WHITE HOUSE
By Laabh Samruddhi Enterprises
RG-MH-10731 · RERA P51700004612 · Last updated on MahaRERA portal: 19 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 2 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
WHITE HOUSE is a Others project by Laabh Samruddhi Enterprises in Thane, Maharashtra, registered with MahaRERA as P51700004612 on 9 Aug 2017. Possession was promised by 30 Dec 2025 and is now 10 months past that date. 2 complaints are on record with the regulator.
At a glance
Project
- NameWHITE HOUSE
- TypeOthers
- Location
- GHODBUNDER ROAD
- KASARVADAVLI
- Thane (M Corp.)
- Thane
- 400615
- Pincode400615
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700004612
- ReraGenie IDRG-MH-10731
Builder
- NameLaabh Samruddhi Enterprises
- Entity typePartnership
- PartnerKALPESH JAYANTILAL SANGHAVI
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on9 Aug 2017
- Promised completion30 Dec 2025
- Revised completionNone
- Buildings2 building records
- Documents filed108 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A and A1 | NA | 20 | 0 | 0 | 0 | 0 |
| BUILDING B | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 19 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 25%.
A and A131%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 12% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 25% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 19 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 25% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
| OTHERS | Yes | 0% |
Parking filed130
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A and A1 | 120 | 2 | 122 |
| BUILDING B | 8 | 0 | 8 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AKRUTI CONSULTANTS |
| Partner | Role in project |
|---|---|
| Laabh Samruddhi Enterprises | - |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000344213 | Atmaram Hender Raut | Merit Magnum Construction | 03/02/2023 |
| CC12500817 | Rohan Suresh Phalke | Laabh Samruddhi Enterprises | 10/03/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Jul 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Jul 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed108
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: LSE Architects June 2025.pdf | 19 Jan 2026 |
| Form 2File: EC_LSE_JUNE_25.pdf | 19 Jan 2026 |
| Form 3File: LSE Form 3 June 2025.pdf | 19 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: LH Sold and unsold June 2025.pdf | 19 Jan 2026 |
| Form 1File: WH-RERA-ARCHITECTS-DT-30-09-2025.pdf | 19 Jan 2026 |
| Form 2File: EC _LSE-FORM-2 DT-30-09-2025.pdf | 19 Jan 2026 |
| Form 3File: LSE Form 3 Sept 2025.pdf | 19 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: LH Sold and unsold Sept 2025.pdf | 19 Jan 2026 |
| Form 1File: LSE-ARCHITECT LETTAR DT-31-12-2025.pdf | 19 Jan 2026 |
| Form 2File: EC_LSE_DEC_25.pdf | 19 Jan 2026 |
| Form 3File: LSE-ARCHITECT LETTAR DT-31-12-2025.pdf | 19 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: LH Sold and unsold Dec 2025.pdf | 19 Jan 2026 |
| Certificates of CA (Form 3)File: LSE_Form3_March 2025_compressed.pdf | 28 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LSE_Form2_March 2025.pdf | 28 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LSE - form2 march 2025.pdf | 28 May 2025 |
| Form 1File: AC_LSE_March 2025 - sing.pdf | 23 May 2025 |
| Form 2File: LSE_Form2_March 2025.pdf | 23 May 2025 |
| Form 3File: LSE_Form3_March 2025_compressed.pdf | 23 May 2025 |
| Disclosure of Sold and Booked InventoryFile: WH SOLD and UNSOLD March 2025.pdf | 23 May 2025 |
| Certificates of CA (Form 3)File: LSE Form 3 March 2024.pdf | 13 May 2025 |
| Certificates of CA (Form 3)File: LSE Form 3 June - 2024.pdf | 13 May 2025 |
| Certificates of CA (Form 3)File: LSE Form 3 Sept -2024.pdf | 13 May 2025 |
| Certificates of CA (Form 3)File: LSE Form 3 Dec 2024.pdf | 13 May 2025 |
| Certificates of CA (Form 3)File: LSE Form-3 Final March 2025_compressed.pdf | 13 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC_LSE_March 2025 - sing.pdf | 6 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC_LSE_March_25.pdf | 6 May 2025 |
| Disclosure of sold/ booked inventoryFile: WH- SOLD and UNSOLD March 2024.pdf | 6 May 2025 |
| Disclosure of sold/ booked inventoryFile: WH-SOLD and UNSOLD June 2024.pdf | 6 May 2025 |
| Disclosure of sold/ booked inventoryFile: WH SOLD and UNSOLD Sept 2024.pdf | 6 May 2025 |
| Disclosure of sold/ booked inventoryFile: WH SOLD and UNSOLD Dec 2024.pdf | 6 May 2025 |
| Disclosure of sold/ booked inventoryFile: WH SOLD and UNSOLD March 2025.pdf | 6 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: LSE -FORM -5 DT-31-03-24 (1).pdf | 6 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QAC_LSE_23-24 - sing.pdf | 29 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS -LSE-31-03-2024.pdf | 25 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LSE Architects June 2024.pdf | 25 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LSE Architects Sept 2024.pdf | 25 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LSE Architects Dec 2024.pdf | 25 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC_LSE_March 24.pdf | 25 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate June 2024.pdf | 25 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Sept 2024.pdf | 25 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC_LSE_DEC_24.pdf | 25 Mar 2025 |
