Home / Browse projects / Pune, Maharashtra / YASHADA DREAMSONG

Registered No litigation declared Residential / Group Housing project

YASHADA DREAMSONG

By YASHADA VIVANTA REALTY PVT. LTD.

RG-MH-19121 · RERA P52100078168 · Last updated on MahaRERA portal: 18 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
2 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 80%
256 of 314Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

YASHADA DREAMSONG is a Residential / Group Housing project by YASHADA VIVANTA REALTY PVT. LTD. in Pune, Maharashtra, registered with MahaRERA as P52100078168 on 25 Nov 2024. Possession is promised by 31 Dec 2029. 58 of the 314 units on this registration are recorded sold or booked, and 2 of 33 construction stages are filed complete.

At a glance

Project

  • NameYASHADA DREAMSONG
  • TypeResidential / Group Housing
  • Location
    • NEAR LITTLE EARTH KOLTE PATIL
    • MAMURDI
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100078168
  • ReraGenie IDRG-MH-19121

Builder

  • NameYASHADA VIVANTA REALTY PVT. LTD.
  • Entity typeCompany
  • DirectorsSURYAKANT TUKARAM JADHAV, VIJAY KHANDU KATE
  • Managing DirectorVASANT KHANDU KATE

Key dates

this monthRegisteredNov 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Nov 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed87 files

Current status

18%58 of 314 units booked
29.4%Work done, per cost certificate

Figures as on 18 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C BUILDINGNA191766066
B BUILDINGNA16141660166
A BUILDINGNA161482082

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 80%.

C BUILDING13%
ActivityProgress
Excavation100%
Basement (if any)30%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B BUILDING12%
ActivityProgress
Excavation100%
Basement (if any)30%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure5%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A BUILDING8%
ActivityProgress
Excavation80%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure5%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes30%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes10%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed514

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots514
Closed/Covered440
Open Space74
BuildingClosed/CoveredOpen SpaceTotal
C BUILDING10026126
B BUILDING20530235
A BUILDING13518153

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,800 sq m
Land owned byNot the promoter
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Jun 2025
LandownerVillageDistrict
KATE VASANT KHANDUPimpale SaudagarPune
SRI SRI DEVELOPERSPimpri Chinchawad (M Corp.)Pune
Manisha Sudam Pardesi-Thane
Sudam Amarsingh Pardesi-Thane

