ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai City, Maharashtra / WHITE HOUSE

Registration lapsed No litigation declared Residential / Group Housing project

WHITE HOUSE

By RUBBERWALA HOUSING & INFRASTRUCTURE LTD.

RG-MH-20311 · RERA P51900003831 · Last updated on MahaRERA portal: 26 Aug 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 16 months past the filed date
  • Completion date moved by 78 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Jun 2025Possession promised16 months past this date
11 of 11Construction stages doneevery applicable stage filed complete
0 of 21Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

WHITE HOUSE is a Residential / Group Housing project by RUBBERWALA HOUSING & INFRASTRUCTURE LTD. in Mumbai City, Maharashtra, registered with MahaRERA as P51900003831 on 6 Aug 2017. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 78 months from the original filing. 21 of the 21 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameWHITE HOUSE
  • TypeResidential / Group Housing
  • Location
    • TB KADAM MARG
    • MAZGAON
    • Mumbai City
    • 400033
  • Pincode400033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900003831
  • ReraGenie IDRG-MH-20311

Builder

  • NameRUBBERWALA HOUSING & INFRASTRUCTURE LTD.
  • Entity typeCompany
  • ChairpersonTABREZ SHAFIAHMED SHAIKH
  • Managing DirectorsPARVEZ SHAFIAHMED SHAIKH, HUMAYUN SHAFIAHMED SHAIKH
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

16 months past promisethis monthRegisteredAug 2017First promiseDec 2018Revised toJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on6 Aug 2017
  • Promised completion30 Jun 2025
  • Revised completionRevised to 30 Jun 2025 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed91 files

Current status

100%21 of 21 units booked

Figures as on 26 Aug 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WHITE HOUSENA222021021

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

WHITE HOUSE: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 26 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed22

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots22
Closed/Covered22

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area838 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Jun 2025
LandownerVillageDistrict
RUBBERWALA HOUSING & INFRASTRUCTURE LTD.Mumbai CityMumbai City

Approvals and building plan

Permissible FSI3528.5
Proposed, not sanctioned3,528 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBABA SAHEB GAWDE INSTITUTE BUILDING, GROUND FLOOR, MUMBAI CENTRAL, MUMBAI 400008

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCHITECT REZA KABUL
ArchitectSHAIKH & ASSOCIATES
EngineerJ W CONSULTANTS LLP
Chartered AccountantBSN & ASSOCIATES
Chartered AccountantMOHAN L GUPTA & ASSOCIATES
PartnerRole in project
RUBBERWALA HOUSING & INFRASTRUCTURE LTD.-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900011010Dec 2018 → Dec 2023

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of the project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of pandemic of Covid-19. We have consent of 52.63% allottees for purpose of extension of RERA registration period of the said project.

EXT51900025627Dec 2018 → Jun 2025

Reason as filed by the promoterWe are already updated Part OC & Society Registration Certificate and also applied for Full OC. this is for request to Grant Extension upto 30.6.2025

