Registered Litigation declared Others project

45 NIRVAANA HILL - C2 WING

By SINEW DEVELOPERS PRIVATE LIMITED

RG-MH-21300 · RERA P52100008687 · Last updated on MahaRERA portal: 20 Jun 2025

Source: official MahaRERA filing

Red flags

  • Litigation declared, 20 cases
  • 23 complaints at MahaRERA
  • Completion date moved by 30 months
  • 1 extension taken

Clear

  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 30 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 68%
60 of 121Units unsoldnot recorded sold or booked
23Complaints at MahaRERAon this registration
Jump to the 168 documents Report an error

45 NIRVAANA HILL - C2 WING is a Others project by SINEW DEVELOPERS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100008687 on 19 Aug 2017. Possession is promised by 30 Jun 2027. The completion date has moved by 30 months from the original filing. 61 of the 121 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 23 complaints are on record with the regulator.

At a glance

Project

  • Name45 NIRVAANA HILL - C2 WING
  • TypeOthers
  • Location
    • CTS 520
    • OPP DASBHUJA GANPATI
    • KARVE ROAD
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411004
  • Pincode411004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100008687
  • ReraGenie IDRG-MH-21300

Builder

  • NameSINEW DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects9 →

Key dates

this monthRegisteredAug 2017First promiseDec 2024Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Aug 2017
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 3 Dec 2024)
  • Buildings1 building record
  • Documents filed168 files

Current status

50%61 of 121 units booked

Figures as on 20 Jun 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C2 WINGNA362111011121

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 68%.

C2 WING: 55% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure68%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises8%
Sanitary Fittings within the flats / premises4%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks68%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.6%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities16

As on 20 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
SWIMMING POOLYes70%

Parking filed162

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots162
Closed/Covered162

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,501 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY
Permissible FSI24854.73
Proposed, not sanctioned24,855 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchA Shangrila Gardens Bund Garden Road Pune 411001

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR JAGADISH DESHPANDE
ArchitectArchitect Pundlik S Godholkar
EngineerJW CONSULTANTS LLP
Chartered AccountantABHISHEK J SHAH
PartnerRole in project
SINEW DEVELOPERS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100025388Dec 2024 → Jun 2027

Reason as filed by the promoterwe would like to inform you that the Association of customers, namely, “45 Nirvana Welfare Association” (hereinafter referred as “Association”) and certain customers had filed several complaint with Maharashtra Real Estate Regulatory Authority (MahaRERA) against the Company to takeover, recommence and construction of work of standstill project of the Company, including claiming refund and/or interest u/s 18 of RERA for the delayed delivery of flats. The Company had also filed claim against certain customers for delayed payment from their end against the demand raised by the Company. Majority m

Litigation declared20

CaseCourtStatus
2273/2012/2012CJSD PunePending
1345 of 2006/2006CJSD PuneClosed
68 / 2012/2012Court of Small Causes Judge PunePending
16 of 2013/2013Maharashtra Slum Areas IC AND R Tribunal and Special Tribunal MumbaiPending
99/2015/2015District CourtPending
5016/2005/2005High Court mumbaiPending
5017/2005/2005High Court mumbaiPending
6347 of 2013/2013High Court mumbaiClosed
61/2002/2002Charity Commissioner PunePending
45/2015/2015Charity Commissioner PuneClosed
2665/2013/2013JMFC Court PunePending
24/2013/2013PMC court puneClosed
310 of 2016/2016District Court punePending
54/2016/2016High Court mumbaiClosed
257/2016/2016Additional Commissioner Pune Division PunePending
PAMS 226 of 2017/2017Government Labour CourtPending
183 of 99/1999CJSD PuneClosed
34 of 2005/2005Wakf Tribunal AurangabadPending
CC / 13 /359/2013State CommissionPending
CC/ 316/2013/2013National CommissionClosed

Complaints filed with MahaRERA23

Case no.ComplainantRespondentFiled
CC005000000022877Satish Waman GiriKumar Sinew Developers Ltd08/04/2019
CC005000000022885SHWETLANA PRANAY GOPALESINEW DEVELOPERS PVT LTD11/04/2019
CC005000000022894Avinash TotadeLalit Kumar Kesarimal Jain Director Kumar Sinew Developers Ltd13/04/2019
CC005000000022918Satish YadnikKumar Sinew Developers Pvt Ltd19/04/2019
CC005000000022951PRAVIN NEVEKUMAR SENEW DEVELOPERS PVT LTD04/05/2019
CC005000000022956Madhuri PurandareLalit Kumar Jain25/04/2019
CC005000000022965Vishwas Baburao GaikwadKumar Snew Developers Ltd04/05/2019
CC005000000023017Deshpande Vikas DinkarraoSinew Developers Pvt Ltd26/12/2019
CC005000000023056Sunilkumar TiwariKumar Sinew Developers Ltd20/05/2019
CC005000000023133Suresh B. FatateKumar Sinew Developers Ltd.05/07/2019
CC005000000023161Niraj KotalwarSinew Developers Pvt. Lt.22/06/2019
CC005000000023191SUDHANVA JADHAVLalit Kumar Jain30/06/2019
CC005000000043659Nitin Deshmukhkumar sinew developers ltd.04/12/2019
CC005000000043799Ismail Ibrahim MominSinew Developers private limited09/01/2020
CC005000000043806Sunil Devchand GandhiKumar Sinew Developers Ltd.20/12/2019
CC005000000053850Jyoti Satish Joshi Through POA Holder Vivek Gopal JoshiKumar Sinew Developers Ltd Through Lalitkumar Kesarimal Jain04/01/2020
CC005000000053852Satish Gopal Joshi Through POA Holder Vivek Gopal JoshiKumar Sinew Developers Ltd Through Lalitkumar Kesarimal Jain04/01/2020
CC005000000075094Mrs. Kusum Marutirao KaradSINEW DEVELOPERS PRIVATE LIMITED18/01/2021
CC00500000008527145 Nirvana Welfare AssociationSINEW DEVELOPERS PVT LTD12/05/2021
CC005000000167454Rahul RodeSinew Developers Pvt Ltd25/08/2022
CC005000000218308Vasant ShitoleSinew Developers Pvt Ltd14/02/2023
SM12600333Ram GawaliSINEW DEVELOPERS PRIVATE LIMITED19/05/2026
SM12600384Ram GawaliSINEW DEVELOPERS PRIVATE LIMITED27/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jun 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed168

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 168 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA ARC Certificate_25 Apr 25_All Signed.pdf20 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC25_All Signed.pdf20 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA ARC Certificate March 2019_All Signed.pdf19 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA ARC Certificate March 2020_All Signed.pdf19 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA ARC Certificate March 2021_All Signed.pdf19 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA ARC Certificate March 2022_All Signed.pdf19 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA ARC Certificate March 2023_All Signed.pdf19 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA ARC Certificate March 2024_All Signed.pdf19 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA ARC Certificate Sep 2024.pdf19 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC nov 24_All Signed.pdf19 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC19_All Signed.pdf19 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC20_All Signed.pdf19 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC21_All Signed.pdf19 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC22_All signed.pdf19 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC23_All Signed.pdf19 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC24_All Signed.pdf19 Jun 2025
Commencement Certificates / NA Order for plotted developmentFile: Revised CC C1C2.pdf19 Jun 2025
Declaration about Commencement CertificateFile: Format D_Declaration on C_SDPL.pdf19 Jun 2025
Disclosure of sold/ booked inventoryFile: 26 Disclosure of sold_ booked inventory.pdf6 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architech Certificate March-2025.pdf17 May 2025
Certificates of CA (Form 3)File: SDPL - RERA FORM 3 MARCH-25_compressed.pdf17 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SDPL_Engineers Certificate_31-03-2025_compressed.pdf17 May 2025
Disclosure of sold/ booked inventoryFile: March 2025.pdf17 May 2025
Disclosure of sold/ booked inventoryFile: December 2024.pdf17 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2019-20.pdf18 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2020-21.pdf18 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021-22.pdf18 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022-23.pdf18 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-24.pdf18 Feb 2025
Certificates of CA (Form 3)File: Form-3 Sinew Dev March 2024_C.pdf6 Feb 2025
Certificates of CA (Form 3)File: Form-3 Sinew Dev March 2023_C.pdf6 Feb 2025
Certificates of CA (Form 3)File: Form-3 Sinew Dev March 2022_C.pdf6 Feb 2025
Certificates of CA (Form 3)File: Form-3 Sinew Dev March 2021_C.pdf6 Feb 2025
Certificates of CA (Form 3)File: Form-3 Sinew Dev March 2020_C.pdf6 Feb 2025
Certificates of CA (Form 3)File: Form-3 Sinew Dev March 2019_C.pdf6 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: SDPL Form 5 March-19 - CA Certificate_compressed.pdf6 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: SDPL Form 5 March-20 - CA Certificate_compressed.pdf6 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SDPL Form 5 March-21 - CA Certificate_compressed.pdf6 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SDPL Form 5 March-22 - CA Certificate_compressed.pdf6 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SDPL Form 5 March-23 - CA Certificate_compressed.pdf6 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SDPL Form 5 March-24 - CA Certificate_compressed.pdf6 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: SDPL Form 5 March-19 - CA Certificate.pdf1 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: SDPL Form 5 March-20 - CA Certificate.pdf1 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SDPL Form 5 March-21 - CA Certificate.pdf1 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SDPL Form 5 March-22 - CA Certificate.pdf1 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SDPL Form 5 March-23 - CA Certificate.pdf1 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SDPL Form 5 March-24 - CA Certificate.pdf1 Feb 2025
Certificates of CA (Form 3)File: Form-3 Sinew Dev March 2023.pdf4 Jan 2025
Certificates of CA (Form 3)File: Form-3 Sinew Dev Nov 2024.pdf4 Jan 2025
Certificates of CA (Form 3)File: Form-3 Sinew Dev March 2024.pdf4 Jan 2025
Certificates of CA (Form 3)File: Form-3 Sinew Dev March 2022.pdf4 Jan 2025
Certificates of CA (Form 3)File: Form-3 Sinew Dev March 2022.pdf4 Jan 2025
Certificates of CA (Form 3)File: Form-3 Sinew Dev March 2021.pdf4 Jan 2025
Certificates of CA (Form 3)File: Form-3 Sinew Dev March 2020.pdf4 Jan 2025
Certificates of CA (Form 3)File: Form-3 Sinew Dev March 2019.pdf4 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-3 Sinew Dev March 2019.pdf4 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC nov 24.pdf4 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC22.pdf4 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC24.pdf4 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC23.pdf4 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC21.pdf4 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC19.pdf4 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-3 Sinew Dev March 2022.pdf4 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-3 Sinew Dev March 2021.pdf4 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-3 Sinew Dev March 2020.pdf4 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC20.pdf4 Jan 2025
Disclosure of sold/ booked inventoryFile: SEP-2024_.pdf24 Dec 2024
Disclosure of sold/ booked inventoryFile: JAN-2024_.pdf24 Dec 2024
Disclosure of sold/ booked inventoryFile: MARCH-2024_.pdf24 Dec 2024
Disclosure of sold/ booked inventoryFile: Dec 2023_.pdf24 Dec 2024
Disclosure of sold/ booked inventoryFile: Sep 2023_.pdf24 Dec 2024
Disclosure of sold/ booked inventoryFile: Jun 2023_.pdf24 Dec 2024
Disclosure of sold/ booked inventoryFile: March 2023_.pdf24 Dec 2024
Disclosure of sold/ booked inventoryFile: DEC 2022_.pdf24 Dec 2024
Disclosure of sold/ booked inventoryFile: SEP-2020_.pdf24 Dec 2024
Disclosure of sold/ booked inventoryFile: Sep 2022_.pdf24 Dec 2024
Disclosure of sold/ booked inventoryFile: Jun 2022_.pdf24 Dec 2024
Disclosure of sold/ booked inventoryFile: March 2022_.pdf24 Dec 2024
Disclosure of sold/ booked inventoryFile: Des 2021_.pdf24 Dec 2024
Disclosure of sold/ booked inventoryFile: Jun 2021_.pdf24 Dec 2024

