Red flags
- Registration lapsed
- Possession 16 months past the filed date
- Completion date moved by 78 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
WHITE HOUSE is a Residential / Group Housing project by RUBBERWALA HOUSING & INFRASTRUCTURE LTD. in Mumbai City, Maharashtra, registered with MahaRERA as P51900003831 on 6 Aug 2017. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 78 months from the original filing. 21 of the 21 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.
At a glance
Project
- NameWHITE HOUSE
- TypeResidential / Group Housing
- Location
- TB KADAM MARG
- MAZGAON
- Mumbai City
- 400033
- Pincode400033
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900003831
- ReraGenie IDRG-MH-20311
Builder
- NameRUBBERWALA HOUSING & INFRASTRUCTURE LTD.
- Entity typeCompany
- ChairpersonTABREZ SHAFIAHMED SHAIKH
- Managing DirectorsPARVEZ SHAFIAHMED SHAIKH, HUMAYUN SHAFIAHMED SHAIKH
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on6 Aug 2017
- Promised completion30 Jun 2025
- Revised completionRevised to 30 Jun 2025 (originally 31 Dec 2018)
- Buildings1 building record
- Documents filed91 files
Current status
Figures as on 26 Aug 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WHITE HOUSE | NA | 22 | 20 | 21 | 0 | 21 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 26 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
WHITE HOUSE: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 26 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed22
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| RUBBERWALA HOUSING & INFRASTRUCTURE LTD. | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ARCHITECT REZA KABUL |
| Architect | SHAIKH & ASSOCIATES |
| Engineer | J W CONSULTANTS LLP |
| Chartered Accountant | BSN & ASSOCIATES |
| Chartered Accountant | MOHAN L GUPTA & ASSOCIATES |
| Partner | Role in project |
|---|---|
| RUBBERWALA HOUSING & INFRASTRUCTURE LTD. | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of the project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of pandemic of Covid-19. We have consent of 52.63% allottees for purpose of extension of RERA registration period of the said project.
Reason as filed by the promoterWe are already updated Part OC & Society Registration Certificate and also applied for Full OC. this is for request to Grant Extension upto 30.6.2025
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Jul 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 21 Feb 2024
Documents filed91
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2023-2024)File: Form 5 Whit_2023-4.pdf | 26 Aug 2025 |
| Form 5 (FY 2022-2023)File: Form 5 white_22-23.pdf | 26 Aug 2025 |
| Form 1File: ARCH WH MAR25.pdf | 24 Jun 2025 |
| Form 2File: ENG CER WH MAR25.pdf | 24 Jun 2025 |
| Form 3File: CA CERT WH MAR25.pdf | 24 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: QPR_whit.pdf | 24 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: disc sold book_whit (1).pdf | 24 Jun 2025 |
| Certificates of CA (Form 3)File: CA CERT WH MAR25.pdf | 7 May 2025 |
| Certificates of CA (Form 3)File: CA WHDEC24.pdf | 3 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH WH MAR25.pdf | 17 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CER WH MAR25.pdf | 17 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CERT_WHT_DEC24.pdf | 29 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT_WHIT_DEC24.pdf | 28 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: disc sold book_whit (1).pdf | 19 Dec 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: format A_white.pdf | 19 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_23-24 white.pdf | 19 Dec 2024 |
| Declaration in FORM BFile: FORM B - 30-06-25_White.pdf | 17 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: disc tabr_rhil.pdf | 9 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: disc_javed.pdf | 9 Dec 2024 |
| Proforma of Allotment letterFile: ALLOTMENT-VALENCIA.pdf | 27 Nov 2024 |
| Proforma of Agreement for saleFile: Valencia Agreement Draft.pdf | 27 Nov 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200327699966_For_Asset_Based_Search_15_11_2024_TS.pdf | 25 Nov 2024 |
| Certificates of CA (Form 3)File: CA CERT WHITE SEP 2024_compressed.pdf | 19 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CER WHIT JUNE24.pdf | 14 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT WHIT SEP24.pdf | 14 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CER WH SEP 24.pdf | 13 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CERT_2024-WHITE.pdf | 10 Aug 2024 |
| Certificates of CA (Form 3)File: CA_31MAR2024-WHITE.pdf | 7 Aug 2024 |
| Certificates of CA (Form 3)File: CA_30JUNE2024-WHITE.pdf | 7 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form2A-21-22-white.pdf | 26 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A-22-23-white.pdf | 26 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A_23-24-white.pdf | 26 Jun 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate.pdf | 20 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - White House as on March 2024 (1).pdf | 11 Jun 2024 |
| Certificates of CA (Form 3)File: Form3 White_upto 23.pdf | 30 Mar 2024 |
