Home / Browse projects / Pune, Maharashtra / VENKATESH ERANDWANE CENTRAL - BUILDING-B3 - PHASE 4

Registered No litigation declared Residential / Group Housing project

VENKATESH ERANDWANE CENTRAL - BUILDING-B3 - PHASE 4

By SHREE VENKATESH BUILDCON PVT LTD

RG-MH-22671 · RERA P52100032629 · Last updated on MahaRERA portal: 8 Jul 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • 1 complaint at MahaRERA
  • Rs 150.00 crore secured on the land, in favour of INDIAN OVERSEAS BANK

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 23 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
6 of 11Construction stages donefurthest along: Staircases, 98%
36 of 114Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 229 documents Report an error

VENKATESH ERANDWANE CENTRAL - BUILDING-B3 - PHASE 4 is a Residential / Group Housing project by SHREE VENKATESH BUILDCON PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100032629 on 17 Jan 2022. Possession was promised by 30 Sep 2026 and is now 1 months past that date. 78 of the 114 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameVENKATESH ERANDWANE CENTRAL - BUILDING-B3 - PHASE 4
  • TypeResidential / Group Housing
  • Location
    • GULAWANI MAHARAJ ROAD
    • ERANDWANE
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411004
  • Pincode411004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100032629
  • ReraGenie IDRG-MH-22671

Builder

  • NameSHREE VENKATESH BUILDCON PVT LTD
  • Entity typeCompany
  • CINU45200PN2008PTC132398
  • GSTIN27AANCS1902K1Z5
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorANKUSH BHIMRAO ASABE
  • Other registrations20 more →
  • Completed12 of 21
  • Past their filed date2
  • Declared earlier projects26 →

Key dates

1 months past promisethis monthRegisteredJan 2022PromisedSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Jan 2022
  • Promised completion30 Sep 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed229 files

Current status

68%78 of 114 units booked
91.6%Work done, per cost certificate

Figures as on 8 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING B3 - RESIDENTIALNA34291140114

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 98%.

BUILDING B3 - RESIDENTIAL: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises76%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 8 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes90%
Street LightingYes20%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes65%
Water conservation /Rain water harvestingYes80%
Energy managemcntYes60%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceYes95%
Open ParkingNoNot applicable

Parking filed346

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots346
Closed/Covered346

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,991 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofINDIAN OVERSEAS BANK
Secured amountRs 150.00 crore
Declared on23 Jun 2025

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI19602.06
Proposed, not sanctioned19,602 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 7, WONDER LAND, MAHATMA GANDHI ROAD, CANTONMENT, PUNE - 411001
Estimated costRs 107.58 cr
Cost incurredRs 98.53 cr
Work done91.58%
BuildingWingEstimatedIncurred
BUILDING B3 - RESIDENTIALNARs 104.11 crRs 95.93 cr
-NARs 3.47 crRs 2.60 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectT F CUBE DESIGN STUDIO
EngineerMAHENDRA RAMPURE
EngineerNIKHIL MILIND GHOLAP
Chartered AccountantAVINASH JEEVAN UTGIKAR
Chartered AccountantSUNILKUMAR WADHWANI
PartnerRole in project
SHREE VENKATESH BUILDCON PVT LTD-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600125Ram GawaliSHREE VENKATESH BUILDCON PVT LTD09/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed229

