Home / Browse projects / Pune, Maharashtra / AERO EAST PH III

Completed No litigation declared Residential / Group Housing project

AERO EAST PH III

By MIRACLE GURUKRUPA DEVELOPERS

RG-MH-82618 · RERA P52100049336 · Last updated on MahaRERA portal: 25 Jul 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedregistration recorded completed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 70%
0Complaints at MahaRERAon this registration
Jump to the 104 documents Report an error

AERO EAST PH III is a Residential / Group Housing project by MIRACLE GURUKRUPA DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100049336 on 7 Feb 2023. The registration is recorded completed; possession was promised by 31 Dec 2027.

At a glance

Project

  • NameAERO EAST PH III
  • TypeResidential / Group Housing
  • Location
    • WADACHIWADI ROAD
    • UNDRI
    • Haveli
    • Pune
    • 411060
  • Pincode411060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100049336
  • ReraGenie IDRG-MH-82618

Builder

  • NameMIRACLE GURUKRUPA DEVELOPERS
  • Entity typePartnership
  • PartnersMEGHRAJ TEKCHAND KATHURIA, SUNITA MADHUKAR BANDAL, RAVINDRA DATTATRAYA PATE
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects3 →

Key dates

this monthRegisteredFeb 2023PromisedDec 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on7 Feb 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed104 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AERO EAST PH III, B WINGNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 70%.

AERO EAST PH III, B WING: 35% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed57

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots57
Open Space57

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,666 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
ANIL HARIDAS SHAH THROUGH SHRI SYSTEM DEVELOPERSPune (M Corp.)Pune
SHRI KARTIK ANIL SHAH THROUGH SYSTEM DEVELOPERSPune (M Corp.)Pune

Approvals and building plan

Permissible FSI3665.5
Proposed, not sanctioned3,666 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUNDRI CHOWK , UNDRI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAKASH KULKARNI
EngineerAshish Shirsat
Chartered AccountantSatish Aghav & Associates Chartered Accountant
PartnerRole in project
MIRACLE GURUKRUPA DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Apr 2025

