VENKATESH ERANDWANE CENTRAL - BUILDING-B3 - PHASE 4
By SHREE VENKATESH BUILDCON PVT LTD
RG-MH-22671 · RERA P52100032629 · Last updated on MahaRERA portal: 8 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Possession 1 months past the filed date
- 1 complaint at MahaRERA
- Rs 150.00 crore secured on the land, in favour of INDIAN OVERSEAS BANK
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 23 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VENKATESH ERANDWANE CENTRAL - BUILDING-B3 - PHASE 4 is a Residential / Group Housing project by SHREE VENKATESH BUILDCON PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100032629 on 17 Jan 2022. Possession was promised by 30 Sep 2026 and is now 1 months past that date. 78 of the 114 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameVENKATESH ERANDWANE CENTRAL - BUILDING-B3 - PHASE 4
- TypeResidential / Group Housing
- Location
- GULAWANI MAHARAJ ROAD
- ERANDWANE
- Pune (M Corp.)
- Pune City
- Pune
- 411004
- Pincode411004
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100032629
- ReraGenie IDRG-MH-22671
Builder
- NameSHREE VENKATESH BUILDCON PVT LTD
- Entity typeCompany
- CINU45200PN2008PTC132398
- GSTIN27AANCS1902K1Z5
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Managing DirectorANKUSH BHIMRAO ASABE
- Other registrations20 more →
- Completed12 of 21
- Past their filed date2
- Declared earlier projects26 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on17 Jan 2022
- Promised completion30 Sep 2026
- Revised completionNone
- Buildings1 building record
- Documents filed229 files
Current status
Figures as on 8 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING B3 - RESIDENTIAL | NA | 34 | 29 | 114 | 0 | 114 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 8 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 98%.
BUILDING B3 - RESIDENTIAL: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 76% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 98% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 75% |
Progress on shared amenities15
As on 8 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 20% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 80% |
| Solid Waste Management And Disposal | Yes | 65% |
| Water conservation /Rain water harvesting | Yes | 80% |
| Energy managemcnt | Yes | 60% |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | Yes | 95% |
| Aggregate area of recreational Open Space | Yes | 95% |
| Open Parking | No | Not applicable |
Parking filed346
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING B3 - RESIDENTIAL | NA | Rs 104.11 cr | Rs 95.93 cr |
| - | NA | Rs 3.47 cr | Rs 2.60 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | T F CUBE DESIGN STUDIO |
| Engineer | MAHENDRA RAMPURE |
| Engineer | NIKHIL MILIND GHOLAP |
| Chartered Accountant | AVINASH JEEVAN UTGIKAR |
| Chartered Accountant | SUNILKUMAR WADHWANI |
| Partner | Role in project |
|---|---|
| SHREE VENKATESH BUILDCON PVT LTD | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12600125 | Ram Gawali | SHREE VENKATESH BUILDCON PVT LTD | 09/02/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Jan 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Nov 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Nov 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed229
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 229 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: ARCHITECT CERTIFICATE-VEC-B3-JUN-26.pdf | 8 Jul 2026 |
| Withdrawal Update Form 2File: ENGINEER CERTIFICATE-VEC-B3-JUN-26.pdf | 8 Jul 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE-VEC-B3-JUN-26.pdf | 8 Jul 2026 |