Promoter's earlier projects9

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise4 delivered late
ProjectLocationRegisteredStatusPromisedDelivered
KUL Utsav Phase I -Building GP52100003489kondhwa BK, PuneAug 2017CompletedJun 2023Registered original: May 2019Late, Jul 2023
KUL TULIPP51900011786Mumbai City, Mumbai CityAug 2017CompletedDec 2020Registered original: Dec 2019Late, Aug 2023
Kul Utsav Ph I E BuildingP52100007157Pune, PuneAug 2017Certificate SignedNov 2020Registered original: May 2019Apr 2018
Kul Utsav Phase I - Building DP52100007160pune, PuneAug 2017CompletedOct 2020Registered original: May 2019Apr 2018
Kul Utsav Ph 1 C buildingP52100007155Pune, PuneAug 2017CompletedOct 2020Sep 2018
Shantiniketan Phase II A4P52100006736Pune, PuneAug 2017CompletedMar 2020Registered original: Mar 2019Nov 2019
Shantiniketan Phase II A3P52100005467Pune, PuneAug 2017CompletedMar 2020Registered original: Mar 2019Nov 2019
KUL COURTP51800009338Greater Mumbai (M Corp.) (Part) (802794), Mumbai SuburbanAug 2017CompletedDec 2019Registered original: Dec 2018Late, Jan 2024
KUL Utsav Phase I -Building FP52100009849Pune, PuneAug 2017CompletedDec 2019Late, Jul 2020

How this compares with Pune

50%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 30 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 45 NIRVAANA HILL - C2 WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KARVE ROAD13,700+ in Pune

2 km45 NIRVAANA HILL - C2 WICompleted 89Lapsed / revoked 38Other 183Dot size: filed unitsN

Filed coordinates, straight-line distance. 310 registered projects within 2 km.

Builder: SINEW DEVELOPERS PRIVATE LIMITED

SINEW DEVELOPERS PRIVATE LIMITED has 2 registrations on MahaRERA, including 45 NIRVANA HILLS -C1 WING and 45 NIRVAANA HILL - C2 WING. Its filings disclose 9 earlier MahaRERA projects: declares 5 of 9 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if 45 NIRVAANA HILL - C2 WING is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 45 NIRVAANA HILL - C2 WING?

The registered promoter entity is SINEW DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 45 NIRVAANA HILL - C2 WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against 45 NIRVAANA HILL - C2 WING?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for 45 NIRVAANA HILL - C2 WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 45 NIRVAANA HILL - C2 WING?

The professionals named in the filing: Architect: AR JAGADISH DESHPANDE; Architect: Architect Pundlik S Godholkar; Engineer: JW CONSULTANTS LLP; Chartered Accountant: ABHISHEK J SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 45 NIRVAANA HILL - C2 WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 45 NIRVAANA HILL - C2 WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 45 NIRVAANA HILL - C2 WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.