Home / Browse projects / Pune, Maharashtra / addressOne - Phase 6
addressOne - Phase 6
RG-MH-86293 · RERA P52100018788 · Last updated on MahaRERA portal: 20 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
- 31 complaints at MahaRERA
- Completion date moved by 24 months
- 2 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
addressOne - Phase 6 is a Residential / Group Housing project by Peninsula Land Limited in Pune, Maharashtra, registered with MahaRERA as P52100018788 on 5 Dec 2018. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 24 months from the original filing. 200 of the 200 units on this registration are recorded sold or booked, and 80 of 110 construction stages are filed complete. 31 complaints are on record with the regulator.
At a glance
Project
- NameaddressOne - Phase 6
- TypeResidential / Group Housing
- Location
- Off Mumbai Pune Expressway
- Near MCA Stadium Gahunje Pune
- Gahunje
- Mawal
- Pune
- 412101
- Pincode412101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100018788
- ReraGenie IDRG-MH-86293
Builder
- NamePeninsula Land Limited
- Entity typeCompany
- CINL17120MH1871PLC000005
- GSTIN27AAACT5173A1ZN
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Managing DirectorMahesh Gupta
- Other registrations16 more →
- Completed8 of 17
- No longer live3 lapsed, de-registered or revoked
- Past their filed date1
- Declared earlier projects12 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on5 Dec 2018
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 30 Jun 2024)
- Buildings10 building records
- Documents filed174 files
Current status
Figures as on 20 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building 66 | NA | 5 | 5 | 20 | 0 | 20 |
| Building 67 | NA | 5 | 5 | 20 | 0 | 20 |
| Building 68 | NA | 5 | 5 | 20 | 0 | 20 |
| Building 69 | NA | 5 | 5 | 20 | 0 | 20 |
| Building 70 | NA | 5 | 5 | 20 | 0 | 20 |
| Building 71 | NA | 5 | 5 | 20 | 0 | 20 |
| Building 72 | NA | 5 | 5 | 20 | 0 | 20 |
| Building 73 | NA | 5 | 5 | 20 | 0 | 20 |
| Building 77 | NA | 5 | 5 | 20 | 0 | 20 |
| Building 78 | NA | 5 | 5 | 20 | 0 | 20 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building10
As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
80 of 110 construction stages are filed complete across 10 buildings. The stage furthest along is Basement (if any), at 0%.
Building 6673%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building 6773%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building 6873%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building 6973%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building 7073%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building 7173%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building 7273%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building 7373%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building 7773%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building 7873%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed450
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| Building 66 | 46 | 46 |
| Building 67 | 46 | 46 |
| Building 68 | 46 | 46 |
| Building 69 | 46 | 46 |
| Building 70 | 46 | 46 |
| Building 71 | 46 | 46 |
| Building 72 | 46 | 46 |
| Building 73 | 46 | 46 |
| Building 77 | 41 | 41 |
| Building 78 | 41 | 41 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 3.55 cr | Rs 3.55 cr |
| Building 77 | NA | Rs 2.00 cr | Rs 2.00 cr |
| Building 78 | NA | Rs 2.00 cr | Rs 2.00 cr |
| Building 66 | NA | Rs 1.59 cr | Rs 1.59 cr |
| Building 67 | NA | Rs 1.59 cr | Rs 1.59 cr |
| Building 68 | NA | Rs 1.59 cr | Rs 1.59 cr |
| Building 69 | NA | Rs 1.59 cr | Rs 1.59 cr |
| Building 70 | NA | Rs 1.29 cr | Rs 1.29 cr |
| Building 71 | NA | Rs 1.29 cr | Rs 1.29 cr |
| Building 72 | NA | Rs 1.29 cr | Rs 1.29 cr |
| Building 73 | NA | Rs 1.29 cr | Rs 1.29 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Jagadish Deshpande |
| Architect | Mahesh D Vanja |
| Engineer | Achyut Watve |
| Engineer | J W Consultants LLP |
| Engineer | Pankaj Lingot |
| Chartered Accountant | Omprakash Kedia & Co. |
| Partner | Role in project |
|---|---|
| Peninsula Land Limited | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promotera) The said Project is a part of the larger layout/phase-wise development having phases 1-6. The original amended Environmental Clearance for larger layout including the Phase 6 was obtained on 10/01/2019. However, due to the impact of the COVID-19 pandemic, subsequent permissions for all the phases were significantly delayed. As a result, the revalidation of consent to operate permission could only be obtained in May 2022 for phase 1 to 4. Therefore, the consent to operate for the remaining phases i.e. Phase 5 and phase 6 experienced a delay. b) The Vendor- M/s Tricon Infra Buidtech Pvt. Ltd,
Reason as filed by the promoterIn Project Certificate No. P52100018788 and Extension Application No. EA10112518294 , application is filed under Section 7(3) of the MahaRERA Act, read with Order No. 40 of 2022. Please find attached herewith the Order passed by the Hon. Chairperson, MahaRERA, granting extension from 01.07.2025 to 30.06.2026, vide Order Regulatory Case No. 432 of 2025, in respect of addressOne Phase 6. The same is enclosed at Sr. No. 10 for your reference. we have uploaded the QPR upto December 2025 in the system.