| Form 2A (FY 2025-2026)File: FORM 2A-VEC-B3-MAR-2026.pdf | 12 May 2026 |
| Withdrawal Update Form 1File: ARCH CERTIFICATE B3-VEC-MAR-2026.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: ENGG CERTIFICATE B3-VEC-MAR-2026.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE VEC-B3 PH-3-DT-22-4-2026.pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: ARCH CERTIFICATE B3-VEC-MAR-2026.pdf | 10 Apr 2026 |
| Withdrawal Update Form 2File: ENGG CERTIFICATE B3-VEC-MAR-2026.pdf | 10 Apr 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE B3-VEC-MAR-2026.pdf | 10 Apr 2026 |
| Withdrawal Update Form 1File: ARCH CERTIFICATE VEC WING B3-16-2-2026.pdf | 25 Feb 2026 |
| Withdrawal Update Form 2File: ENGG CERTIFICATE WING B3-16-2-2026.pdf | 25 Feb 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE WING B3-16-2-2026.pdf | 25 Feb 2026 |
| Withdrawal Update Form 1File: ARCH CERTIFICATE VEC-B3-DEC-25.pdf | 9 Jan 2026 |
| Withdrawal Update Form 2File: ENGG CERTIFICATE VEC-B3-DEC-25.pdf | 9 Jan 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE VEC-B3-DEC-25.pdf | 9 Jan 2026 |
| Withdrawal Update Form 1File: ARCH CERTIFICATE VEC-B3-PH-4-SEPT-25.pdf | 4 Dec 2025 |
| Withdrawal Update Form 2File: ENGG CERTIFICATE VEC-B3-PH-4-SEPT-25.pdf | 4 Dec 2025 |
| Withdrawal Update Form 3File: CA CERTIFICATE VEC-B3-01-12-25.pdf | 4 Dec 2025 |
| Form 5 (FY 2021-2022)File: FORM 5 -VEC-WING B3- PHASE -4.pdf | 24 Oct 2025 |
| Form 5 (FY 2022-2023)File: FORM 5 VEC WING B3 - PHASE -4-MAR-23.pdf | 24 Oct 2025 |
| Form 5 (FY 2024-2025)File: FORM 5- VEC-B3-15-10-2025.pdf | 15 Oct 2025 |
| Withdrawal Update Form 1File: ARCH CERTIFICATE VEC-B3-PH-4-SEPT-25.pdf | 14 Oct 2025 |
| Withdrawal Update Form 2File: ENGG CERTIFICATE VEC-B3-PH-4-SEPT-25.pdf | 14 Oct 2025 |
| Withdrawal Update Form 3File: CA CERTIFICATE VEC-B3-SEPT-25.pdf | 14 Oct 2025 |
| Withdrawal Update Form 1File: ARCH CERTIFICATE VEC-B3-PH-4-SEPT-25.pdf | 13 Oct 2025 |
| Withdrawal Update Form 2File: ENGG CERTIFICATE VEC-B3-PH-4-SEPT-25.pdf | 13 Oct 2025 |
| Withdrawal Update Form 3File: CA CERTIFICATE VEC-B3-SEPT-25.pdf | 13 Oct 2025 |
| Withdrawal Update Form 1File: ARCH CERTIFICATE VEC-B3-JUN-2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 2File: ENGG CERTIFICATE VEC-B3-JUN-2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 3File: CA CERTIFICATE VEC WING B3-JUN-25.pdf | 15 Jul 2025 |
| Form 1File: ARCH CERTIFICATE VEC WING B3-PHASE -4.pdf | 21 Jun 2025 |
| Form 2File: ENGG CERTIFICATE VEC WING B3-PHASE -4.pdf | 21 Jun 2025 |
| Form 3File: CA CERTIFICATE VEC WING B3 PHASE -4.pdf | 21 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLD INVENTORY VEC WING-B3-PHASE -4.pdf | 21 Jun 2025 |
| Form 1File: ARCH CERTIFICATE VEC-WING B3 PHASE -4.pdf | 21 Jun 2025 |
| Form 2File: ENGG CERTIFICATE VEC WING B3 PHASE -4.pdf | 21 Jun 2025 |
| Form 3File: CA CERTIFICATE VEC WING B3-PHASE -4.pdf | 21 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLD INVENTROY VEC PHASE -4 WING B3.pdf | 21 Jun 2025 |
| Form 1File: ARCH CERTIFICATE VEC PHASE -4 WING B3.pdf | 21 Jun 2025 |
| Form 2File: ENGG CERTIFICATE VEC PHASE -4 WING B3.pdf | 21 Jun 2025 |
| Form 3File: CA CERTIFICATE VEC WING B3 PHASE -4.pdf | 21 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLD INVENTORY VEC WING B3 PHASE -4.pdf | 21 Jun 2025 |
| Form 1File: ARCH CERTIFICATE VEC WING B3.pdf | 21 Jun 2025 |
| Form 2File: ENGG CERTIFICATE VEC WING B3-PHASE -4.pdf | 21 Jun 2025 |
| Form 3File: CA CERTIFICATE VEC WING B3-PHASE -4.pdf | 21 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLD INVENTORY VEC WING B3 PHASE -4.pdf | 21 Jun 2025 |
| Form 1File: ARCH CERTIFICATE VEC WING B3 PH-4.pdf | 21 Jun 2025 |
| Form 2File: ENGG CERTIFICATE VEC WING B3-PH-4.pdf | 21 Jun 2025 |