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 229 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE-VEC-B3-JUN-26.pdf8 Jul 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE-VEC-B3-JUN-26.pdf8 Jul 2026
Withdrawal Update Form 3File: CA CERTIFICATE-VEC-B3-JUN-26.pdf8 Jul 2026
Form 2A (FY 2025-2026)File: FORM 2A-VEC-B3-MAR-2026.pdf12 May 2026
Withdrawal Update Form 1File: ARCH CERTIFICATE B3-VEC-MAR-2026.pdf24 Apr 2026
Withdrawal Update Form 2File: ENGG CERTIFICATE B3-VEC-MAR-2026.pdf24 Apr 2026
Withdrawal Update Form 3File: CA CERTIFICATE VEC-B3 PH-3-DT-22-4-2026.pdf24 Apr 2026
Withdrawal Update Form 1File: ARCH CERTIFICATE B3-VEC-MAR-2026.pdf10 Apr 2026
Withdrawal Update Form 2File: ENGG CERTIFICATE B3-VEC-MAR-2026.pdf10 Apr 2026
Withdrawal Update Form 3File: CA CERTIFICATE B3-VEC-MAR-2026.pdf10 Apr 2026
Withdrawal Update Form 1File: ARCH CERTIFICATE VEC WING B3-16-2-2026.pdf25 Feb 2026
Withdrawal Update Form 2File: ENGG CERTIFICATE WING B3-16-2-2026.pdf25 Feb 2026
Withdrawal Update Form 3File: CA CERTIFICATE WING B3-16-2-2026.pdf25 Feb 2026
Withdrawal Update Form 1File: ARCH CERTIFICATE VEC-B3-DEC-25.pdf9 Jan 2026
Withdrawal Update Form 2File: ENGG CERTIFICATE VEC-B3-DEC-25.pdf9 Jan 2026
Withdrawal Update Form 3File: CA CERTIFICATE VEC-B3-DEC-25.pdf9 Jan 2026
Withdrawal Update Form 1File: ARCH CERTIFICATE VEC-B3-PH-4-SEPT-25.pdf4 Dec 2025
Withdrawal Update Form 2File: ENGG CERTIFICATE VEC-B3-PH-4-SEPT-25.pdf4 Dec 2025
Withdrawal Update Form 3File: CA CERTIFICATE VEC-B3-01-12-25.pdf4 Dec 2025
Form 5 (FY 2021-2022)File: FORM 5 -VEC-WING B3- PHASE -4.pdf24 Oct 2025
Form 5 (FY 2022-2023)File: FORM 5 VEC WING B3 - PHASE -4-MAR-23.pdf24 Oct 2025
Form 5 (FY 2024-2025)File: FORM 5- VEC-B3-15-10-2025.pdf15 Oct 2025
Withdrawal Update Form 1File: ARCH CERTIFICATE VEC-B3-PH-4-SEPT-25.pdf14 Oct 2025
Withdrawal Update Form 2File: ENGG CERTIFICATE VEC-B3-PH-4-SEPT-25.pdf14 Oct 2025
Withdrawal Update Form 3File: CA CERTIFICATE VEC-B3-SEPT-25.pdf14 Oct 2025
Withdrawal Update Form 1File: ARCH CERTIFICATE VEC-B3-PH-4-SEPT-25.pdf13 Oct 2025
Withdrawal Update Form 2File: ENGG CERTIFICATE VEC-B3-PH-4-SEPT-25.pdf13 Oct 2025
Withdrawal Update Form 3File: CA CERTIFICATE VEC-B3-SEPT-25.pdf13 Oct 2025
Withdrawal Update Form 1File: ARCH CERTIFICATE VEC-B3-JUN-2025.pdf15 Jul 2025
Withdrawal Update Form 2File: ENGG CERTIFICATE VEC-B3-JUN-2025.pdf15 Jul 2025
Withdrawal Update Form 3File: CA CERTIFICATE VEC WING B3-JUN-25.pdf15 Jul 2025
Form 1File: ARCH CERTIFICATE VEC WING B3-PHASE -4.pdf21 Jun 2025
Form 2File: ENGG CERTIFICATE VEC WING B3-PHASE -4.pdf21 Jun 2025
Form 3File: CA CERTIFICATE VEC WING B3 PHASE -4.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLD INVENTORY VEC WING-B3-PHASE -4.pdf21 Jun 2025
Form 1File: ARCH CERTIFICATE VEC-WING B3 PHASE -4.pdf21 Jun 2025
Form 2File: ENGG CERTIFICATE VEC WING B3 PHASE -4.pdf21 Jun 2025