Approvals and building plan

Sanctioning authorityPCMC
Permissible FSI32151.99
Proposed, not sanctioned32,152 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS.NO.10 BY 213,JACHAK CHEMBERS,NEAR SAI VAIBHAV,PIMPLE SAUDAGAR,DISTPUNE411027
Estimated costRs 46.27 cr
Cost incurredRs 13.62 cr
Work done29.44%
BuildingWingEstimatedIncurred
B BUILDINGNARs 15.88 crRs 4.05 cr
A BUILDINGNARs 15.78 crRs 1.45 cr
-NARs 8.33 crRs 6.03 cr
C BUILDINGNARs 6.27 crRs 2.09 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVILAS JAGGANATH YELE VILAS YELE
ArchitectVILAS JAGGANATH YELE
EngineerHIRALAL BHASKAR SONAWANE BHASKAR SONAWANE
EngineerHIRALAL BHASKAR SONAWANE
Chartered AccountantShalini Baheti BAHETI
Chartered AccountantS GAUTAM & ASSOCIATES LLP
Chartered AccountantSHALINI BAHETI
Chartered AccountantNIKHIL R INANI
Chartered AccountantPAILWAN & COMPANY
PartnerRole in project
YASHADA VIVANTA REALTY PVT. LTD.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Mar 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Dreamsong Form 1 March 2026.PDF18 Apr 2026
Withdrawal Update Form 2File: Dreamsong Form 2 March 2026.PDF18 Apr 2026
Withdrawal Update Form 3File: Yashada Dreamsong - Form 3.PDF18 Apr 2026
Form 2A (FY 2025-2026)File: Dreamsong Form 2A March 2026.PDF18 Apr 2026
Form 2A (FY 2024-2025)File: Dreamsong Form 2A 31 march 2025.PDF26 Mar 2026
Layout approvalFile: 1 LAYOUT.pdf23 Mar 2026
Building plan approvalFile: 2-5.pdf23 Mar 2026
Building plan approvalFile: 6-9.pdf23 Mar 2026
Building plan approvalFile: 10-15.pdf23 Mar 2026
Building plan approvalFile: PLAN NO - 02 Parking Plan.pdf23 Mar 2026
Withdrawal Update Form 1File: Yashada Dreamsong-Form 1 Dec 2025.PDF19 Jan 2026
Withdrawal Update Form 2File: Yashada Dreamsong-Form 2 Dec 2025.PDF19 Jan 2026
Withdrawal Update Form 3File: Yashada Dreamsong -Form 3-Dec 2025.PDF19 Jan 2026
Form 5 (FY 2024-2025)File: Form-5 Dreamsong 24-25.PDF3 Jan 2026
Withdrawal Update Form 1File: YD-Form1-Sep 2025_16102025131243.PDF17 Oct 2025
Withdrawal Update Form 1File: YD-Form1-Sep 2025_16102025131243.PDF17 Oct 2025
Withdrawal Update Form 2File: YD-Form2 -Sep 2025_16102025131304.PDF17 Oct 2025
Withdrawal Update Form 2File: YD-Form2 -Sep 2025_16102025131304.PDF17 Oct 2025
Withdrawal Update Form 3File: YD-Form 3 -Sep 2025_17102025142557.PDF17 Oct 2025
Withdrawal Update Form 3File: YD-Form 3 -Sep 2025_17102025142557.PDF17 Oct 2025
Withdrawal Update Form 1File: Dreamsong - Form 1.PDF22 Jul 2025
Withdrawal Update Form 2File: Dreamsong - form 2.PDF22 Jul 2025
Withdrawal Update Form 3File: Dreamsong - Form 3.PDF22 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dreamsong Form 1 March 2025.PDF19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dreamsong Form 3 March 2025.PDF19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dreamsong Form 2 March 2025.PDF19 Apr 2025
Other - LegalFile: 1 KHAREDIKHAT MANISHA PARDESHI VIVEK JOSHI 6784 2024.pdf18 Nov 2024
Other - LegalFile: 2 KHAREDIKHAT MANISHA PARDESHI VIVEK JOSHI 67842024.pdf18 Nov 2024
Other - LegalFile: 3 KHAREDIKHAT MANISHA PARDESHI VIVEK JOSHI 6784 2024.pdf18 Nov 2024
Other - LegalFile: 4 KHAREDIKHAT MANISHA PARDESHI VIVEK JOSHI 6784 2024.pdf18 Nov 2024
Other - LegalFile: 5 KHAREDIKHAT MANISHA PARDESHI VIVEK JOSHI 6784 2024.pdf18 Nov 2024
Other - LegalFile: 6 KHAREDIKHAT MANISHA PARDESHI VIVEK JOSHI 6784 2024.pdf18 Nov 2024
Other - LegalFile: 1 KHAREDIKHAT MR VASANT KATE MS PUNE LANDMARK 16553 2023.pdf18 Nov 2024
Other - LegalFile: 2 KHAREDIKHAT MR VASANT KATE MS PUNE LANDMARK 16553 2023.pdf18 Nov 2024
Other - LegalFile: 3 KHAREDIKHAT MR VASANT KATE MS PUNE LANDMARK 16553 2023.pdf18 Nov 2024
Copy of the legal title reportFile: YASHADA DREAMSONG SEARCH REPORT RERA.pdf13 Nov 2024
Proforma of Allotment letterFile: Allotment 12112024.PDF13 Nov 2024
Other - LegalFile: DECLARATION DREAMSONG 13112024.pdf13 Nov 2024
Declaration about Commencement CertificateFile: DELCERATION CC.PDF29 Oct 2024
Deviation Report with respect to Allotment letterFile: Deviation allotment letterFinal 25 10 24.PDF25 Oct 2024
Other - TechnicalFile: Layout Plan final highlighted 25 10 24.pdf25 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Deviation aggrement draft Final 25 10 24.PDF25 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Yashada Dreamsong Format A final 24 10 24.PDF24 Oct 2024
Proforma of Agreement for saleFile: Yashada Dreamsong Aggrement Draft Final.PDF24 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Bank Format B Final.PDF24 Oct 2024
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance.PDF21 Oct 2024
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Finance.PDF21 Oct 2024
Other - TechnicalFile: Declaration cum undertaking YD.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 final sign.pdf11 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure secure unsecured final.PDF10 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC DREAMSONG.pdf13 Aug 2024
CERSAI detailsFile: CERSAISearchReportYASHADA DRAMSONG.pdf12 Aug 2024
Details of encumbrances concerned to FinanceFile: Legal Encumbrance_09082024121939.PDF9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Yashada Dreamsong Form 1.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Yashada Dreamsong Form 2.PDF9 Aug 2024
Details of encumbrances concerned to LegalFile: Legal Encumbrance_09082024121939.PDF9 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Vasant Sir Disclosure_05082024160518.PDF8 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Jadhav Sir Disclosure_05082024160457.PDF8 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Vijay Sir Disclosure_07082024112442.PDF8 Aug 2024
Building plan approvalFile: PLAN NO 11.pdf3 Aug 2024
Building plan approvalFile: PLAN NO 10.pdf3 Aug 2024
Building plan approvalFile: PLAN NO 09.pdf3 Aug 2024
Building plan approvalFile: PLAN NO 08.pdf3 Aug 2024
Building plan approvalFile: PLAN NO 07.pdf3 Aug 2024
Building plan approvalFile: PLAN NO 06.pdf3 Aug 2024
Building plan approvalFile: PLAN NO 05.pdf3 Aug 2024
Building plan approvalFile: PLAN NO 04.pdf3 Aug 2024
Building plan approvalFile: PLAN NO 03.pdf3 Aug 2024
Building plan approvalFile: PLAN NO 02.pdf3 Aug 2024
Layout approvalFile: LAYOUT PLAN 01.pdf3 Aug 2024
PAN CardFile: YASHADA VIVANTA REALTY PVT LTD PAN CARD.pdf3 Aug 2024
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN 01.pdf3 Aug 2024
Declaration in FORM BFile: RERA DECLERATION YASHADA VIVANTA REALTY PVT LTD.pdf3 Aug 2024
Declaration in FORM BFile: RERA DECLERATION VASANT KATE.pdf3 Aug 2024
Declaration in FORM BFile: RERA DECLERATION SURYAKANT JADHAV.pdf3 Aug 2024
Declaration in FORM BFile: RERA DECLERATION SUDAM PARDESHI.pdf3 Aug 2024
Declaration in FORM BFile: RERA DECLERATION MANISHA PARDESHI.pdf3 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN NO 11.pdf3 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN NO 02.pdf3 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN NO 03.pdf3 Aug 2024