| Form 3File: CA CERTIFICATE VEC WING B3 PH-4.pdf | 21 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY VEC WING B3 PH-4.pdf | 21 Jun 2025 |
| Form 1File: ARCH CERTIFICATE VEC WING B3 PH-4.pdf | 21 Jun 2025 |
| Form 2File: ENGG CERTIFICATE VEC WING B3.pdf | 21 Jun 2025 |
| Form 3File: CA CERTIFICATE VEC WING B3 PH-4.pdf | 21 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY VEC WING B3 PH-4.pdf | 21 Jun 2025 |
| Form 1File: ARCH CERTIFICATE VEC WING B3.pdf | 21 Jun 2025 |
| Form 2File: ENGG CERTIFICATE VEC B3.pdf | 21 Jun 2025 |
| Form 3File: CA CERTIFICATE VEC WING B3.pdf | 21 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY VEC B3.pdf | 21 Jun 2025 |
| Form 1File: ARCH CERTIFICATE VEC B3.pdf | 21 Jun 2025 |
| Form 2File: ENGG CERTIFICATE VEC B3-3-10-24.pdf | 21 Jun 2025 |
| Form 3File: CA CERTIFICATE VEC B3.pdf | 21 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLD INVENTORY VEC -B3.pdf | 21 Jun 2025 |
| Form 1File: ARCH CERTIFICATE VEC WING B3 PH-4.pdf | 21 Jun 2025 |
| Form 2File: ENGG CERTIFICATE VEC WING B3 PH-4.pdf | 21 Jun 2025 |
| Form 3File: CA CERTIFICATE VEC WING B3.pdf | 21 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLD UNSOLD INVENTORY VEC WING B3.pdf | 21 Jun 2025 |
| Form 1File: ARCH CERTIFICATE VEC-B3- PH-4.pdf | 21 Jun 2025 |
| Form 2File: ENGG CERTIFICATE VEC WING B3.pdf | 21 Jun 2025 |
| Form 3File: CA CERTIFICATE VEC - B3.pdf | 21 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLND UNSOLD INVENTORY VEC WING B3.pdf | 21 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE VEC-B3- PH-4.pdf | 11 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE VEC - B3.pdf | 11 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE VEC WING B3.pdf | 11 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLND UNSOLD INVENTORY VEC WING B3.pdf | 11 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A VEC PHASE 4 WING B3-MAR-2025.pdf | 11 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A VEC PHASE 4 WING B3-DEC-2024.pdf | 11 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE VEC WING B3 PH-4.pdf | 10 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE VEC WING B3.pdf | 10 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE VEC WING B3 PH-4.pdf | 10 Jan 2025 |
Promoter's earlier projects23
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| VENKATESH GRAFFITI ELAN PHASE 2 | MUNDHWA MANJARI ROAD KESHAVNAGAR MUNDHWA PUNE 411036 | 124 | Completed | Jun 2024 | Sep 2023 |
| VENKATESH GRAFFITI ELAN PHASE 1 | Sr No 32 2B Manjiri Mundhwa Road Keshav Nagar Mundhwa PUNE 411036 | 125 | Completed | May 2024 | Sep 2023 |
| VENKATESH GRAFFITI GLOVER PHASE 3 - MHADA | MUNDHWA MANJIRI ROAD KESHAV NAGAR MUNDHWA PUNE 411036 | 60 | Completed | Sep 2023 | Aug 2023 |
| VENKATESH GRAFFITI ELITE PHASE 2 | MUNDHWA MANJARI ROAD KESHAVNAGAR MUNDHWA PUNE 411036 | 101 | Completed | Dec 2022 | Jun 2021 |
| Venkatesh Graffiti Elite Phase 1 | Sr 31 2 2B Beside Venkatesh Graffiti Open Space 1 Mundhwa Manjari Rd Keshav Nagar PUNE 411036 | 90 | Completed | Aug 2022 | Nov 2020 |
| VENKATESH GRAFFITI PHASE 6 | MUNDHWA MANJARI ROAD KESHAVNAGAR MUNDHWA PUNE 411036 | 168 | Completed | Dec 2021 | Jun 2021 |
| VENKATESH NAVITA | 101 by 7 AMBEGAON KHURD PUNE 411046 | 174 | Completed | Dec 2021 | Jun 2021 |
| VENKATESH GRAFFITI PHASE 5 | MUNDHWA MANJARI ROAD KESHAV NAGAR MUNDHWA PUNE 411036 | 104 | Completed | Mar 2021 | Feb 2020 |
| VENKATESH GRAFFITI PHASE 4 | MUNDHWA MANJARI ROAD KESHAVNAGAR MUNDHWA PUNE 411036 | 100 | Completed | Jul 2020 | Mar 2019 |
| VENKATESH JOYNEST PHASE - 5 | PUNE SOLAPUR ROAD LONI KALBHOR PUNE 412201 | 39 | Completed | Mar 2020 | Dec 2019 |