Form 3File: CA CERTIFICATE VEC WING B3-PHASE -4.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLD INVENTROY VEC PHASE -4 WING B3.pdf21 Jun 2025
Form 1File: ARCH CERTIFICATE VEC PHASE -4 WING B3.pdf21 Jun 2025
Form 2File: ENGG CERTIFICATE VEC PHASE -4 WING B3.pdf21 Jun 2025
Form 3File: CA CERTIFICATE VEC WING B3 PHASE -4.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLD INVENTORY VEC WING B3 PHASE -4.pdf21 Jun 2025
Form 1File: ARCH CERTIFICATE VEC WING B3.pdf21 Jun 2025
Form 2File: ENGG CERTIFICATE VEC WING B3-PHASE -4.pdf21 Jun 2025
Form 3File: CA CERTIFICATE VEC WING B3-PHASE -4.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLD INVENTORY VEC WING B3 PHASE -4.pdf21 Jun 2025
Form 1File: ARCH CERTIFICATE VEC WING B3 PH-4.pdf21 Jun 2025
Form 2File: ENGG CERTIFICATE VEC WING B3-PH-4.pdf21 Jun 2025
Form 3File: CA CERTIFICATE VEC WING B3 PH-4.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY VEC WING B3 PH-4.pdf21 Jun 2025
Form 1File: ARCH CERTIFICATE VEC WING B3 PH-4.pdf21 Jun 2025
Form 2File: ENGG CERTIFICATE VEC WING B3.pdf21 Jun 2025
Form 3File: CA CERTIFICATE VEC WING B3 PH-4.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY VEC WING B3 PH-4.pdf21 Jun 2025
Form 1File: ARCH CERTIFICATE VEC WING B3.pdf21 Jun 2025
Form 2File: ENGG CERTIFICATE VEC B3.pdf21 Jun 2025
Form 3File: CA CERTIFICATE VEC WING B3.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY VEC B3.pdf21 Jun 2025
Form 1File: ARCH CERTIFICATE VEC B3.pdf21 Jun 2025
Form 2File: ENGG CERTIFICATE VEC B3-3-10-24.pdf21 Jun 2025
Form 3File: CA CERTIFICATE VEC B3.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLD INVENTORY VEC -B3.pdf21 Jun 2025
Form 1File: ARCH CERTIFICATE VEC WING B3 PH-4.pdf21 Jun 2025
Form 2File: ENGG CERTIFICATE VEC WING B3 PH-4.pdf21 Jun 2025
Form 3File: CA CERTIFICATE VEC WING B3.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLD UNSOLD INVENTORY VEC WING B3.pdf21 Jun 2025
Form 1File: ARCH CERTIFICATE VEC-B3- PH-4.pdf21 Jun 2025
Form 2File: ENGG CERTIFICATE VEC WING B3.pdf21 Jun 2025
Form 3File: CA CERTIFICATE VEC - B3.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLND UNSOLD INVENTORY VEC WING B3.pdf21 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE VEC-B3- PH-4.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE VEC - B3.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE VEC WING B3.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLND UNSOLD INVENTORY VEC WING B3.pdf11 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A VEC PHASE 4 WING B3-MAR-2025.pdf11 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A VEC PHASE 4 WING B3-DEC-2024.pdf11 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE VEC WING B3 PH-4.pdf10 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE VEC WING B3.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE VEC WING B3 PH-4.pdf10 Jan 2025

