Home / Browse projects / Thane, Maharashtra / Yug Heights

Registered No litigation declared Residential / Group Housing project

Yug Heights

By M/s R. S. Constructions

RG-MH-73576 · RERA P51700014553 · Last updated on MahaRERA portal: 3 Dec 2024

Source: official MahaRERA filing

Red flags

  • 39 complaints at MahaRERA
  • Completion date moved by 36 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 36 months from the original
5 of 11Construction stages donefurthest along: Internal walls, 70%
39Complaints at MahaRERAon this registration
Jump to the 140 documents Report an error

Yug Heights is a Residential / Group Housing project by M/s R. S. Constructions in Thane, Maharashtra, registered with MahaRERA as P51700014553 on 12 Dec 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 39 complaints are on record with the regulator.

At a glance

Project

  • NameYug Heights
  • TypeResidential / Group Housing
  • Location
    • Village Sangarli
    • Thane
    • Thane (M Corp.)
    • 421204
  • Pincode421204
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700014553
  • ReraGenie IDRG-MH-73576

Builder

  • NameM/s R. S. Constructions
  • Entity typePartnership
  • GSTIN27AARFR8166K1ZA
  • PartnersArvind Ramswarup Anand, Vaibhav Anand

Key dates

this monthRegisteredDec 2017First promiseDec 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Dec 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 5 Dec 2023)
  • Buildings1 building record
  • Documents filed140 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Yug HeightsNA190000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 70%.

Yug Heights: 62% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises46%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.48%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.8%

Progress on shared amenities15

As on 3 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed68

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots68
Closed/Covered68

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,740 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI17967.11
Proposed, not sanctioned7,431 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAngruti Plot No 14 Sector 24, Sion Panvel Road, Turbhe - Vashi

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSopan Prabhu architects and Planners
EngineerCSE Consultants Consulting Engineers
EngineerMangesh Amdoskar
Chartered AccountantKapure & Kapure Chartered Accountants
Chartered AccountantVaibhav Kamble
PartnerRole in project
M/s R. S. Constructions-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700017553Dec 2023 → Dec 2024

Reason as filed by the promoterAs per the attachment

EXT51700025347Dec 2023 → Dec 2026

Reason as filed by the promoterThis extension application was scheduled for hearing on 15/12/2025. The Hon Chairperson, MahaRERA, has allowed the extension application and granted extension till 31.12.2026 vide order dated 30/12/2025. The said order is attached in sr. no. 7 for your reference. Please take the order on your record and process the extension application.