| Certificates of CA (Form 5)File: Form 5 white_22-23.pdf | 30 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 white_22-23.pdf | 30 Mar 2024 |
| Certificates of CA (Form 5)File: FORM 5 WHITE HOUSE 2017-18.pdf | 4 Mar 2024 |
| Certificates of CA (Form 3)File: CA 2018 WH_compressed.pdf | 26 Feb 2024 |
| Certificates of CA (Form 3)File: CA 2019-wh_compressed.pdf | 26 Feb 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC rubber.pdf | 21 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - White House as on Dec 2022.pdf | 16 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - White House as on Dec 2023.pdf | 16 Feb 2024 |
| Certificates of CA (Form 3)File: Form 3 - White House as on March 2018.pdf | 16 Feb 2024 |
| Certificates of CA (Form 3)File: Form 3 - White House as on March 2019.pdf | 16 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate-White House - (Jan-18 to Dec-18).pdf | 12 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate-White House - (Jan-19 to Mar-19).pdf | 12 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate-White House - (Apr-19 to Mar-20).pdf | 12 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate-White House - (Apr-20 to Dec-21).pdf | 12 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate-White House - (Jan-22 to Dec-22).pdf | 12 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate-White House - (Jan-23 to Sep-23).pdf | 12 Dec 2023 |
| Building plan approvalFile: plan 1 to 2.pdf | 23 Jul 2022 |
| Building plan approvalFile: plan 3 to 4.pdf | 23 Jul 2022 |
| Building plan approvalFile: plan 5.pdf | 23 Jul 2022 |
| Building Plan Approval (IOD)File: plan 1 to 2.pdf | 23 Jul 2022 |
| Building Plan Approval (IOD)File: plan 3 to 4.pdf | 23 Jul 2022 |
| Building Plan Approval (IOD)File: plan 5.pdf | 23 Jul 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Further CC.pdf | 23 Jul 2022 |
| Declaration about Commencement CertificateFile: WH Format D.pdf | 16 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: WH Inventory Declaration_compressed.pdf | 16 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2 A White House 2019_compressed.pdf | 13 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2 A White House 2020_compressed.pdf | 13 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2 A White House 2021_compressed.pdf | 13 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 WHITE HOUSE 2019.pdf | 13 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 WHITE HOUSE 2020.pdf | 13 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 WHITE HOUSE 2021.pdf | 13 Oct 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: WHITE HOUSE OC Certificate.pdf | 28 Aug 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: WHITE HOUSE ENGINEERS CERTIFICATE-30-10-17-ilovepdf-compressed.pdf | 31 Oct 2017 |
| Certificates of CA (Form 5)File: WH CA Cert Oct 2017.pdf | 31 Oct 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: White House Architect Certificate.pdf | 29 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: White House EngineersCertificate.pdf | 29 Jul 2017 |
| Certificates of CA (Form 3)File: White House CA Certificate.pdf | 29 Jul 2017 |
| Layout approvalFile: LAYOUT.pdf | 28 Jul 2017 |
| Building plan approvalFile: White House Amended Plan 1-5.pdf | 28 Jul 2017 |
| Building plan approvalFile: White House Amended Plan 2-5.pdf | 28 Jul 2017 |
| Building plan approvalFile: White House Amended Plan 3-5.pdf | 28 Jul 2017 |
| Building plan approvalFile: White House Amended Plan 4-5.pdf | 28 Jul 2017 |
| Building plan approvalFile: White House Amended Plan 5-5.pdf | 28 Jul 2017 |
| PAN CardFile: RHIL.pdf | 28 Jul 2017 |
| PAN CardFile: Parvez Ghaswala Pan card.pdf | 28 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 91 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep WHITE HOUSE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MAZGAON780+ in Mumbai City
Filed coordinates, straight-line distance. 81 registered projects within 2 km.
PARSHWA LOTUS & RANGARI HEIGHTS
GOLD PLAZA DEVELOPERS PVT LTD
Simana - Wing B - Phase 1
Bhoomi Properties
Simana - Wing A - Phase 1
Bhoomi Properties
DARSHAN AURA
DARSHAN SKY HIGH CONSTRUCTIONS LLP
Atlantis Residency
JK BUILDERS
VARDHMAN FLORA PHASE I
VARDHMAN DEVELOPERS LTD
See every Mumbai City project, with the district possession charts
Builder: RUBBERWALA HOUSING & INFRASTRUCTURE LTD.
RUBBERWALA HOUSING & INFRASTRUCTURE LTD. has 2 registrations on MahaRERA, including WHITE HOUSE and THE PLATINUM. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What does it mean that WHITE HOUSE shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if WHITE HOUSE is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of WHITE HOUSE?
The registered promoter entity is RUBBERWALA HOUSING & INFRASTRUCTURE LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in WHITE HOUSE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for WHITE HOUSE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at WHITE HOUSE?
The professionals named in the filing: Architect: ARCHITECT REZA KABUL; Architect: SHAIKH & ASSOCIATES; Engineer: J W CONSULTANTS LLP; Chartered Accountant: BSN & ASSOCIATES; Chartered Accountant: MOHAN L GUPTA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in WHITE HOUSE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback