Withdrawal Update Form 2File: Engineer Certificate Jan- March 2026.pdf7 May 2026
Withdrawal Update Form 3File: RERA CERTIFICATE Q3.pdf7 May 2026
Withdrawal Update Form 3File: RERA CERTIFICATE Q4.pdf7 May 2026
Withdrawal Update Form 1File: Architect Certificate - Oct to Dec 2025.pdf13 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate - Oct to Dec 2025.pdf13 Feb 2026
Withdrawal Update Form 3File: CA REPORT ALTURA OCT TO DEC 2025.pdf13 Feb 2026
Withdrawal Update Form 1File: Architect Certificate - Altura (July to Sep 2025).pdf20 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate ( July to Sep 25).pdf20 Jan 2026
Withdrawal Update Form 3File: RERA FORM - 3 FINAL SIGN NEW.pdf20 Jan 2026
Withdrawal Update Form 1File: Altura april june25 form-1.pdf4 Sep 2025
Withdrawal Update Form 2File: Engineer certificate Altura.pdf4 Sep 2025
Withdrawal Update Form 3File: CA Report Altura (2).pdf4 Sep 2025
Form 5 (FY 2024-2025)File: Form 5 Block Buildtech llp.pdf19 Aug 2025
Form 1File: ARCHITECT CERTIFICATE - Altura(2) (1).pdf11 Aug 2025
Form 2File: Engineer's Certificate (Building A&B) ALTURA (1).pdf11 Aug 2025
Form 3File: CA Report Altura (1).pdf11 Aug 2025
Disclosure of Sold and Booked InventoryFile: Altura Sold inventory janto march25.pdf11 Aug 2025
Form 1File: Architect' Certificate - Altura (1).pdf11 Aug 2025
Form 2File: Engineer's Certificate (Building A&B).pdf11 Aug 2025
Form 3File: CA Report Altura (2).pdf11 Aug 2025
Disclosure of Sold and Booked InventoryFile: Altura sold inventory April-June2025.pdf11 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - Altura(2).pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Report Altura.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate ALTURA.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: sold and booked inventory.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - ALTURA (1).pdf17 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Report -Altura (1).pdf17 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate Altura.pdf17 Mar 2025
Disclosure of sold/ booked inventoryFile: sold inventory altura.pdf17 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Altura.pdf27 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Report Altura_compressed.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate Altura.pdf27 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - 1st Update(1) (1).pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Altura.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Report for Altura june.pdf21 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold and Booked Inventory.pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - 1st Update(1) (1).pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Report for Altura june.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Altura.pdf21 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold and Booked Inventory.pdf21 Nov 2024
Building plan approvalFile: APPROVED DROWING.pdf20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: APPROVED DROWING.pdf20 Mar 2024
Other - TechnicalFile: ANNEXURE ‘A.pdf21 Feb 2024
Layout approvalFile: SITE PLAN_240207_175341 (2)_feb.pdf7 Feb 2024
Copy of Layout Approval (in case of layout)File: SITE PLAN_240207_175341 (2)_feb.pdf7 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates.pdf22 Sep 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf22 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: NA order .pdf31 Aug 2023
Declaration in FORM BFile: Form B land owners.pdf31 Aug 2023
Declaration in FORM BFile: Form B Promotor .pdf31 Aug 2023
Details of encumbrances concerned to FinanceFile: No Finance Encumbrances.pdf17 Aug 2023
Details of encumbrances concerned to LegalFile: No Finance Encumbrances.pdf17 Aug 2023
Copy of the legal title reportFile: legal title serach report _SSA .pdf8 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA CERTIFICATE.pdf8 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organisations - Sunil.pdf21 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organisations - Maya.pdf21 Jul 2023
Details of encumbrances concerned to FinanceFile: No legal encumbrance.pdf20 Jul 2023
Details of encumbrances concerned to LegalFile: No legal encumbrance.pdf20 Jul 2023
CERSAI detailsFile: No CERSAI report (promoter letter head).pdf20 Jul 2023
Proforma of Agreement for saleFile: Agreement for Sale.pdf20 Jul 2023
Proforma of Allotment letterFile: allotment letter _final.pdf20 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank letter - Format A ( promotos letterhead).pdf20 Jul 2023
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT WITH RESPECT TO THE ALLOTMENT LETTER.pdf20 Jul 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT WITH RESPECT TO THE AGREEMENT FOR SALE.pdf20 Jul 2023
PAN CardFile: Pan Card BBLLP.pdf28 Jun 2023

How this compares with Sindhudurg

19%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one has not
30%of Sindhudurg registrations have lapsed or been cancelledthis one is on the register

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep ALTURA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kasai Dodamarg530+ in Sindhudurg

2 kmALTURACompleted 2Lapsed / revoked 5Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 9 registered projects within 2 km.

Builder: M/s. Block Buildtech LLP

M/s. Block Buildtech LLP has 1 registration on MahaRERA, including ALTURA. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if ALTURA is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ALTURA?

The registered promoter entity is M/s. Block Buildtech LLP, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ALTURA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ALTURA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ALTURA?

The professionals named in the filing: Architect: Gitesh Mahendrakumar Murkar; Architect: Gitesh Murkar; Engineer: Krishnraj Chavan; Engineer: Krishanaraj Chavan; Chartered Accountant: KPT & Associates LLP; Chartered Accountant: Sameer Kulkarni. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ALTURA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ALTURA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ALTURA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.