Complaints filed with MahaRERA39

Case no.ComplainantRespondentFiled
CC006000000591518Faizal Manzoor KhanVaibhav Arvind Anand and Arvind Ramswarup Anand14/08/2024
CC006000000479954Ramkumar VenkatkrishnanR.S. Constructions13/08/2024
CC006000000591370Chandrakant Rajaram ShindeM/S. R S CONSTRUCTIONS14/08/2024
CC006000000591438Sameer Bharat PansareM/S R S Constructions11/08/2024
CC12400172Pushparaj Chinraj GounderM/s R. S. Constructions21/09/2024
CC12400112Rajednra Anandrao ManeMS R S CONSTRUCTIONS15/09/2024
CC12400160Dharam Dinesh SagarM/s R. S. Constructions20/09/2024
CC12400114Bikesh Kumar PandeyM/s R. S. Constructions15/09/2024
CC12400115Subodh SinghM/s R. S. Constructions15/09/2024
CC12400116Mahendra Sadashiv GosaviM/s R. S. Constructions15/09/2024
CC12400162Ketan Vasant JethvaM/s R. S. Constructions20/09/2024
CC12400155Vikas Yashwant WajeM/s R. S. Constructions19/09/2024
CC12401177Vishal Ramchandra TelavaneM/s R. S. Constructions19/12/2024
CC12400165Vivek Rajendra DumbreM/s R. S. Constructions20/09/2024
CC12400176Nilesh Nandaram RokadeM/s R. S. Constructions21/09/2024
CC12400184Rupesh Ramesh PawarM/s R. S. Constructions22/09/2024
CC12400179BALIRAM EKNATH KATKADEM/s R. S. Constructions21/09/2024
CC12500155Surendra Nandkumar RomanM/s R. S. Constructions17/01/2025
CC12401271Bhavini R MandaviyaM/s R. S. Constructions29/12/2024
CC12500082Shriprakash G DubeyM/s R. S. Constructions08/01/2025
CC12500059Farid Kamal DaveM/s R. S. Constructions07/01/2025
CC12500136Atique Ahamed Mohammed KembhaviM/s R. S. Constructions15/01/2025
CC12500078Saurabh Sunil AmbekarM/s R. S. Constructions08/01/2025
CC12500151Harishchandra Khandu GunjalM/s R. S. Constructions16/01/2025
CC12500152Nitin Gangaram NavaleM/s R. S. Constructions16/01/2025
CC12500153Sangamesh Laxmanarao GhorpadeM/s R. S. Constructions16/01/2025
CC12500161Sachin Krishna AjagekarM/s R. S. Constructions18/01/2025
CC12500361Eknath Raosaheb PatilM/s R. S. Constructions03/02/2025
CC12500882Tapas Banbehari ManaM/s R. S. Constructions13/03/2025
CC12500490jitendra hariram lahoriM/s R. S. Constructions13/02/2025
CC12501111Megha Sharadh SanyashiM/s R. S. Constructions02/04/2025
CC12500802Navin Kumar YadavM/s R. S. Constructions09/03/2025
CC12500921Rohan Krishnanandan PanditM/s R. S. Constructions16/03/2025
CC12602720SACHIN KALURAM GOPALEM/s R. S. Constructions10/05/2026
CC12501158Udaykumar Champaklal DesaiM/s R. S. Constructions07/04/2025
CC12504569Rohan Balu MatreM/s R. S. Constructions22/12/2025
CC12502770Kiran Arjun PatilM/s R. S. Constructions07/08/2025
CC12502856Caesar minguel DsouzaM/s R. S. Constructions14/08/2025
CC12504709Rajkumar Ramdavar PalM/s R. S. Constructions31/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Dec 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Dec 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed140