Complaints filed with MahaRERA31
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000238659 | Peninsula Land Limited | Mr Prasad Sali | 07/04/2023 |
| CC005000000238661 | Peninsula Land Limited | Santosh Ramrao Jadhav | 07/04/2023 |
| CC005000000238662 | Peninsula Land Limited | Mr Krishna Sudam Sapkal | 07/04/2023 |
| CC005000000238673 | Peninsula Land Limited | Kunal Subhash Alurkar | 21/04/2023 |
| CC005000000238740 | Peninsula Land Limited | Ambarish Kumar | 21/04/2023 |
| CC005000000248782 | Peninsula Land Limited | Vikas Namdev Gaikwad | 27/04/2023 |
| CC12500180 | Chaitanya Bayas | Peninsula Land Limited | 19/01/2025 |
| CC12603493 | Ashutosh Singh | Peninsula Land Limited | 06/06/2026 |
| CC12503098 | Amol Ashok Bhadule | Peninsula Land Limited | 03/09/2025 |
| CC12503100 | Shweta Amol Bhadule | Peninsula Land Limited | 03/09/2025 |
| CC12503365 | Dnyaneshwar Vasant Maindad | Peninsula Land Limited | 21/09/2025 |
| CC12503647 | prasad balasaheb talekar | Peninsula Land Limited | 14/10/2025 |
| CC12504296 | YASHASWI SUSHESH PATEL | Peninsula Land Limited | 05/12/2025 |
| CC12601457 | madhavi mansing labade | Peninsula Land Limited | 16/03/2026 |
| CC12602150 | Rajesh Ramdev Upadhayay | Peninsula Land Limited | 11/04/2026 |
| CC12602895 | RAJESH SAMPAT RAJGURU | Peninsula Land Limited | 17/05/2026 |
| CC12602573 | Kundan Vijay Phalak | Peninsula Land Limited | 02/05/2026 |
| CC12602634 | Guruling Ravindra Choudhari | Peninsula Land Limited | 06/05/2026 |
| CC12604887 | laxman ashok dahibhate | Peninsula Land Limited | 02/08/2026 |
| CC12604897 | Khashaba Shamrao Pawar | Peninsula Land Limited | 03/08/2026 |
| CC12604892 | Prathamesh Bandekar | Peninsula Land Limited | 02/08/2026 |
| CC12604901 | Vitthal Shamrao Salunkhe | Peninsula Land Limited | 03/08/2026 |
| CC12604903 | Dhanashri Umesh Phadtare | Peninsula Land Limited | 03/08/2026 |
| CC12604919 | Akash Sitaram Jadhav | Peninsula Land Limited | 03/08/2026 |
| CC12604935 | sanket sanjay jain | Peninsula Land Limited | 04/08/2026 |
| CC12604979 | Korak David | Peninsula Land Limited | 05/08/2026 |
| CC12604956 | priyanka prasad talekar | Peninsula Land Limited | 05/08/2026 |
| CC12604973 | Anand Madhavrao Bhosage | Peninsula Land Limited | 05/08/2026 |
| CC12605073 | Rahul Nagappa Patrike | Peninsula Land Limited | 09/08/2026 |
| CC12605001 | Manoj Ganpat Yadav | Peninsula Land Limited | 06/08/2026 |
| CC12605083 | GIRISH JAYAWANTRO CHAVAN | Peninsula Land Limited | 09/08/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Dec 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Dec 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Dec 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 Dec 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed174
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 174 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Architects Certificate addressOne Phase 6 June 2026 Q1.pdf | 20 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 RERA Engg Certificate addressOne Phase 6 June 2026 Q1.pdf | 20 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3 addressOne PHASE 6 JUNE 2026 Q1.pdf | 20 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A addrressOne Phase 6 Quality Enginer Certificatemarch 2026.pdf | 1 Jul 2026 |
| Withdrawal Update Form 1File: Architects Certificate addressOne Phase 6 30092025.pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: Architects Certificate addressOne Phase 6 30092025.pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Architects Certificate Gahunje addressOne Phase 6 December 2025.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Gahunje addressOne Phase 6 March 2026.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: Engineers Certificate addressone Phase 6 30092025.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Engineering Certificate addressone phase 6 Dec 25.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate addressOne P6 March 2026.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate addressone Phase 6 30092025.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE GAHUNJE PHASE 6 31 DEC 2025.pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Architects Certificate Gahunje addressOne Phase 6 March 2026.pdf | 15 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Gahunje addressOne Phase 6 March 2026.pdf | 15 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate addressOne P6 March 2026.pdf | 15 Apr 2026 |