How this compares with Pune

18%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep YASHADA DREAMSONG on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAMURDI13,700+ in Pune

2 kmYASHADA DREAMSONGCompleted 54Lapsed / revoked 35Other 80Dot size: filed unitsN

Filed coordinates, straight-line distance. 169 registered projects within 2 km.

Builder: YASHADA VIVANTA REALTY PVT. LTD.

YASHADA VIVANTA REALTY PVT. LTD. has 1 registration on MahaRERA, including YASHADA DREAMSONG. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if YASHADA DREAMSONG is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of YASHADA DREAMSONG?

The registered promoter entity is YASHADA VIVANTA REALTY PVT. LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in YASHADA DREAMSONG?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for YASHADA DREAMSONG?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at YASHADA DREAMSONG?

The professionals named in the filing: Architect: VILAS JAGGANATH YELE VILAS YELE; Architect: VILAS JAGGANATH YELE; Engineer: HIRALAL BHASKAR SONAWANE BHASKAR SONAWANE; Engineer: HIRALAL BHASKAR SONAWANE; Chartered Accountant: Shalini Baheti BAHETI; Chartered Accountant: S GAUTAM & ASSOCIATES LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in YASHADA DREAMSONG?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About YASHADA DREAMSONG. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save YASHADA DREAMSONG to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.