Documents filed104

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: 30th June 2025 Form 1 - Architect's Certificate_001.pdf25 Jul 2025
Form 2File: 30th June 2025 Form 2 - Engineer's.pdf25 Jul 2025
Form 3File: C A Form -3, 30th June 2025.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: 30th June 2025 Sold Units details as per the new format_001.pdf25 Jul 2025
OthersFile: Form 4 - Architect Certificate (Completion).pdf25 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31th March 2025 Form 1 - Architect's Certificate.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Form -3, 31st March 2025.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31th March 2025 Form 2 - Engineer's.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: 31th March 2025 Sold Units details as per the new format.pdf23 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Final 2024-25.pdf23 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Form-5 1st April 2024 to 31st March 2025.pdf23 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificae- B Wing,.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 31th December 2024 Form 1 - Architect's Certificate.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Form -3, 31st December 2024.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 31th December 2024 Form 2 - Engineer's.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: 31th December 2024 Sold Units details as per the new format.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30th September 2024 Form 1 - Architect's Certificate.pdf20 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30th September 2024 Form 2 - Engineer's Certificate.pdf20 Nov 2024
Disclosure of sold/ booked inventoryFile: 30th September 2024 Sold Units details as per the new format.pdf20 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Form -3, 30th September 2024.pdf20 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30th September 2024 Form 1 - Architect's Certificate.pdf20 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Form -3, 30th September 2024.pdf20 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30th September 2024 Form 2 - Engineer's Certificate.pdf20 Nov 2024
Disclosure of sold/ booked inventoryFile: 30th September 2024 Sold Units details as per the new format.pdf20 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30th June 2024 Form 1 - Architect's Certificate001.pdf13 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30th March 2024 Form 2 - Engineer's Certificate001.pdf13 Jul 2024
Disclosure of sold/ booked inventoryFile: 30th June 2024 Sold Units details as per the new format001.pdf13 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Form -3, 30th June 2024.pdf13 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Form-5 1st April 2023 to 31st March 2024.pdf13 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31st March 2024 Form 2 - Engineer's Certificate 2.pdf28 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Final 2023-24.pdf28 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31st March 2024 Form 1 - Architect's Certificate.pdf15 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31st March 2024 Form 2 - Engineer's Certificate.pdf15 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Final 2023-24.pdf15 Apr 2024
Disclosure of sold/ booked inventoryFile: 31st March 2024 Sold Units details as per the new format.pdf15 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Form -3, 31st March 2024.pdf15 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Form-5 1st April 2023 to 31st March 2024.pdf15 Apr 2024
CERSAI detailsFile: New Encumbrance letter ( Boja).pdf23 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect's Certificate.pdf13 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31st December 2023 Form 2 - Engineer's Certificate.pdf13 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer's Certificate.pdf13 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022-23.pdf13 Jan 2024
Disclosure of sold/ booked inventoryFile: 31st December 2023 Sold Units.pdf13 Jan 2024
CERSAI detailsFile: Encumbrance letter ( Boja).pdf13 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Form -3 31st December 2023.pdf13 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30092023.pdf9 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30th September 2023 Form 2 -.pdf9 Oct 2023
Disclosure of sold/ booked inventoryFile: 30th September 2023 Sold Units details as per the new format.pdf9 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Form -3, 30th September 2023_compressed.pdf9 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A, Engineers Certificate, 2022-23.pdf11 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 feb23 to 31 march 2023.pdf11 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Aero East Ph III Form 3 CA Certificate 30-06-2023_compressed.pdf10 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aero East Ph III Form 3 CA Certificate 30-06-2023.pdf8 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Aero East Ph III 30-06-2023.pdf7 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Aero East Ph III 30-06-2023.pdf7 Jul 2023
Disclosure of sold/ booked inventoryFile: sold-Unsold Inventory Aero East Ph III 30-06-2023.pdf7 Jul 2023
Details of encumbrances concerned to FinanceFile: Mortgage Deed Index II.pdf2 Jun 2023
Details of encumbrances concerned to LegalFile: Mortgage Deed Index II.pdf2 Jun 2023
Copy of the legal title reportFile: New Title Search S No 53.pdf31 May 2023
Proforma of Agreement for saleFile: Revised Final Draft.pdf31 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 31-03-2023.pdf16 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate 31-03-2023.pdf16 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Engineers Certificate 2022-23.pdf16 May 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 31-03-2023.pdf16 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf16 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Annual Report.pdf16 May 2023
Proforma of Agreement for saleFile: Revised Final Draft , pate ravi miracle gurukrupa-undri (s no 53) Phase III-RERA AFS.pdf3 Feb 2023
Deviation Report with respect to model copy of AgreementFile: Revsied Deviation Sheet.pdf3 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: Declaration and Plinth certificate.pdf1 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: Architect certificate.pdf28 Jan 2023
Other - TechnicalFile: Architect certificate.pdf28 Jan 2023
Declaration about Commencement CertificateFile: Commencement Certificate in format D.pdf23 Jan 2023
Declaration about Commencement CertificateFile: Commencement Certificate consent.pdf23 Jan 2023
Layout approvalFile: 3 Copy of Layout Approval (in case of layout)-1.pdf21 Jan 2023
Copy of Layout Approval (in case of layout)File: 3 Copy of Layout Approval (in case of layout)-1.pdf21 Jan 2023
Declaration in FORM BFile: Form B Affidavit cum Declaration.pdf19 Jan 2023
Copy of the legal title reportFile: title search report as per rera compressed.pdf16 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf14 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest.pdf14 Jan 2023
Proforma of Allotment letterFile: Allotment letter as per rera Annexure 1.pdf14 Jan 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
Aero East PH IIP52100018765Undri, PuneDec 2018Certificate SignedDec 2024Jan 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AERO EAST PH III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near UNDRI13,700+ in Pune

2 kmAERO EAST PH IIICompleted 45Lapsed / revoked 25Other 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 108 registered projects within 2 km.

Builder: MIRACLE GURUKRUPA DEVELOPERS

MIRACLE GURUKRUPA DEVELOPERS has 2 registrations on MahaRERA, including AERO EAST PH III and AERO EAST - PH IV. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AERO EAST PH III is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AERO EAST PH III?

The registered promoter entity is MIRACLE GURUKRUPA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AERO EAST PH III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AERO EAST PH III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AERO EAST PH III?

The professionals named in the filing: Architect: PRAKASH KULKARNI; Engineer: Ashish Shirsat; Chartered Accountant: Satish Aghav & Associates Chartered Accountant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AERO EAST PH III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AERO EAST PH III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AERO EAST PH III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.