Home / Browse projects / Mumbai Suburban, Maharashtra / ZYNERGY

Registration lapsed No litigation declared Others project

ZYNERGY

By MAA ASHAPURA DEVELOPERS

RG-MH-25241 · RERA P51800007546 · Last updated on MahaRERA portal: 21 Nov 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 23 months past the filed date
  • 2 complaints at MahaRERA
  • Completion date moved by 11 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Nov 2024Possession promised23 months past this date
0 of 11Construction stages donefurthest along: Excavation, 75%
2Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

ZYNERGY is a Others project by MAA ASHAPURA DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800007546 on 17 Aug 2017. Possession was promised by 20 Nov 2024 and is now 23 months past that date. The completion date has moved by 11 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameZYNERGY
  • TypeOthers
  • Location
    • Lal Dongar Road
    • Lal Dongar
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800007546
  • ReraGenie IDRG-MH-25241

Builder

  • NameMAA ASHAPURA DEVELOPERS
  • Entity typePartnership
  • PartnersBHAVIK LAHERIKANT BHADRA, HIMMAT SUNDARJI BHADRA

Key dates

23 months past promisethis monthRegisteredAug 2017First promiseDec 2023Revised toNov 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on17 Aug 2017
  • Promised completion20 Nov 2024
  • Revised completionRevised to 20 Nov 2024 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed93 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ZYNERGY - F, G AND H WINGNA210000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 75%.

ZYNERGY - F, G AND H WING: 30% average across the applicable activities

ActivityProgress
Excavation75%
Basement (if any)75%
Podiums (if any)0%
Plinth75%
Stilt Floor75%
Slabs of Super Structure24%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed181

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots181
Closed/Covered181

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,394 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI17730.01
Proposed, not sanctioned8,791 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMIG Colony Bandra East

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRajendra Ulhas Pagnis
EngineerMr. Niranjan Pandya
PartnerRole in project
MAA ASHAPURA DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800018082Dec 2023 → Nov 2024

Reason as filed by the promoterDue to Covid Pandemic the Construction work was stopped for a long while. we are on verge of Completion of Project kindly grant us Extension.

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000193613Mr. Chaganty Vara Prasad Rao and Mrs. Chaganty Leela MeherMaa Ashapura Developers07/08/2020
CC006000000333808Neelam Swapnil BaneM/s Maaa Ashapura Developers02/01/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Nov 2024

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC__Zynergy.pdf21 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC__Zynergy.pdf21 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A RERA FY 2019-20 Q2.pdf27 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A RERA FY 2019-20 Q3.pdf27 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A RERA FY 2019-20 Q4.pdf27 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A RERA FY 2020-21 Q2.pdf27 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A RERA FY 2020-21 Q1.pdf27 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A RERA FY 2020-21 Q3.pdf27 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A RERA FY 2020-21 Q4.pdf27 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A RERA FY 2020-21 Q1.pdf27 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A RERA FY 2021-22 Q1.pdf27 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A RERA FY 2021-22 Q2.pdf27 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A RERA FY 2021-22 Q3.pdf27 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A RERA FY 2022-23 Q2.pdf27 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A RERA FY 2022-23 Q2.pdf27 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A RERA FY 2022-23 Q3.pdf27 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A RERA FY 2022-23 Q4.pdf27 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A RERA FY 2023-21 Q1.pdf27 Dec 2023
Declaration in FORM BFile: Form B.pdf26 Dec 2023
Disclosure of sold/ booked inventoryFile: RERA Sold - Unsold_231226_142733.pdf26 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1_D_31-03-23_Annexure A Architect Certificate (1).pdf1 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1_D_30-06-23_Annexure A Architect Certificate (1).pdf1 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1_D_30-09-23_Annexure A Architect Certificate (1)_compressed.pdf1 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Annexure B -31-03-2023.pdf1 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Annexure C - 31-032023.pdf1 Dec 2023
Certificates of CA (Form 3)File: Form 3 RERA CA Certificate FY 2018-19 Q4_compressed.pdf1 Dec 2023
Certificates of CA (Form 3)File: Form 3 RERA CA Certificate FY 2019-20 Q1_compressed.pdf1 Dec 2023
Certificates of CA (Form 3)File: Form 3 RERA CA Certificate FY 2019-20 Q2_compressed.pdf1 Dec 2023
Certificates of CA (Form 3)File: Form 3 RERA CA Certificate FY 2019-20 Q3_compressed.pdf1 Dec 2023
Certificates of CA (Form 3)File: Form 3 RERA CA Certificate FY 2019-20 Q4_compressed.pdf1 Dec 2023
Certificates of CA (Form 3)File: Form 3 RERA CA Certificate FY 2020-21 Q1_compressed.pdf1 Dec 2023
Certificates of CA (Form 3)File: Form 3 RERA CA Certificate FY 2020-21 Q2_compressed.pdf1 Dec 2023
Certificates of CA (Form 3)File: Form 3 RERA CA Certificate FY 2020-21 Q4_compressed.pdf1 Dec 2023
Certificates of CA (Form 3)File: Form 3 RERA CA Certificate FY 2020-21 Q4_compressed.pdf1 Dec 2023
Certificates of CA (Form 3)File: Form 3 RERA CA Certificate FY 2021-22 Q1_compressed.pdf1 Dec 2023
Certificates of CA (Form 3)File: Form 3 RERA CA Certificate FY 2021-22 Q3_compressed.pdf1 Dec 2023
Certificates of CA (Form 3)File: Form 3 RERA CA Certificate FY 2021-22 Q3_compressed.pdf1 Dec 2023
Certificates of CA (Form 3)File: Form 3 RERA CA Certificate FY 2021-22 Q4_compressed.pdf1 Dec 2023
Certificates of CA (Form 3)File: Form 3 RERA CA Certificate FY 2022-23 Q1_compressed.pdf1 Dec 2023
Certificates of CA (Form 3)File: Form 3 RERA CA Certificate FY 2022-23 Q2_compressed.pdf1 Dec 2023
Certificates of CA (Form 3)File: Form 3 RERA CA Certificate FY 2022-23 Q3_compressed.pdf1 Dec 2023
Certificates of CA (Form 3)File: Form 3 RERA CA Certificate FY 2022-23 Q4_compressed.pdf1 Dec 2023
Certificates of CA (Form 3)File: Form 3 RERA CA Certificate FY 2023-24 Q1_compressed.pdf1 Dec 2023
Certificates of CA (Form 3)File: Form 3 RERA CA Certificate FY 2023-24 Q2_compressed.pdf1 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 RERA CA Certificate FY 2018-19.pdf1 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 RERA CA Certificate FY 2019-20.pdf1 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 RERA CA Certificate FY 2020-21.pdf1 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 RERA CA Certificate FY 2021-22.pdf1 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 RERA CA Certificate FY 2022-23.pdf1 Dec 2023
Details of encumbrancesFile: Encumberance Declaration.pdf25 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Annexure A Architect certificate.pdf11 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31122022.pdf11 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 31122022.pdf11 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf7 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Form 2.pdf7 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: RERA Form 2A.pdf7 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1 Annexure A Architect Certificate.pdf30 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Annexure B.pdf30 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30092021 FORM1 Annexure A Architect Certificate.pdf11 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 28022022 FORM1 Annexure A Architect Certificate.pdf11 Apr 2022
Building plan approvalFile: APPROVED IOA.pdf5 Apr 2022
Building plan approvalFile: AMENDED IOA.PDF5 Apr 2022
Building Plan Approval (IOD)File: AMENDED IOA.PDF5 Apr 2022
Building Plan Approval (IOD)File: APPROVED IOA.pdf5 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: AMENDED CC.pdf5 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Annexure B.PDF5 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Annexure C EC 21.PDF5 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Annexure C21.PDF5 Apr 2022
Details of Restarting of Construction work post lockdownFile: REVISED LOI.pdf5 Apr 2022
OtherFile: CIVIL AVIATION NOC.pdf5 Apr 2022
Declaration about Commencement CertificateFile: Format - D - eclaration about Commencement Certificate.PDF30 Mar 2022
Proforma of Allotment letterFile: Agreement For Sale_Zynergy.pdf30 Mar 2022
Certificates of CA (Form 5)File: Form 5 for uploading.pdf12 Dec 2018
Details of encumbrancesFile: To Whomsoever it may Concern.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 BINDER.pdf29 Jul 2017
Certificates of CA (Form 3)File: Form 3.pdf29 Jul 2017
Proforma of Allotment letterFile: AGGREMENT DISCLOSER.pdf29 Jul 2017
OtherFile: zynergy rera letter and proposed ioa application.pdf29 Jul 2017
OtherFile: zynergy Certificate of Stabililty.pdf29 Jul 2017
OtherFile: Zenergy proposed sale IOA 1.pdf29 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 11 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ZYNERGY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Lal Dongar6,700+ in Mumbai Suburban

2 kmZYNERGYCompleted 139Lapsed / revoked 99Other 147Dot size: filed unitsN

Filed coordinates, straight-line distance. 385 registered projects within 2 km.

Builder: MAA ASHAPURA DEVELOPERS

MAA ASHAPURA DEVELOPERS has 1 registration on MahaRERA, including ZYNERGY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that ZYNERGY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ZYNERGY is delayed beyond 20 Nov 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ZYNERGY?

The registered promoter entity is MAA ASHAPURA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ZYNERGY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ZYNERGY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ZYNERGY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ZYNERGY?

The professionals named in the filing: Architect: Rajendra Ulhas Pagnis; Engineer: Mr. Niranjan Pandya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ZYNERGY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ZYNERGY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ZYNERGY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.