| Form 2A (FY 2025-2026)File: Form 2A addrressOne Phase 6 Quality Enginer Certificatemarch 2026.pdf | 13 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Architects Certificate Gahunje addressOne Phase 6 March 2026.pdf | 8 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Architects Certificate Gahunje addressOne Phase 6 March 2026.pdf | 8 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Gahunje addressOne Phase 6 March 2026.pdf | 8 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Gahunje addressOne Phase 6 March 2026.pdf | 8 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate addressOne P6 March 2026.pdf | 8 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate addressOne P6 March 2026.pdf | 8 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Architects Certificate Gahunje addressOne Phase 6 December 2025.pdf | 6 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Engineering Certificate addressone phase 6 Dec 25.pdf | 6 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE GAHUNJE PHASE 6 31 DEC 2025.pdf | 6 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Architects Certificate Gahunje addressOne Phase 6 December 2025.pdf | 23 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Engineering Certificate addressone phase 6 Dec 25.pdf | 23 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE GAHUNJE PHASE 6 31 DEC 2025.pdf | 23 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Architects Certificate Gahunje addressOne Phase 6 December 2025.pdf | 9 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Architects Certificate Gahunje addressOne Phase 6 December 2025.pdf | 9 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Engineering Certificate addressone phase 6 Dec 25.pdf | 9 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Engineering Certificate addressone phase 6 Dec 25.pdf | 9 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate addressone Phase 6 30092025.pdf | 9 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate addressone Phase 6 30092025.pdf | 9 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form 5 addresseone Phase 6 Mar 2025.pdf | 10 Dec 2025 |
| Withdrawal Update Form 1File: Architectu0027s Certificate addressOne Phase 6 30092025.pdf | 15 Oct 2025 |
| Withdrawal Update Form 2File: Engineeru0027s Certificate addressone Phase 6 30092025.pdf | 15 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 CA Certificate addressone Phase 6 30092025.pdf | 15 Oct 2025 |
| Withdrawal Update Form 1File: Architectu0027s Certificate addressOne Phase 6 30092025.pdf | 10 Oct 2025 |
| Withdrawal Update Form 2File: Engineeru0027s Certificate addressone Phase 6 30092025.pdf | 10 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3 -GAHUNJE PHASE 6 - SEP 24 03-10-2024.pdf | 10 Oct 2025 |
| Form 1File: Architect's Certificate Gahunje addressOne Phase 6 June 2025.pdf | 10 Jul 2025 |
| Form 2File: Engineer Certificate-Addressone-Phase6 June 2025.pdf | 10 Jul 2025 |
| Form 3File: FORM 3 GAHUNJE PHASE 6 June 2025.pdf | 10 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold Investory addressOne p6 June 2025.pdf | 10 Jul 2025 |
| CERSAI detailsFile: CERSAI_PLL_15042025.pdf | 15 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect's Certificate Gahunje addressOne Phase 6.pdf | 3 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate addressone phase 6 March 2025.pdf | 3 Apr 2025 |
| Form 2AFile: From 2A Quality Assurance certificate addressone phase 6 March 2025.pdf | 3 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: From 2A Quality Assurance certificate addressone phase 6 March 2025.pdf | 3 Apr 2025 |
| Certificates of CA (Form 3)File: Form 4 CA Certificate Dec 2024 addressone Phase 6.pdf | 10 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect's Certificate Gahunje Phase 6 December 2024.pdf | 6 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineering Certificate Dec 2024 addessone Phase 6.pdf | 6 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Dec 2024 addressone 6.pdf | 6 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3 -GAHUNJE PHASE 6 - SEP 24 03-10-2024 revised.pdf | 16 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect's Certificate _ Gahunje Phase 6 September 2024.pdf | 8 Oct 2024 |
