ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai City, Maharashtra / A.R VINTAGE

Completed No litigation declared Residential / Group Housing project

A.R VINTAGE

By A.R ASSOCIATES

RG-MH-21004 · RERA P51900007503 · Last updated on MahaRERA portal: 15 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 49 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Basement (if any), 0%
17 of 21Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 167 documents Report an error

A.R VINTAGE is a Residential / Group Housing project by A.R ASSOCIATES in Mumbai City, Maharashtra, registered with MahaRERA as P51900007503 on 17 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2026. The completion date has moved by 49 months from the original filing. 4 of the 21 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameA.R VINTAGE
  • TypeResidential / Group Housing
  • Location
    • CHEMBUR
    • Mumbai City
    • 400071
  • Pincode400071
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900007503
  • ReraGenie IDRG-MH-21004

Builder

  • NameA.R ASSOCIATES
  • Entity typePartnership
  • PartnersMOHAMMED FAISAL HAJI ABDUL RASHID ANSARI, MOHAMMED VAKIL MOHAMMED JAMIL QURESHI, MOHAMMED NADEEM MOHAMMED AQUIL QURESHI, ABDUL BASIT HAJI ABDUL RASHID ANSARI, MOHAMMED TALHA HAJI ABDUL RASHID ANSARI, AMMEEN BADSHAH RAJANI, MOHAMMED QAISER MOHAMMED ASHRAF ANSARI
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017First promiseMay 2022Revised toJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Aug 2017
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 30 May 2022)
  • Buildings1 building record
  • Documents filed167 files

Current status

19%4 of 21 units booked
100.0%Work done, per cost certificate

Figures as on 15 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A R VINTAGENA8821021

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

A R VINTAGE: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed6

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6
Closed/Covered5
Open Space1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area562 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityBRIHANMUMBAI MUNICIPAL CORPORATION
Permissible FSI1139.21
Proposed, not sanctioned1,124 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch00048 MUMBAI CENTRAL 26, HOOR VILLA , GROUND FLOOR , MARATHA MANDIR MARG MUMBAI 400008
Estimated costRs 6.59 cr
Cost incurredRs 6.59 cr
Work done100.0%
BuildingWingEstimatedIncurred
A R VINTAGENARs 5.30 crRs 5.30 cr
-NARs 1.29 crRs 1.29 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNambarch Architects & Engineers
EngineerSupcons Consultants
Chartered AccountantT B A & Associates
Chartered AccountantCA SHASHANK RAJENDRA JAIN
Chartered AccountantA P & Co
PartnerRole in project
A.R ASSOCIATES-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900024260May 2022 → Dec 2025

Reason as filed by the promoterPart OC is received upto 5 th floor

EXT51900011918May 2022 → May 2024

Reason as filed by the promoterWe, hereby apply for extension u/s 7(3) of the registered project bearing vide no: P51900007503. As prescribed under circular no: 07/2019 dated 8th Feb 2019, the consent of 51% of the allottees is enclosed herewith.

EA04022619701May 2022 → Jun 2026

Reason as filed by the promoterThe project is complete in all material respects, and we are presently awaiting the issuance of the final Occupation Certificate (OC). It is further submitted that a part Occupation Certificate upto 5 Floors has already been granted for the said project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 May 2024

Documents filed167

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 167 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 of AR Associates 31032026_Signed.pdf15 Jul 2026
Withdrawal Update Form 2File: Form 2 of AR Associates 31032026_Signed.pdf15 Jul 2026
Withdrawal Update Form 3File: Form 3 of A R Associates 30062026-compressed.pdf15 Jul 2026
Occupational CertificateFile: Part Oc.pdf12 Jun 2026
Occupational CertificateFile: Full OC.pdf12 Jun 2026
Withdrawal Update Form 1File: Form 1 of AR Associates 31032026_Signed.pdf9 Apr 2026
Withdrawal Update Form 2File: Form 2 of AR Associates 31032026_Signed.pdf9 Apr 2026
Withdrawal Update Form 3File: Form 3 of AR Associates 31032026_Signed.pdf9 Apr 2026
Form 2A (FY 2024-2025)File: Form-2A FY 2024-25.pdf10 Mar 2026
Withdrawal Update Form 1File: Form 1 of AR Associates 31122025.pdf19 Jan 2026
Withdrawal Update Form 2File: Form 2 of AR Associates 31122025.pdf19 Jan 2026
Withdrawal Update Form 3File: Form 3 of AR Associates 31122025.pdf19 Jan 2026
Withdrawal Update Form 1File: Form 1 30062025.pdf19 Oct 2025
Withdrawal Update Form 2File: Form 2 of AR Associates 30092025.pdf19 Oct 2025
Withdrawal Update Form 3File: Form 3 of AR Associates 30092025.pdf19 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 AR Associates 24-25.pdf25 Sep 2025
Form 1File: Form 1 31032025.pdf17 Jul 2025
Form 2File: Form 2 31032025.pdf17 Jul 2025
Form 3File: Form 3 31032025.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and unsold 31032025.pdf17 Jul 2025
Form 1File: Form 1 30062025.pdf17 Jul 2025
Form 2File: Form 2 30062025.pdf17 Jul 2025
Form 3File: Form 3 30062025.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and unsold 30062025.pdf17 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31032025.pdf24 Apr 2025
Certificates of CA (Form 3)File: Form 3 31032025.pdf24 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31032025.pdf24 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 31122024.pdf29 Jan 2025
Certificates of CA (Form 3)File: Form 3 Final 31122024.pdf29 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 31122024.pdf29 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 A R Associates 31032024 SIGNED.pdf15 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 30092024.pdf28 Oct 2024
Certificates of CA (Form 3)File: Form-3 30092024.pdf28 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 30092024.pdf28 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 30062024.pdf22 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 30062024.pdf22 Jul 2024
Certificates of CA (Form 3)File: Form 3 30062024.pdf22 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: REVALIDATION LETTER FROM AR.pdf10 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 23-24.pdf5 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 040724.pdf4 Jul 2024
Declaration in FORM BFile: Form B AR Associates .pdf27 May 2024
Declaration about Commencement CertificateFile: CC Declaration.pdf24 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold June-23.pdf24 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold sep-23.pdf24 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Dec-23.pdf24 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Mar-24.pdf24 May 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Oc.pdf24 May 2024
Certificates of CA (Form 3)File: Form 3 AR 31032024_compressed.pdf13 May 2024
Building plan approvalFile: IOD dated 30-04-2024.pdf11 May 2024
Layout approvalFile: Plan dated 19-03-2024.pdf11 May 2024
Building plan approvalFile: Plan dated 19-03-2024.pdf11 May 2024
Copy of Layout Approval (in case of layout)File: Plan dated 19-03-2024.pdf11 May 2024
Building Plan Approval (IOD)File: IOD dated 30-04-2024.pdf11 May 2024
Building Plan Approval (IOD)File: Plan dated 19-03-2024.pdf11 May 2024
Commencement Certificates / NA Order for plotted developmentFile: CC dated 30-04-2024.pdf11 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 AR 31032024.pdf11 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 AR 31032024.pdf11 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A FY 21-22.pdf11 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 22-23.pdf11 May 2024
Certificates of CA (Form 3)File: Form 3 AR 31032024_compressed.pdf11 May 2024
Certificates of CA (Form 3)File: Form 3 AR 31032024_compressed.pdf11 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 AR Associates 31122023.pdf18 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 AR Associates 31122023.pdf18 Jan 2024
Certificates of CA (Form 3)File: Form 3 AR Associates 31122023.pdf18 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 Final.pdf16 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Final.pdf16 Oct 2023
Certificates of CA (Form 3)File: Form-3 Final_Compressed.pdf16 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: A R ASSOCIATES - 31032023.pdf30 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 AR Associates 30062023.pdf11 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 AR Associates 30062023.pdf11 Jul 2023
Certificates of CA (Form 3)File: Form 3 AR Associates 30062023_compressed.pdf11 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 A R Associates.pdf13 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 A R Associates_compressed.pdf13 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A A R Associates.pdf13 Apr 2023
Certificates of CA (Form 3)File: Form 3 A R Associates_compressed.pdf13 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1_A R Associates_31-12-2022.pdf17 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2_A R Associates_31-12-2022.pdf17 Jan 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf17 Jan 2023
Certificates of CA (Form 3)File: Form3_A R Associates_31-12-2022_compressed.pdf17 Jan 2023
Details of encumbrances concerned to LegalFile: Encumberance concern to legal.pdf20 Oct 2022

How this compares with Mumbai City

19%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 49 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is completed

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep A.R VINTAGE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHEMBUR780+ in Mumbai City

2 kmA.R VINTAGECompleted 93Lapsed / revoked 53Other 95Dot size: filed unitsN

Filed coordinates, straight-line distance. 241 registered projects within 2 km.

Builder: A.R ASSOCIATES

A.R ASSOCIATES has 3 registrations on MahaRERA, including A.R VINTAGE and SHREE HARI NAGAR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if A.R VINTAGE is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of A.R VINTAGE?

The registered promoter entity is A.R ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in A.R VINTAGE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for A.R VINTAGE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at A.R VINTAGE?

The professionals named in the filing: Architect: Nambarch Architects & Engineers; Engineer: Supcons Consultants; Chartered Accountant: T B A & Associates; Chartered Accountant: CA SHASHANK RAJENDRA JAIN; Chartered Accountant: A P & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in A.R VINTAGE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About A.R VINTAGE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save A.R VINTAGE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.