Promoter's earlier projects23

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

23 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
VENKATESH GRAFFITI ELAN PHASE 2MUNDHWA MANJARI ROAD KESHAVNAGAR MUNDHWA PUNE 411036124CompletedJun 2024Sep 2023
VENKATESH GRAFFITI ELAN PHASE 1Sr No 32 2B Manjiri Mundhwa Road Keshav Nagar Mundhwa PUNE 411036125CompletedMay 2024Sep 2023
VENKATESH GRAFFITI GLOVER PHASE 3 - MHADAMUNDHWA MANJIRI ROAD KESHAV NAGAR MUNDHWA PUNE 41103660CompletedSep 2023Aug 2023
VENKATESH GRAFFITI ELITE PHASE 2MUNDHWA MANJARI ROAD KESHAVNAGAR MUNDHWA PUNE 411036101CompletedDec 2022Jun 2021
Venkatesh Graffiti Elite Phase 1Sr 31 2 2B Beside Venkatesh Graffiti Open Space 1 Mundhwa Manjari Rd Keshav Nagar PUNE 41103690CompletedAug 2022Nov 2020
VENKATESH GRAFFITI PHASE 6MUNDHWA MANJARI ROAD KESHAVNAGAR MUNDHWA PUNE 411036168CompletedDec 2021Jun 2021
VENKATESH NAVITA101 by 7 AMBEGAON KHURD PUNE 411046174CompletedDec 2021Jun 2021
VENKATESH GRAFFITI PHASE 5MUNDHWA MANJARI ROAD KESHAV NAGAR MUNDHWA PUNE 411036104CompletedMar 2021Feb 2020
VENKATESH GRAFFITI PHASE 4MUNDHWA MANJARI ROAD KESHAVNAGAR MUNDHWA PUNE 411036100CompletedJul 2020Mar 2019
VENKATESH JOYNEST PHASE - 5PUNE SOLAPUR ROAD LONI KALBHOR PUNE 41220139CompletedMar 2020Dec 2019
VENKATESH JOYNEST PHASE 4PUNE SOLAPUR HIGHWAY LONI KALBHOR PUNE 41220143CompletedDec 2019Nov 2019
VENKATESH GRAFFITI PHASE 3MUNDHWA MANJARI ROAD KESHAVNAGAR MUNDHWA PUNE 41103664CompletedDec 2019Oct 2018
VENKATESH JOYNEST PHASE 3PUNE SOLAPUR ROAD LONI KALBHOR PUNE 41220186CompletedSep 2019May 2019
VENKATESH LAKE ORCHIDDATTANAGAR JAMBHULWADI ROAD AMBEGAON KHURD PUNE 411046127CompletedDec 2018Dec 2018
VENKATESH GRAFFITI PHASE 2MUNDHWA MANJARI ROAD KESHAVNAGAR MUNDHWA PUNE 411036174CompletedDec 2018Jan 2018
VENKATESH LAKE LIFE PHASE 1Venkatesh Lake Life Road Ambegaon Kh Pune 411046189CompletedJun 2018Jun 2018
Venkatesh Joynest Phase 2LONI KALBHOR PUNE 41220143CompletedMay 2018Feb 2018
VENKATESH GRAFFITI PHASE 7KESHAVNAGAR MUNDHWA MANJARI ROAD PUNE 41103628CompletedMar 2018Jan 2018
VENKATESH JOYNEST PHASE 1GAT NO 33 PLUS 34 2 LONI KALBHOR PUNE137CompletedJul 2017Mar 2017
VENKATESH GRAFFITI PHASE 1SR NO 31 PLUS 35 PART KESHAV NAGAR MUNDHWA PUNE 411036358CompletedJul 2017Apr 2017
VENKATESH LAKE VISTASR NO 8 PLUS 9 PART DATTANAGAR JAMBHULWADI ROAD AMBEGAON KHURD PUNE 411046672CompletedDec 2015Feb 2015
VENKATESH BILVAS NO 51 2 2B PLUS 3 DHAYARI GOAN PUNE 41104173CompletedDec 2014Jul 2014
VENKATESH SHARVILSR NO 26 PART DHAYARI PUNE 411041186CompletedMar 2014Jul 2013

How this compares with Pune

68%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VENKATESH ERANDWANE CENTRAL - BUILDING-B3 - on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ERANDWANE13,700+ in Pune

2 kmVENKATESH ERANDWANE CENTCompleted 94Lapsed / revoked 46Other 186Dot size: filed unitsN

Filed coordinates, straight-line distance. 326 registered projects within 2 km.

Builder: SHREE VENKATESH BUILDCON PVT LTD

SHREE VENKATESH BUILDCON PVT LTD has 21 registrations on MahaRERA, including VENKATESH GRAFFITI PHASE 2 and VENKATESH LAKE ORCHID. Its filings disclose 26 earlier MahaRERA projects: declares 26 of 26 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VENKATESH ERANDWANE CENTRAL - BUILDING-B3 - PHASE 4 is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VENKATESH ERANDWANE CENTRAL - BUILDING-B3 - PHASE 4?

The registered promoter entity is SHREE VENKATESH BUILDCON PVT LTD, a company as per the filing. Its CIN U45200PN2008PTC132398 and GSTIN 27AANCS1902K1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VENKATESH ERANDWANE CENTRAL - BUILDING-B3 - PHASE 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VENKATESH ERANDWANE CENTRAL - BUILDING-B3 - PHASE 4?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VENKATESH ERANDWANE CENTRAL - BUILDING-B3 - PHASE 4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VENKATESH ERANDWANE CENTRAL - BUILDING-B3 - PHASE 4?

The professionals named in the filing: Architect: T F CUBE DESIGN STUDIO; Engineer: MAHENDRA RAMPURE; Engineer: NIKHIL MILIND GHOLAP; Chartered Accountant: AVINASH JEEVAN UTGIKAR; Chartered Accountant: SUNILKUMAR WADHWANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VENKATESH ERANDWANE CENTRAL - BUILDING-B3 - PHASE 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VENKATESH ERANDWANE CENTRAL - BUILDING-B3 - PHASE 4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VENKATESH ERANDWANE CENTRAL - BUILDING-B3 - to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.