| Home Buyer /Allottee Grievance Redressal CellFile: Investor Grievance Cell.pdf | 25 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM2A LSE 22-23.pdf | 6 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 March 2023.pdf | 6 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate June 2022.pdf | 20 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Sept 2022.pdf | 20 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate Dec 2022.pdf | 20 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate March 2023.pdf | 20 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate June 2023.pdf | 20 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Sept 2023.pdf | 20 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Dec 2023.pdf | 20 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 June 2022.pdf | 20 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 Sept 2022.pdf | 20 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 Dec 2022.pdf | 20 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 March 2023.pdf | 20 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 June 2023.pdf | 20 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 Sept 2023.pdf | 20 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 Dec 2023.pdf | 20 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: WH SOLD and UNSOLD June 2022.pdf | 19 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: WH SOLD and UNSOLD Sept 2022.pdf | 19 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: WH SOLD and UNSOLD Dec 2022.pdf | 19 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: WH SOLD and UNSOLD march 2023.pdf | 19 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: WH SOLD and UNSOID June 2023.pdf | 19 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: WH SOLD and UNSOLD Sept 2023.pdf | 19 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD and UNSOLD Dec 2023.pdf | 19 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Dec 2023.pdf | 15 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate June 2022.pdf | 4 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sept 2022.pdf | 4 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Dec 2022.pdf | 4 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate March 2023.pdf | 4 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate June 2023.pdf | 4 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sept 2023.pdf | 4 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: 2023 04 10 - Sold Unsold White House.pdf | 19 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Laabh Samruddhi Enterprises.pdf | 2 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: 2023 01 04 - Sold-Unsold-Whitehouse.pdf | 13 Jan 2023 |
| Proforma of Agreement for saleFile: WH_AFS_Uploaded on RERA_01_22112022.pdf | 9 Dec 2022 |
| Disclosure of sold/ booked inventoryFile: Sold- Unsold- White House- March 22.pdf | 14 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: Dec -2021 Sold and Unsold.pdf | 1 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: LSE From 5 March 2021.pdf | 27 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: ANNUAL REPORT 2019-20.pdf | 12 Jan 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 108 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep WHITE HOUSE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KASARVADAVLI7,600+ in Thane
Filed coordinates, straight-line distance. 156 registered projects within 2 km.
Godrej Emerald Thane
Godrej Greenview Housing Private Limited
NORTH IMPERIAL GREENS -TOWER 2
Skylark Buildspace Private Limited
VIHANG MARINA
BALAJI ENTERPRISES
Puranik City Reserva Phase 1
Puranik Builders Limited
NORTH IMPERIAL GREENS - TOWER 1
Skylark Buildspace Private Limited
RAUNAK 108
UNNATHI ASSOCIATES
See every Thane project, with the district possession charts
Builder: Laabh Samruddhi Enterprises
Laabh Samruddhi Enterprises has 1 registration on MahaRERA, including WHITE HOUSE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that WHITE HOUSE shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if WHITE HOUSE is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of WHITE HOUSE?
The registered promoter entity is Laabh Samruddhi Enterprises, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in WHITE HOUSE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against WHITE HOUSE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for WHITE HOUSE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at WHITE HOUSE?
The professionals named in the filing: Architect: AKRUTI CONSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in WHITE HOUSE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.