ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai City, Maharashtra / Simana - Wing A - Phase 1

Registration lapsed No litigation declared Residential / Group Housing project

Simana - Wing A - Phase 1

By Bhoomi Properties

RG-MH-38960 · RERA P51900033360 · Last updated on MahaRERA portal: 6 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
10 of 11Construction stages donefurthest along: Installation of Lifts, 90%
90 of 237Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

Simana - Wing A - Phase 1 is a Residential / Group Housing project by Bhoomi Properties in Mumbai City, Maharashtra, registered with MahaRERA as P51900033360 on 16 Feb 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 147 of the 237 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSimana - Wing A - Phase 1
  • TypeResidential / Group Housing
  • Location
    • Parel Tank Road
    • Parel
    • Mumbai City
    • 400033
  • Pincode400033
  • RERA no.P51900033360
  • ReraGenie IDRG-MH-38960

Builder

  • NameBhoomi Properties
  • Entity typePartnership
  • PartnersAkshay Jayantilal Doshi, Jayesh Jayantilal Doshi, Prashasti Developers Private Limited Prashasti Developers Private Limited, Chaitya Ajay Mehta, Nirav Bhushan Mehta, Shail Bhushan Mehta
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredFeb 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on16 Feb 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed94 files

Current status

62%147 of 237 units booked
100.0%Work done, per cost certificate

Figures as on 6 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Simana - Wing A - Phase 1NA52522370237

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 90%.

