Home / Browse projects / Yashwin Orizzonte - Phase I

Completed No litigation declared Others project

Yashwin Orizzonte - Phase I

By VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP

RG-MH-16550 · RERA P52100026213 · Last updated on MahaRERA portal: 15 Oct 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: .
Jun 2024Possession promisedregistration recorded completed
15 of 22Construction stages doneacross 2 buildings; furthest along: Installation of Lifts, 95%
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

Yashwin Orizzonte - Phase I is a Others project by VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP in Opposite Panchashil Tower, 411014, registered with MahaRERA as P52100026213 on 30 Aug 2020. The registration is recorded completed; possession was promised by 30 Jun 2024.

At a glance

Project

  • NameYashwin Orizzonte - Phase I
  • TypeOthers
  • Location
    • Kharadi - Wagholi Street
    • Opposite Panchashil Tower
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100026213
  • ReraGenie IDRG-MH-16550

Builder

  • NameVILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
  • Entity typePartnership
  • GSTIN27AASFG4227B1ZH
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerAditya Vilas Javdekar
  • Other registrations4 more →
  • Completed4 of 5

Key dates

this monthRegisteredAug 2020PromisedJun 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on30 Aug 2020
  • Promised completion30 Jun 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed98 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA250000
Building B with Shops and Shops under Building CNA250000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 15 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 95%.

Building A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)10%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Building B with Shops and Shops under Building C89%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)10%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 15 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes20%
Street LightingYes40%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes60%
Energy managemcntYes40%
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes75%
Open ParkingYes40%

Parking filed143

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots143
Closed/Covered143
BuildingClosed/CoveredTotal
Building A88
Building B with Shops and Shops under Building C135135

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,575 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
B.S DevelopersPune (M Corp.)Pune
Ravindra Bapusaheb Pathare-Pune

Approvals and building plan

Permissible FSI26881.25
Proposed, not sanctioned26,881 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPimpri Branch, Pune

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSameer Murari Valimbe
ArchitectNinad Kulkarni
ArchitectAnuja Joshi
ArchitectShrutika Hadimani
ArchitectKunal Navale
EngineerSarvesh Javdekar
Chartered AccountantAbhijit Mundada
Chartered AccountantSupriya Abhijit Mundada
PartnerRole in project
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Aug 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Apr 2024

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 7_Form 5 VJ Yashwin Orizzonte -phase 1_signed.pdf15 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4_YO Phase 1_revised_2.pdf17 Jul 2024
Other - TechnicalFile: Layout for ph-1 OC_compressed.pdf26 Jun 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: YO A Society Registration Cretificate.pdf29 May 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: YO B Society Registration Cretificate.pdf29 May 2024
Other - TechnicalFile: OC Declaration_YO Ph-1_signed.pdf21 May 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: CC 0987 dated 29122023_revised_compressed.pdf11 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A and B Building Completion Certificate.pdf23 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A and B Building Completion Certificate.pdf23 Jan 2024
OtherFile: YO I.pdf20 Oct 2023
Layout approvalFile: 01_compressed.pdf19 Oct 2023
Building plan approvalFile: 06_compressed.pdf19 Oct 2023
Building plan approvalFile: 07_compressed.pdf19 Oct 2023
Building plan approvalFile: 08_compressed.pdf19 Oct 2023
Building plan approvalFile: 10_compressed.pdf19 Oct 2023
Building plan approvalFile: 11_compressed.pdf19 Oct 2023
Building plan approvalFile: 12_compressed.pdf19 Oct 2023
Copy of Layout Approval (in case of layout)File: 01_compressed.pdf19 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 06_compressed.pdf19 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 07_compressed.pdf19 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 08_compressed.pdf19 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 10_compressed.pdf19 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 11_compressed.pdf19 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 12_compressed.pdf19 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf19 Oct 2023
Declaration about Commencement CertificateFile: YO Phase 1_CC declaration_signed.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_YO Ph-1_signed.pdf11 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA- Yashwin Orrizonte ph 1_compressed.pdf11 Oct 2023
Disclosure of sold/ booked inventoryFile: YO 1_compressed.pdf9 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_YO Ph 1_Sept 2023_signed.pdf7 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: VJGDLLP RERA NUMBER P52100026213_YO1.pdf16 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_YO Phase-1.pdf19 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_YO Phase-1_compressed.pdf18 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: YO_PHASE_1_june23.pdf12 Jul 2023
OtherFile: YO1.pdf12 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER_YO_1.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_YO_1_compressed.pdf20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QA_YO_1.pdf15 Apr 2023
Disclosure of sold/ booked inventoryFile: YO_1_compressed.pdf14 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR_YO1.pdf8 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Yashwin Orizzonte Phase-1.pdf25 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert_YO Phase-1.pdf17 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_YO Phase-1_compressed.pdf17 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ArYOPh1_311222.pdf16 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng_Cert_YO Ph1 Sep22.pdf6 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Yashwin Orizzonte p1_compressed.pdf24 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_Orizzonte Ph I_Sept 2022.pdf24 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Yashwin Orizzonte Phase-1.pdf3 Oct 2022
Disclosure of sold/ booked inventoryFile: SI_ORIZZONTE PH 1_JUNE 2022_compressed.pdf10 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH_ORIZZONTE PH1_JUNE 2022.pdf1 Aug 2022
Details of encumbrancesFile: Revised encumb YO_P1 and CERSAI 291121.pdf14 Dec 2021
CERSAI detailsFile: Revised encumb YO_P1 and CERSAI 291121.pdf14 Dec 2021
OtherFile: YO P1 QPR Sep21.pdf14 Dec 2021
Disclosure of sold/ booked inventoryFile: Orizzonte Ph I_Inventory_Sept 2021_compressed.pdf14 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A Yashwin Orizzonte - Phase 1 Sept 21.pdf9 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: VJGSD_Yashwin Orizzonte_Form 5_2020-2021.pdf30 Sep 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Orizzonte_Phase I_Society Formation.pdf25 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Orizzonte_June2021_compressed.pdf31 Jul 2021
Disclosure of sold/ booked inventoryFile: Yashwin Orizzonte_compressed.pdf1 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Yashwin Orizzonte_March 2021.pdf13 Apr 2021
Layout approvalFile: 01_compressed.pdf9 Feb 2021
Building plan approvalFile: A building_1st floor_compressed.pdf9 Feb 2021
Building plan approvalFile: A building typical and 2nd floor_compressed.pdf9 Feb 2021
Building plan approvalFile: A building_refuge_compressed.pdf9 Feb 2021
Building plan approvalFile: B building_1st floor_compressed.pdf9 Feb 2021
Building plan approvalFile: B Building_Typical and refuge_compressed.pdf9 Feb 2021
Copy of Layout Approval (in case of layout)File: 01_compressed.pdf9 Feb 2021
Building Plan Approval / NA Order for plotted developmentFile: A building_1st floor_compressed.pdf9 Feb 2021
Building Plan Approval / NA Order for plotted developmentFile: A building typical and 2nd floor_compressed.pdf9 Feb 2021
Building Plan Approval / NA Order for plotted developmentFile: A building_refuge_compressed.pdf9 Feb 2021
Building Plan Approval / NA Order for plotted developmentFile: B building_1st floor_compressed.pdf9 Feb 2021
Building Plan Approval / NA Order for plotted developmentFile: B Building_Typical and refuge_compressed.pdf9 Feb 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: YO_Dec 20200001.pdf5 Feb 2021
Layout approvalFile: Yashwin Orizzonte_Revised Sanction_02022021.pdf2 Feb 2021
Copy of Layout Approval (in case of layout)File: Yashwin Orizzonte_Revised Sanction_02022021.pdf2 Feb 2021
Commencement Certificates / NA Order for plotted developmentFile: CC_revised.pdf2 Feb 2021
Proforma of Allotment letterFile: Revised ATS - Yashwin Orizzonte_02022021.pdf2 Feb 2021
OtherFile: DECLARATION_REVISED_YO_02022021.pdf2 Feb 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: YO Phase I_Sept 2020_compressed.pdf8 Oct 2020
Proforma of Allotment letterFile: ats- orizontte.pdf10 Sep 2020

Keep Yashwin Orizzonte - Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Opposite Panchashil Tower

2 kmYashwin Orizzonte - PhasCompleted 27Lapsed / revoked 12Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 50 registered projects within 2 km.

Builder: VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP

VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP has 5 registrations on MahaRERA, including Yashwin Orizzonte - Phase I and VJ IndiLife. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if Yashwin Orizzonte - Phase I is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Yashwin Orizzonte - Phase I?

The registered promoter entity is VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP, a partnership as per the filing. Its GSTIN 27AASFG4227B1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Yashwin Orizzonte - Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Yashwin Orizzonte - Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Yashwin Orizzonte - Phase I?

The professionals named in the filing: Architect: Sameer Murari Valimbe; Architect: Ninad Kulkarni; Architect: Anuja Joshi; Architect: Shrutika Hadimani; Architect: Kunal Navale; Engineer: Sarvesh Javdekar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Yashwin Orizzonte - Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Yashwin Orizzonte - Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Yashwin Orizzonte - Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.