| Certificates of CA (Form 3)File: FORM 3 -GAHUNJE PHASE 6 - SEP 24 03-10-2024.pdf | 8 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate _ Gahunje Phase 6 30 Sept '24.pdf | 8 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold invertory addressOne Ph6 sept 2024.pdf | 8 Oct 2024 |
| Declaration in FORM BFile: Declaration phase 6.pdf | 19 Jul 2024 |
| Declaration in FORM BFile: Form B Affidavit cum Declaration.pdf | 19 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: ADDRESSONE PHASE 6 FORM 5 M24.pdf | 16 Jul 2024 |
| Certificates of CA (Form 3)File: FORM 3 GAHUNJE PHASE 6 MAR 24.pdf | 8 Jul 2024 |
| Certificates of CA (Form 3)File: FORM 3 GAHUNJE PHASE 6 JUN 24.pdf | 8 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect's Certificate _ Gahunje Phase 6 June 2024.pdf | 2 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organization Director Pankaj Kanodia.pdf | 2 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: addressOne Ph-06 Engineer Certificate Jun'24.pdf | 1 Jul 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about Separate Bank Account addressone phase 6.pdf | 1 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organization Director Urvi Piramal.pdf | 28 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Addressone Ph06 QA Certificate March24.pdf | 27 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organization Directior Deepak Summanwar.pdf | 26 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organization Directior Mahesh Gupta.pdf | 26 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold Inventory - addressone Phase 6 june, 2024.pdf | 25 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organization Directior 1.pdf | 25 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organization Directior 2.pdf | 25 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organization Directior Pawan Swamy.pdf | 25 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organization Directior Krupal Kanakia.pdf | 25 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate form No 1 for RERA Address One Phase 6.pdf | 5 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate _ Gahunje Phase 6 March 2024.pdf | 5 Apr 2024 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| addressOne - Phase 1P52100015756 | Nr Maharashtra Cricket Association Stadium, Gahunje Pune, Pune | 254 | Mar 2018 | Completed | Dec 2022 | Dec 2022 |
| Ashok Astoria Phase I | Gat no 2 Govardhan Village Gangapur Road Nashik | 270 | - | Completed | Sep 2016 | Late, May 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 16 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 174 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep addressOne - Phase 6 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Near MCA Stadium Gahunje Pune13,700+ in Pune
Filed coordinates, straight-line distance. 102 registered projects within 2 km.
Godrej Park Greens
Godrej Skyline Developers Limited
FOREST GROVE AT GODREJ PARK GREENS
Godrej Skyline Developers Limited
Om Mangalam Samruddhi
NDG Homes LLP
PCMC EWS KIWALE
Pimpri Chinchwad Municipal Corporation
Godrej Nurture
Godrej Skyline Developers Limited
My Home Sanctuary Phase I
MAMURDI DEVELOPERS LLP
Builder: Peninsula Land Limited
Peninsula Land Limited has 17 registrations on MahaRERA, including Celestia Spaces and addressOne - Phase 1. Its filings disclose 12 earlier MahaRERA projects: declares 7 of 11 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that addressOne - Phase 6 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if addressOne - Phase 6 is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of addressOne - Phase 6?
The registered promoter entity is Peninsula Land Limited, a company as per the filing. Its CIN L17120MH1871PLC000005 and GSTIN 27AAACT5173A1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in addressOne - Phase 6?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against addressOne - Phase 6?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for addressOne - Phase 6?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at addressOne - Phase 6?
The professionals named in the filing: Architect: Jagadish Deshpande; Architect: Mahesh D Vanja; Engineer: Achyut Watve; Engineer: J W Consultants LLP; Engineer: Pankaj Lingot; Chartered Accountant: Omprakash Kedia & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in addressOne - Phase 6?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback