Home / Browse projects / Pune, Maharashtra / Westernhills Phase 2 - B, C, D, E Buildings

Completed No litigation declared Residential / Group Housing project

Westernhills Phase 2 - B, C, D, E Buildings

By High Seas Properties Private Limited

RG-MH-10430 · RERA P52100001239 · Last updated on MahaRERA portal: 15 Mar 2022

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2022Possession promisedregistration recorded completed
40 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 0%
3Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

Westernhills Phase 2 - B, C, D, E Buildings is a Residential / Group Housing project by High Seas Properties Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100001239 on 27 Jul 2017. The registration is recorded completed; possession was promised by 18 Jul 2022. 3 complaints are on record with the regulator.

At a glance

Project

  • NameWesternhills Phase 2 - B, C, D, E Buildings
  • TypeResidential / Group Housing
  • Location
    • Sus
    • Pune
    • Mulshi
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100001239
  • ReraGenie IDRG-MH-10430

Builder

  • NameHigh Seas Properties Private Limited
  • Entity typeCompany
  • Managing DirectorRahul Hemraj Mundada
  • Other registrations4 more →
  • Completed5 of 5

Key dates

this monthRegisteredJul 2017PromisedJul 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 Jul 2017
  • Promised completion18 Jul 2022
  • Revised completionNone
  • Buildings4 building records
  • Documents filed71 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BNA160000
CNA160000
DNA160000
ENA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 15 Mar 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

40 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.

B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
E91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 Mar 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed1006

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,006
Closed/Covered1,006
BuildingClosed/CoveredTotal
B232232
C232232
D232232
E310310

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,592 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
Prasanna DevelopersPune (M Corp.)Pune
Harish Raoji PatilPune (M Corp.)Pune
Neeti alias Neeta Harish PatilPune (M Corp.)Pune
Rohan Harish PatilPune (M Corp.)Pune
Vijay Vasant KulkarniPune (M Corp.)Pune
Uma Vijay KulkarniPune (M Corp.)Pune

Approvals and building plan

Permissible FSI21678.37
Proposed, not sanctioned20,433 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKothrud, Pune

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMilind Saraf Proprietor of Subha Architects
EngineerSunil Gundpant Mutalik
PartnerRole in project
High Seas Properties Private Limited-

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC005000000053840Amol KulkarniAtul Hemraj Mundada27/12/2019
CC005000000095752M/s. Anubhav Trading through its Partner Dilip Kumar JaiswalHigh Seas Proerties Pvt. Ltd. through its director Atul Hemraj Mundada07/07/2021
CC005000000157249M/s. High Seas Properties Private Limited Through its Managing Director Mr. Atul Hemraj MundadaM/s. Anubhav Trading A Partnership FirmThrough its Partner Mr. Amit Kumar Chaudhari18/06/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Sep 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Sep 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Sep 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Feb 2022

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf15 Mar 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf3 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate - B3 - B4, D1 to D4_compressed.pdf30 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf30 Aug 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Certificate.pdf30 Aug 2021
Layout approvalFile: Layout.pdf17 Sep 2019
Building plan approvalFile: 2.pdf17 Sep 2019
Building plan approvalFile: 3.pdf17 Sep 2019
Building plan approvalFile: 4.pdf17 Sep 2019
Building plan approvalFile: 5.pdf17 Sep 2019
Building plan approvalFile: 6.pdf17 Sep 2019
Copy of Layout Approval (in case of layout)File: Layout.pdf17 Sep 2019
Building Plan Approval (IOD)File: 2.pdf17 Sep 2019
Building Plan Approval (IOD)File: 3.pdf17 Sep 2019
Building Plan Approval (IOD)File: 4.pdf17 Sep 2019
Building Plan Approval (IOD)File: 5.pdf17 Sep 2019
Building Plan Approval (IOD)File: 6.pdf17 Sep 2019
Commencement Certificates / NA Order for plotted developmentFile: PMRDA order.pdf17 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf15 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf15 Oct 2018
OtherFile: Completion Certificate - Phase 2.pdf11 Aug 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf15 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf9 Jun 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate (2).pdf24 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf9 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf9 Feb 2018
Declaration in FORM BFile: Form B.pdf2 Nov 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf2 Nov 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf2 Nov 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate of Architect - Phase 2.pdf24 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate of Engineer - Phase 2.pdf24 Jul 2017
Certificates of CA (Form 3)File: Certificate of CA- Phase 2.pdf24 Jul 2017
Proforma of Allotment letterFile: Proforma of the allotment letter and agreement to sale - Phase 2.pdf24 Jul 2017
Declaration in FORM BFile: Form B - Phase 2.pdf22 Jul 2017
Building plan approvalFile: 4.pdf21 Jul 2017
Layout approvalFile: layout.pdf21 Jul 2017
Building plan approvalFile: 2.pdf21 Jul 2017
Building plan approvalFile: 3.pdf21 Jul 2017
Building plan approvalFile: 5.pdf21 Jul 2017
Building plan approvalFile: 6.pdf21 Jul 2017
Building plan approvalFile: 7.pdf21 Jul 2017
Building plan approvalFile: 8.pdf21 Jul 2017
Building plan approvalFile: 9.pdf21 Jul 2017
Building plan approvalFile: 10.pdf21 Jul 2017
Building plan approvalFile: 11.pdf21 Jul 2017
Building plan approvalFile: 12.pdf21 Jul 2017
Building plan approvalFile: 13.pdf21 Jul 2017
Building plan approvalFile: 14.pdf21 Jul 2017
Building plan approvalFile: 15.pdf21 Jul 2017
Building plan approvalFile: 16.pdf21 Jul 2017
PAN CardFile: HSPPL Pan Card (1).pdf21 Jul 2017
Copy of the legal title reportFile: Legal Title Report.pdf21 Jul 2017
Details of encumbrancesFile: PH 2 - Encumbrance Certificate.pdf21 Jul 2017
Copy of Layout Approval (in case of layout)File: layout.pdf21 Jul 2017
Building Plan Approval (IOD)File: 2.pdf21 Jul 2017
Building Plan Approval (IOD)File: 3.pdf21 Jul 2017
Building Plan Approval (IOD)File: 4.pdf21 Jul 2017
Building Plan Approval (IOD)File: 5.pdf21 Jul 2017
Building Plan Approval (IOD)File: 6.pdf21 Jul 2017
Building Plan Approval (IOD)File: 7.pdf21 Jul 2017
Building Plan Approval (IOD)File: 8.pdf21 Jul 2017
Building Plan Approval (IOD)File: 9.pdf21 Jul 2017
Building Plan Approval (IOD)File: 10.pdf21 Jul 2017
Building Plan Approval (IOD)File: 11.pdf21 Jul 2017
Building Plan Approval (IOD)File: 12.pdf21 Jul 2017
Building Plan Approval (IOD)File: 13.pdf21 Jul 2017
Building Plan Approval (IOD)File: 14.pdf21 Jul 2017
Building Plan Approval (IOD)File: 15.pdf21 Jul 2017
Building Plan Approval (IOD)File: 16.pdf21 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: PMRDA Order - Phase 2.pdf21 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: NA Order Sus 45-1 - Phase - II.pdf21 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Westernhills Phase 2 - B, C, D, E Buildings on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pune13,700+ in Pune

2 kmWesternhills Phase 2 - BCompleted 117Lapsed / revoked 37Other 75Dot size: filed unitsN

Filed coordinates, straight-line distance. 229 registered projects within 2 km.

Builder: High Seas Properties Private Limited

High Seas Properties Private Limited has 5 registrations on MahaRERA, including Westernhills D 6 and Westernhills Phase 2 - B, C, D, E Buildings. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Westernhills Phase 2 - B, C, D, E Buildings is delayed beyond 18 Jul 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Westernhills Phase 2 - B, C, D, E Buildings?

The registered promoter entity is High Seas Properties Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Westernhills Phase 2 - B, C, D, E Buildings?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Westernhills Phase 2 - B, C, D, E Buildings?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Westernhills Phase 2 - B, C, D, E Buildings?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Westernhills Phase 2 - B, C, D, E Buildings?

The professionals named in the filing: Architect: Milind Saraf Proprietor of Subha Architects; Engineer: Sunil Gundpant Mutalik. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Westernhills Phase 2 - B, C, D, E Buildings?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Westernhills Phase 2 - B, C, D, E Buildings. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Westernhills Phase 2 - B, C, D, E Buildings to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.