| VENKATESH JOYNEST PHASE 4 | PUNE SOLAPUR HIGHWAY LONI KALBHOR PUNE 412201 | 43 | Completed | Dec 2019 | Nov 2019 |
| VENKATESH GRAFFITI PHASE 3 | MUNDHWA MANJARI ROAD KESHAVNAGAR MUNDHWA PUNE 411036 | 64 | Completed | Dec 2019 | Oct 2018 |
| VENKATESH JOYNEST PHASE 3 | PUNE SOLAPUR ROAD LONI KALBHOR PUNE 412201 | 86 | Completed | Sep 2019 | May 2019 |
| VENKATESH LAKE ORCHID | DATTANAGAR JAMBHULWADI ROAD AMBEGAON KHURD PUNE 411046 | 127 | Completed | Dec 2018 | Dec 2018 |
| VENKATESH GRAFFITI PHASE 2 | MUNDHWA MANJARI ROAD KESHAVNAGAR MUNDHWA PUNE 411036 | 174 | Completed | Dec 2018 | Jan 2018 |
| VENKATESH LAKE LIFE PHASE 1 | Venkatesh Lake Life Road Ambegaon Kh Pune 411046 | 189 | Completed | Jun 2018 | Jun 2018 |
| Venkatesh Joynest Phase 2 | LONI KALBHOR PUNE 412201 | 43 | Completed | May 2018 | Feb 2018 |
| VENKATESH GRAFFITI PHASE 7 | KESHAVNAGAR MUNDHWA MANJARI ROAD PUNE 411036 | 28 | Completed | Mar 2018 | Jan 2018 |
| VENKATESH JOYNEST PHASE 1 | GAT NO 33 PLUS 34 2 LONI KALBHOR PUNE | 137 | Completed | Jul 2017 | Mar 2017 |
| VENKATESH GRAFFITI PHASE 1 | SR NO 31 PLUS 35 PART KESHAV NAGAR MUNDHWA PUNE 411036 | 358 | Completed | Jul 2017 | Apr 2017 |
| VENKATESH LAKE VISTA | SR NO 8 PLUS 9 PART DATTANAGAR JAMBHULWADI ROAD AMBEGAON KHURD PUNE 411046 | 672 | Completed | Dec 2015 | Feb 2015 |
| VENKATESH BILVA | S NO 51 2 2B PLUS 3 DHAYARI GOAN PUNE 411041 | 73 | Completed | Dec 2014 | Jul 2014 |
| VENKATESH SHARVIL | SR NO 26 PART DHAYARI PUNE 411041 | 186 | Completed | Mar 2014 | Jul 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 20 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 229 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep VENKATESH ERANDWANE CENTRAL - BUILDING-B3 - on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near ERANDWANE13,700+ in Pune
Filed coordinates, straight-line distance. 326 registered projects within 2 km.
VENKATESH ERANDWANE CENTRAL - BUILDING-B1 - PH
SHREE VENKATESH BUILDCON PVT LTD
One Place-F.C. Road Phase 3
PALASH REALTORS LLP
45 NIRVAANA HILL - C2 WING
SINEW DEVELOPERS PRIVATE LIMITED
VENKATESH ERANDWANE CENTRAL - BUILDING-B2 - PH
SHREE VENKATESH BUILDCON PVT LTD
One Place-F.C Road Phase 2
PALASH REALTORS LLP
VENKATESH ERANDWANE CENTRAL BUILDING A1
SHREE VENKATESH BUILDCON PVT LTD
Builder: SHREE VENKATESH BUILDCON PVT LTD
SHREE VENKATESH BUILDCON PVT LTD has 21 registrations on MahaRERA, including VENKATESH GRAFFITI PHASE 2 and VENKATESH LAKE ORCHID. Its filings disclose 26 earlier MahaRERA projects: declares 26 of 26 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if VENKATESH ERANDWANE CENTRAL - BUILDING-B3 - PHASE 4 is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VENKATESH ERANDWANE CENTRAL - BUILDING-B3 - PHASE 4?
The registered promoter entity is SHREE VENKATESH BUILDCON PVT LTD, a company as per the filing. Its CIN U45200PN2008PTC132398 and GSTIN 27AANCS1902K1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VENKATESH ERANDWANE CENTRAL - BUILDING-B3 - PHASE 4?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against VENKATESH ERANDWANE CENTRAL - BUILDING-B3 - PHASE 4?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for VENKATESH ERANDWANE CENTRAL - BUILDING-B3 - PHASE 4?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VENKATESH ERANDWANE CENTRAL - BUILDING-B3 - PHASE 4?
The professionals named in the filing: Architect: T F CUBE DESIGN STUDIO; Engineer: MAHENDRA RAMPURE; Engineer: NIKHIL MILIND GHOLAP; Chartered Accountant: AVINASH JEEVAN UTGIKAR; Chartered Accountant: SUNILKUMAR WADHWANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VENKATESH ERANDWANE CENTRAL - BUILDING-B3 - PHASE 4?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback