ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / ZENITH

Registered No litigation declared Others project

ZENITH

By AMBAR ICON LLP

RG-MH-78158 · RERA P52100047472 · Last updated on MahaRERA portal: 24 Jun 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
8 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 0%
27 of 53Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

ZENITH is a Others project by AMBAR ICON LLP in Pune, Maharashtra, registered with MahaRERA as P52100047472 on 2 Nov 2022. Possession is promised by 31 Dec 2026. 26 of the 53 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameZENITH
  • TypeOthers
  • Location
    • VIMAN NAGAR
    • LOHGAON
    • Haveli
    • Pune
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100047472
  • ReraGenie IDRG-MH-78158

Builder

  • NameAMBAR ICON LLP
  • Entity typePartnership
  • PartnersSOURABH JEETENDRA DHENDE, ROHAN JEETENDRA DHENDE, JEETENDRA YESHWANT DHENDE

Key dates

this monthRegisteredNov 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Nov 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed84 files

Current status

49%26 of 53 units booked
139.9%Work done, per cost certificate

Figures as on 24 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ZENITHNA161344953

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 0%.

ZENITH: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed258

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots258
Closed/Covered258

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,162 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
SALMA AKBAR PATELVIMANNAGARPune
JAYANT KUMAR BOSEVIMANNAGARPune
AMBAR ICON LLPLahagaonPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation.Building Control Department
Permissible FSI8786.08
Proposed, not sanctioned8,786 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPENINSULABUSINESS PARKTOWER BLOWER PARELMUMBAI
Estimated costRs 33.13 cr
Cost incurredRs 46.34 cr
Work done139.88%
BuildingWingEstimatedIncurred
ZENITHNARs 30.10 crRs 40.05 cr
-NARs 3.03 crRs 6.30 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnkur Associates
EngineerJ. W. Consultants LLP
EngineerVijay Gade
Chartered Accountantdevesh navsalkar
Chartered AccountantSKGB AND CO LLP
PartnerRole in project
AMBAR ICON LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12400855Mr Pritesh Chandrakant MuthiyanAMBAR ICON LLP22/11/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: FY 25-26.pdf24 Jun 2026
Withdrawal Update Form 1File: Architect Certificate - Q2 Sep 25 FY 25-26.pdf8 Jun 2026
Withdrawal Update Form 1File: Architect Certificate Form 1 - Q3 FY 25-26.pdf8 Jun 2026
Withdrawal Update Form 1File: Architect Certificate Form 1 - Q4 FY 25-26.pdf8 Jun 2026
Withdrawal Update Form 2File: Engineer Cert F Y 2025-26 - Q2.pdf8 Jun 2026
Withdrawal Update Form 2File: Engineer Cert F Y 2025-26 - Q3.pdf8 Jun 2026
Withdrawal Update Form 2File: Engineer Cert F Y 2025-26 - Q4.pdf8 Jun 2026
Withdrawal Update Form 3File: FORM 3 CA Certificate 30092025.pdf8 Jun 2026
Withdrawal Update Form 3File: FORM 3 CA Certificate 31122025.pdf8 Jun 2026
Withdrawal Update Form 3File: FORM 3 CA Certificate 31032026.pdf8 Jun 2026
Form 1File: FORM 1 Architect Cert Q3 F Y 2024-25.pdf9 Oct 2025
Form 2File: FORM 2 Engineer Cert Q3 F Y 2024-25.pdf9 Oct 2025
Form 3File: FORM 3 CA Certificate 31122024.pdf9 Oct 2025
Disclosure of Sold and Booked InventoryFile: Self Declaration Sold Unsold 31122024.pdf9 Oct 2025
Form 1File: FORM 1 Ankur Associates.pdf9 Oct 2025
Form 2File: FORM 2 Engineer Cert.pdf9 Oct 2025
Form 3File: FORM 3 CA Certificate 31032025.pdf9 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sel Declaration Sold Unsold 31032025.pdf9 Oct 2025
Form 1File: FORM 1Architect Certificate.pdf9 Oct 2025
Form 2File: FORM 2 Engineer Certificate.pdf9 Oct 2025
Form 3File: FORM 3 CA Certificate 30062025.pdf9 Oct 2025
Disclosure of Sold and Booked InventoryFile: Self Declaration Sold Unsold 30062025.pdf9 Oct 2025
Deviation Report with respect to model copy of AgreementFile: Deviation Letter.pdf21 Dec 2024
Layout approvalFile: Basement 1 2 Floor Plan.pdf19 Dec 2024
Layout approvalFile: Ground Mezza 9 Floor Plan.pdf19 Dec 2024
Layout approvalFile: 1st 2nd Floor Plan.pdf19 Dec 2024
Layout approvalFile: 3rd to 11th Floor Plan.pdf19 Dec 2024
Layout approvalFile: Twelth (Recreational) Floor Plan.pdf19 Dec 2024
Layout approvalFile: Elevation Section A HPSC0267.pdf19 Dec 2024
Copy of Layout Approval (in case of layout)File: Basement 1 2 Floor Plan.pdf19 Dec 2024
Copy of Layout Approval (in case of layout)File: Ground Mezza 9 Floor Plan.pdf19 Dec 2024
Copy of Layout Approval (in case of layout)File: 1st 2nd Floor Plan.pdf19 Dec 2024
Copy of Layout Approval (in case of layout)File: 3rd to 11th Floor Plan.pdf19 Dec 2024
Copy of Layout Approval (in case of layout)File: Twelth (Recreational) Floor Plan.pdf19 Dec 2024
Copy of Layout Approval (in case of layout)File: Elevation Section A HPSC0267.pdf19 Dec 2024
Proforma of Agreement for saleFile: Agreement Draft.pdf19 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf5 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf11 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Ankur Associates.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Vijay Gade.pdf12 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form No 2A.pdf12 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form No 2A.pdf12 Aug 2024
Layout approvalFile: LAYOUT PLAN_compressed.pdf13 Jul 2024
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN_compressed.pdf13 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate - Revised 2024.pdf13 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca Certificate Form 3.pdf13 Jul 2024
Details of encumbrances concerned to FinanceFile: Declaration.pdf12 Apr 2024
Details of encumbrances concerned to LegalFile: Declaration.pdf12 Apr 2024
Proforma of Agreement for saleFile: Agreement.pdf12 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Cert - Form 5.pdf6 Mar 2024
Layout approvalFile: 1-5.pdf28 Sep 2023
Building plan approvalFile: 2-5.pdf28 Sep 2023
Building plan approvalFile: 3-5.pdf28 Sep 2023
Building plan approvalFile: 4-5.pdf28 Sep 2023
Building plan approvalFile: 5-5.pdf28 Sep 2023
Copy of Layout Approval (in case of layout)File: 1-5.pdf28 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 2-5.pdf28 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 3-5.pdf28 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 4-5.pdf28 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 5-5.pdf28 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: C C.pdf28 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 230109135651_0001.pdf9 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf10 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA 21102022.pdf10 Oct 2022
Proforma of Agreement for saleFile: Allotment letter draft.pdf10 Oct 2022
Proforma of Allotment letterFile: Allotment letter draft.pdf10 Oct 2022
Layout approvalFile: DP Layout Amalgamation_compressed.pdf7 Oct 2022
Copy of Layout Approval (in case of layout)File: DP Layout Amalgamation_compressed.pdf7 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate-5-8.pdf7 Oct 2022
Declaration about Commencement CertificateFile: Form D.pdf7 Oct 2022
Declaration in FORM BFile: Form B - Ambar ICON.pdf7 Oct 2022
CERSAI detailsFile: Cersai Decleration.pdf7 Oct 2022
Proforma of Allotment letterFile: Revised flat agreement copy.pdf7 Oct 2022
Proforma of Agreement for saleFile: Revised flat agreement copy.pdf7 Oct 2022
Deviation Report with respect to Allotment letterFile: No Deviation Allotment letter.pdf7 Oct 2022
Deviation Report with respect to model copy of AgreementFile: No Deviation Agreement to sale.pdf7 Oct 2022
Building plan approvalFile: ilovepdf_merged_compressed.pdf4 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: ilovepdf_merged_compressed.pdf4 Oct 2022
Copy of the legal title reportFile: ilovepdf_merged.pdf3 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf3 Oct 2022

How this compares with Pune

49%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ZENITH on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VIMAN NAGAR13,700+ in Pune

2 kmZENITHCompleted 26Lapsed / revoked 12Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 57 registered projects within 2 km.

Builder: AMBAR ICON LLP

AMBAR ICON LLP has 1 registration on MahaRERA, including ZENITH. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ZENITH is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ZENITH?

The registered promoter entity is AMBAR ICON LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ZENITH?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ZENITH?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ZENITH?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ZENITH?

The professionals named in the filing: Architect: Ankur Associates; Engineer: J. W. Consultants LLP; Engineer: Vijay Gade; Chartered Accountant: devesh navsalkar; Chartered Accountant: SKGB AND CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ZENITH?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ZENITH. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ZENITH to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.