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Feb 2024

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2023-2024)File: Form 5 Whit_2023-4.pdf26 Aug 2025
Form 5 (FY 2022-2023)File: Form 5 white_22-23.pdf26 Aug 2025
Form 1File: ARCH WH MAR25.pdf24 Jun 2025
Form 2File: ENG CER WH MAR25.pdf24 Jun 2025
Form 3File: CA CERT WH MAR25.pdf24 Jun 2025
Self-declaration of Quarterly ProgressFile: QPR_whit.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: disc sold book_whit (1).pdf24 Jun 2025
Certificates of CA (Form 3)File: CA CERT WH MAR25.pdf7 May 2025
Certificates of CA (Form 3)File: CA WHDEC24.pdf3 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH WH MAR25.pdf17 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CER WH MAR25.pdf17 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CERT_WHT_DEC24.pdf29 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT_WHIT_DEC24.pdf28 Jan 2025
Disclosure of sold/ booked inventoryFile: disc sold book_whit (1).pdf19 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: format A_white.pdf19 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_23-24 white.pdf19 Dec 2024
Declaration in FORM BFile: FORM B - 30-06-25_White.pdf17 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: disc tabr_rhil.pdf9 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: disc_javed.pdf9 Dec 2024
Proforma of Allotment letterFile: ALLOTMENT-VALENCIA.pdf27 Nov 2024
Proforma of Agreement for saleFile: Valencia Agreement Draft.pdf27 Nov 2024
CERSAI detailsFile: CERSAI_Search_Report_200327699966_For_Asset_Based_Search_15_11_2024_TS.pdf25 Nov 2024
Certificates of CA (Form 3)File: CA CERT WHITE SEP 2024_compressed.pdf19 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CER WHIT JUNE24.pdf14 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT WHIT SEP24.pdf14 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CER WH SEP 24.pdf13 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CERT_2024-WHITE.pdf10 Aug 2024
Certificates of CA (Form 3)File: CA_31MAR2024-WHITE.pdf7 Aug 2024
Certificates of CA (Form 3)File: CA_30JUNE2024-WHITE.pdf7 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form2A-21-22-white.pdf26 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A-22-23-white.pdf26 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A_23-24-white.pdf26 Jun 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate.pdf20 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - White House as on March 2024 (1).pdf11 Jun 2024
Certificates of CA (Form 3)File: Form3 White_upto 23.pdf30 Mar 2024
Certificates of CA (Form 5)File: Form 5 white_22-23.pdf30 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 white_22-23.pdf30 Mar 2024
Certificates of CA (Form 5)File: FORM 5 WHITE HOUSE 2017-18.pdf4 Mar 2024
Certificates of CA (Form 3)File: CA 2018 WH_compressed.pdf26 Feb 2024
Certificates of CA (Form 3)File: CA 2019-wh_compressed.pdf26 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC rubber.pdf21 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - White House as on Dec 2022.pdf16 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - White House as on Dec 2023.pdf16 Feb 2024
Certificates of CA (Form 3)File: Form 3 - White House as on March 2018.pdf16 Feb 2024
Certificates of CA (Form 3)File: Form 3 - White House as on March 2019.pdf16 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate-White House - (Jan-18 to Dec-18).pdf12 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate-White House - (Jan-19 to Mar-19).pdf12 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate-White House - (Apr-19 to Mar-20).pdf12 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate-White House - (Apr-20 to Dec-21).pdf12 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate-White House - (Jan-22 to Dec-22).pdf12 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate-White House - (Jan-23 to Sep-23).pdf12 Dec 2023
Building plan approvalFile: plan 1 to 2.pdf23 Jul 2022
Building plan approvalFile: plan 3 to 4.pdf23 Jul 2022
Building plan approvalFile: plan 5.pdf23 Jul 2022
Building Plan Approval (IOD)File: plan 1 to 2.pdf23 Jul 2022
Building Plan Approval (IOD)File: plan 3 to 4.pdf23 Jul 2022
Building Plan Approval (IOD)File: plan 5.pdf23 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: Further CC.pdf23 Jul 2022
Declaration about Commencement CertificateFile: WH Format D.pdf16 Oct 2021
Disclosure of sold/ booked inventoryFile: WH Inventory Declaration_compressed.pdf16 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2 A White House 2019_compressed.pdf13 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2 A White House 2020_compressed.pdf13 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2 A White House 2021_compressed.pdf13 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 WHITE HOUSE 2019.pdf13 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 WHITE HOUSE 2020.pdf13 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 WHITE HOUSE 2021.pdf13 Oct 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: WHITE HOUSE OC Certificate.pdf28 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: WHITE HOUSE ENGINEERS CERTIFICATE-30-10-17-ilovepdf-compressed.pdf31 Oct 2017
Certificates of CA (Form 5)File: WH CA Cert Oct 2017.pdf31 Oct 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: White House Architect Certificate.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: White House EngineersCertificate.pdf29 Jul 2017
Certificates of CA (Form 3)File: White House CA Certificate.pdf29 Jul 2017
Layout approvalFile: LAYOUT.pdf28 Jul 2017
Building plan approvalFile: White House Amended Plan 1-5.pdf28 Jul 2017
Building plan approvalFile: White House Amended Plan 2-5.pdf28 Jul 2017
Building plan approvalFile: White House Amended Plan 3-5.pdf28 Jul 2017
Building plan approvalFile: White House Amended Plan 4-5.pdf28 Jul 2017
Building plan approvalFile: White House Amended Plan 5-5.pdf28 Jul 2017
PAN CardFile: RHIL.pdf28 Jul 2017
PAN CardFile: Parvez Ghaswala Pan card.pdf28 Jul 2017

How this compares with Mumbai City

100%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 78 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is among them

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep WHITE HOUSE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAZGAON780+ in Mumbai City

2 kmWHITE HOUSECompleted 13Lapsed / revoked 21Other 47Dot size: filed unitsN

Filed coordinates, straight-line distance. 81 registered projects within 2 km.

Builder: RUBBERWALA HOUSING & INFRASTRUCTURE LTD.

RUBBERWALA HOUSING & INFRASTRUCTURE LTD. has 2 registrations on MahaRERA, including WHITE HOUSE and THE PLATINUM. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What does it mean that WHITE HOUSE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if WHITE HOUSE is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of WHITE HOUSE?

The registered promoter entity is RUBBERWALA HOUSING & INFRASTRUCTURE LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in WHITE HOUSE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for WHITE HOUSE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at WHITE HOUSE?

The professionals named in the filing: Architect: ARCHITECT REZA KABUL; Architect: SHAIKH & ASSOCIATES; Engineer: J W CONSULTANTS LLP; Chartered Accountant: BSN & ASSOCIATES; Chartered Accountant: MOHAN L GUPTA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in WHITE HOUSE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About WHITE HOUSE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save WHITE HOUSE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.