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 140 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: Form B.pdf3 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 ( Dec 23).pdf3 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 ( march 24).pdf3 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 ( June 24).pdf3 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 ( Sept 24) 001.pdf3 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 June.pdf5 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf5 Nov 2024
Certificates of CA (Form 3)File: FORM 3 ( JUNE 23).pdf5 Nov 2024
Certificates of CA (Form 3)File: FORM 3 ( SEPT 23).pdf5 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ( JUNE 23).pdf5 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ( SEPT 23).pdf5 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A 2023.pdf12 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2 A 2024.pdf12 Jun 2024
Details of encumbrancesFile: Encumbrance Declaration.pdf17 Apr 2024
Declaration in FORM BFile: Form B.pdf11 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1 Architect Certificate.pdf25 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 Mar 2023.pdf25 Jul 2023
Disclosure of sold/ booked inventoryFile: Diclosure of Sold_Booked Inventory Yug Heights March 2023.pdf25 Jul 2023
Certificates of CA (Form 3)File: form 3 March 2023 signed copy.pdf25 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Jun 22.pdf14 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sep 22.pdf14 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep 22.pdf14 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jun 22.pdf14 Nov 2022
Certificates of CA (Form 3)File: Form 3 Jun 22.pdf14 Nov 2022
Certificates of CA (Form 3)File: Form 3 Sep 22.pdf14 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A (2022).pdf14 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1 Jun 18.pdf12 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 Sep 18.pdf12 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 Dec 18.pdf12 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Mar 19.pdf12 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form -1 Jun 19.pdf12 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form -1 Jun 19.pdf12 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 Sep 19.pdf12 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dec 19.pdf12 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 MAar 19.pdf12 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Jun 20.pdf12 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sep 20.pdf12 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dec 20.pdf12 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 21.pdf12 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Jun 21.pdf12 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sep 21.pdf12 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dec 21.pdf12 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Mar 22.pdf12 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Jun 21.pdf12 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sep 21.pdf12 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 18.pdf12 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep 18.pdf12 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 18.pdf12 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Mar 19.pdf12 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Jun 19.pdf12 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Jun 19.pdf12 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Sep 19.pdf12 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Dec 19.pdf12 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Mar 20.pdf12 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Jun 20.pdf12 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Sep 20.pdf12 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Dec 20.pdf12 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Jun 21.pdf12 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Sep 21.pdf12 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - dec 21.pdf12 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Mar 22.pdf12 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2 - Mar 21.pdf12 Oct 2022
Certificates of CA (Form 3)File: FORM 3 JUNE 18 1.pdf12 Oct 2022
Certificates of CA (Form 3)File: FORM 3 JUNE 18 2.pdf12 Oct 2022
Certificates of CA (Form 3)File: FORM 3 SEPT 18-1.pdf12 Oct 2022
Certificates of CA (Form 3)File: FORM 3 SEPT 18-2.pdf12 Oct 2022
Certificates of CA (Form 3)File: FORM 3 DEC 18-1-5_compressed.pdf12 Oct 2022
Certificates of CA (Form 3)File: FORM 3 DEC 18-6-10_compressed.pdf12 Oct 2022
Certificates of CA (Form 3)File: FORM 3 MARCH 19-1-5_compressed.pdf12 Oct 2022
Certificates of CA (Form 3)File: FORM 3 MARCH 19-6-10_compressed.pdf12 Oct 2022
Certificates of CA (Form 3)File: FORM 3 JUNE 19-1-5_compressed.pdf12 Oct 2022
Certificates of CA (Form 3)File: FORM 3 JUNE 19-6-10_compressed.pdf12 Oct 2022
Certificates of CA (Form 3)File: FORM 3 JUNE 19-1-5_compressed.pdf12 Oct 2022
Certificates of CA (Form 3)File: FORM 3 JUNE 19-6-10_compressed.pdf12 Oct 2022
Certificates of CA (Form 3)File: FORM 3 SEPT 19-1-5_compressed.pdf12 Oct 2022
Certificates of CA (Form 3)File: FORM 3 SEPT 19-6-10_compressed.pdf12 Oct 2022
Certificates of CA (Form 3)File: FORM 3 DEC 19-1-5_compressed.pdf12 Oct 2022
Certificates of CA (Form 3)File: FORM 3 DEC 19-6-10_compressed.pdf12 Oct 2022
Certificates of CA (Form 3)File: FORM 3 MARCH 20-1-5_compressed.pdf12 Oct 2022
Certificates of CA (Form 3)File: FORM 3 MARCH 20-6-10_compressed.pdf12 Oct 2022

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 36 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Yug Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Thane7,600+ in Thane

2 kmYug HeightsCompleted 31Lapsed / revoked 9Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 69 registered projects within 2 km.

Builder: M/s R. S. Constructions

M/s R. S. Constructions has 1 registration on MahaRERA, including Yug Heights. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Yug Heights is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Yug Heights?

The registered promoter entity is M/s R. S. Constructions, a partnership as per the filing. Its GSTIN 27AARFR8166K1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Yug Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Yug Heights?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Yug Heights?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Yug Heights?

The professionals named in the filing: Architect: Sopan Prabhu architects and Planners; Engineer: CSE Consultants Consulting Engineers; Engineer: Mangesh Amdoskar; Chartered Accountant: Kapure & Kapure Chartered Accountants; Chartered Accountant: Vaibhav Kamble. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Yug Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Yug Heights. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Yug Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.