Simana - Wing A - Phase 1: 99% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 6 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area16,495 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Byramjee Jeejeebhoy Pvt LtdMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI117738.73
Proposed, not sanctioned25,670 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHubtown Solaris, Gundavali, Saiwadi, Andheri East Mumbai 400069
Estimated costRs 191.52 cr
Cost incurredRs 191.52 cr
Work done100.0%
BuildingWingEstimatedIncurred
Simana - Wing A - Phase 1NARs 185.78 crRs 185.78 cr
-NARs 5.75 crRs 5.75 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHIREN S THAKKAR
EngineerVihang Shah
Chartered AccountantAMIT TARACHAND JAIN
PartnerRole in project
Bhoomi Properties-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12400013Amolika BandiwadekarBhoomi Properties23/09/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Rera Certificate Sep 2025 Wing A.pdf6 May 2026
Withdrawal Update Form 2File: Bhoomi Simana RERA Engg Certificate Sept 25 Wing A.pdf6 May 2026
Withdrawal Update Form 3File: Simana Wing A Sept-2025.pdf6 May 2026
Withdrawal Update Form 1File: Rera Certificate june 2025 Wing A.pdf4 Mar 2026
Withdrawal Update Form 2File: 13 Bhoomi Simana Engineers Certificate Tower A June 2025.pdf4 Mar 2026
Withdrawal Update Form 3File: Simana Wing - A June 2025_11zon.pdf4 Mar 2026
Form 1File: Rera Certificate of WING A March 2025.pdf31 Dec 2025
Form 2File: 11 Bhoomi Simama Form 2 Engineers Certificate Tower A March 2025.pdf31 Dec 2025
Form 3File: FORM 3 BHOOMI PROPERTIES MARCH 2025 WING A.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: Wing A.pdf31 Dec 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Final March-25 A wing.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: A WING (AS ON 30th JUNE)_compressed.pdf1 Apr 2025
Disclosure of sold/ booked inventoryFile: A WING (AS ON 30th SEP)_uploed.pdf1 Apr 2025
Disclosure of sold/ booked inventoryFile: A WING (AS ON 31ST DEC) uploed.pdf1 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 ARCHITECT CERTIFICATE WING A.pdf24 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Simana A wing RERA June 2024.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Simana A wing RERA Sept 2024.pdf19 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: A wing form 5 Upload.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Fprm 1 wing A RERA certificate.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Bhoomi Simana Tower A RERA March 2024 Engg.pdf12 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Simana A wing Sep 24-Up.pdf7 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Simana Wing -A upload.pdf13 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bhoomi Properties Simana Wing - A March,2024_ new.pdf30 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Simana - Wing -A UPLOAD.pdf30 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bhoomi property_new.pdf30 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bhoomi Properties (1)_.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -Engineer’s Certificate Tower A Sep ,2023.pdf14 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Simana A wing Form 3.pdf19 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 A wing 22-23.pdf5 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Certificate wing A.pdf14 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Latest CC.pdf9 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: wing A rera certificate.pdf21 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: March,23 CA Certifiate.pdf20 Jul 2023
Disclosure of sold/ booked inventoryFile: Wing A simana as on March,2023_Upload.pdf29 Jun 2023
Disclosure of sold/ booked inventoryFile: Binder1 A wing_compressed.pdf29 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Egineering Certificate Simana A wing.pdf22 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Simana Wing A.pdf9 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Simana Wing A Form 1.pdf19 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Wing A Form 2.pdf18 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Wing A Form 3.pdf18 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Wing A Simana_compressed.pdf12 Jan 2023
Disclosure of sold/ booked inventoryFile: A wing SoldUnsold Dec,22_compressed.pdf12 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Simana Wing A CA Certificate Sep,22_compressed.pdf17 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Wing A Simana Engineering Certificate.pdf14 Nov 2022
Disclosure of sold/ booked inventoryFile: Wing A Sold Unsold.pdf4 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Simana Wing A Architect Sep-22_compressed.pdf1 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Wing A.pdf20 Oct 2022
Disclosure of sold/ booked inventoryFile: Sol unsold disclosure.pdf21 Sep 2022
Details of encumbrances concerned to LegalFile: SIMANA WING A.pdf5 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SIMANA WING A.pdf5 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3 Wing A.pdf5 Feb 2022
Proforma of Allotment letterFile: AFS aligned.pdf5 Feb 2022
Proforma of Allotment letterFile: Allotment Letter.pdf5 Feb 2022
OtherFile: Additional Declaration Simana Wing A.pdf5 Feb 2022
Building plan approvalFile: 2 Common.pdf4 Feb 2022
Building plan approvalFile: 3 Common.pdf4 Feb 2022
Building plan approvalFile: 4 Common.pdf4 Feb 2022
Building plan approvalFile: 5 Common.pdf4 Feb 2022
Building plan approvalFile: 6 Common.pdf4 Feb 2022
Building plan approvalFile: 7 Wing A.pdf4 Feb 2022
Building plan approvalFile: 8 Wing A.pdf4 Feb 2022
Building plan approvalFile: 9 Wing A.pdf4 Feb 2022
Building plan approvalFile: 10 Common.pdf4 Feb 2022
Building plan approvalFile: 11 Wing A.pdf4 Feb 2022
Building plan approvalFile: 12 Wing A.pdf4 Feb 2022
Building plan approvalFile: 20 Common.pdf4 Feb 2022
Building plan approvalFile: 21 Common.pdf4 Feb 2022
Details of encumbrancesFile: Encumbrance - A wing.pdf4 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: 2 Common.pdf4 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: 3 Common.pdf4 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: 4 Common.pdf4 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: 5 Common.pdf4 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: 6 Common.pdf4 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: 7 Wing A.pdf4 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: 8 Wing A.pdf4 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: 9 Wing A.pdf4 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: 10 Common.pdf4 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: 11 Wing A.pdf4 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: 12 Wing A.pdf4 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: 20 Common.pdf4 Feb 2022

How this compares with Mumbai City

62%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is among them

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Simana - Wing A - Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Parel780+ in Mumbai City

Builder: Bhoomi Properties

Bhoomi Properties has 3 registrations on MahaRERA, including Simana - Wing B - Phase 1 and Simana - Wing A - Phase 1. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What does it mean that Simana - Wing A - Phase 1 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Simana - Wing A - Phase 1 is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Simana - Wing A - Phase 1?

The registered promoter entity is Bhoomi Properties, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Simana - Wing A - Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Simana - Wing A - Phase 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Simana - Wing A - Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Simana - Wing A - Phase 1?

The professionals named in the filing: Architect: HIREN S THAKKAR; Engineer: Vihang Shah; Chartered Accountant: AMIT TARACHAND JAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Simana - Wing A - Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Simana - Wing A - Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Simana - Wing A - Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.