Home / Browse projects / Pune, Maharashtra / Westernhills B 3 - B 4, D 1 - D 4

Completed No litigation declared Residential / Group Housing project

Westernhills B 3 - B 4, D 1 - D 4

RG-MH-10154 · RERA P52100001103 · Last updated on MahaRERA portal: 20 Aug 2021

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2018Possession promisedregistration recorded completed
14 of 66Construction stages doneacross 6 buildings; furthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 29 documents Report an error

Westernhills B 3 - B 4, D 1 - D 4 is a Residential / Group Housing project by Promoter name not stated in filing in Pune, Maharashtra, registered with MahaRERA as P52100001103 on 26 Jul 2017. The registration is recorded completed; possession was promised by 18 Jul 2018. The completion date has moved by 4 months from the original filing.

At a glance

Project

  • NameWesternhills B 3 - B 4, D 1 - D 4
  • TypeResidential / Group Housing
  • Location
    • Sus
    • Mulshi
    • Pune
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100001103
  • ReraGenie IDRG-MH-10154

Builder

  • NamePromoter name not stated in filing
  • Managing DirectorRahul Hemraj Mundada

Key dates

this monthRegisteredJul 2017First promiseMar 2018Revised toJul 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 Jul 2017
  • Promised completion18 Jul 2018
  • Revised completionRevised to 18 Jul 2018 (originally 18 Mar 2018)
  • Buildings6 building records
  • Documents filed29 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B 3NA60000
B 4NA60000
D 1NA60000
D 2NA60000
D 3NA60000
D 4NA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 20 Aug 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Internal walls, at 95%.

B 367%
ActivityProgress
Excavation100%
Basement (if any)75%
Podiums (if any)0%
Plinth75%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
B 468%
ActivityProgress
Excavation100%
Basement (if any)75%
Podiums (if any)0%
Plinth75%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
D 177%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises55%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
D 277%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises55%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
D 378%
ActivityProgress
Excavation100%
Basement (if any)75%
Podiums (if any)0%
Plinth75%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
D 478%
ActivityProgress
Excavation100%
Basement (if any)75%
Podiums (if any)0%
Plinth75%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 20 Aug 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes85%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes85%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes70%
Street LightingYes70%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes95%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes60%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes30%
Open ParkingNoNot applicable

Parking filed144

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots144
Closed/Covered144
BuildingClosed/CoveredTotal
B 32424
B 42424
D 12424
D 22424
D 32424
D 42424

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,086 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
Prasanna DevelopersPune (M Corp.)Pune
Harish Raoji PatilPune (M Corp.)Pune
Neeti alias Neeta Harish PatilPune (M Corp.)Pune
Rohan Harish PatilPune (M Corp.)Pune
Vijay Vasant KulkarniPune (M Corp.)Pune
Uma Vijay KulkarniPune (M Corp.)Pune

Approvals and building plan

Permissible FSI7426.38
Proposed, not sanctioned6,376 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKothrud, Pune

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMilind Saraf Proprietor of Subha Architects
EngineerSunil Mutalik
PartnerRole in project
High Seas Properties Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100000255Mar 2018 → Sep 2018

Reason as filed by the promoterApplication for completion certificate has been applied with the concerned department.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Nov 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Aug 2021

Documents filed29

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Certificate.pdf20 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate - B3 - B4, D1 to D4_compressed.pdf19 Aug 2021
Certificates of Architect (Form 4)File: Architect Certificate - Form 4.pdf19 May 2018
OtherFile: Completion Certificate - B3 - B4, D1 to D4.pdf10 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf9 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf9 Feb 2018
Layout approvalFile: layout 1.pdf2 Nov 2017
Copy of Layout Approval (in case of layout)File: layout 1.pdf2 Nov 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf2 Nov 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf2 Nov 2017
Declaration in FORM BFile: Form B - B3-B4,D1-D4-new.pdf25 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate of Architect - B3-B4,D1-D4.pdf24 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate of Engineer - B3-B4, D1-D4.pdf24 Jul 2017
Certificates of CA (Form 3)File: Certificate of CA - B3-B4,D1-D4.pdf24 Jul 2017
Proforma of Allotment letterFile: Proforma of the allotment letter and agreement to sale - B3-B4,D1-D4.pdf24 Jul 2017
Building plan approvalFile: B3-B4 - 1.pdf20 Jul 2017
Building plan approvalFile: D1-D4 - 1.pdf20 Jul 2017
Building plan approvalFile: B3-B4 - 2.pdf20 Jul 2017
Building plan approvalFile: D1-D4 - 2.pdf20 Jul 2017
Layout approvalFile: Layout - B 3-B4, D1 - D4.pdf20 Jul 2017
PAN CardFile: HSPPL Pan Card (1).pdf20 Jul 2017
Copy of the legal title reportFile: Legal Title Report.pdf20 Jul 2017
Details of encumbrancesFile: PH 1 - Encumbrance Certificate.pdf20 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout - B 3-B4, D1 - D4.pdf20 Jul 2017
Building Plan Approval (IOD)File: B3-B4 - 1.pdf20 Jul 2017
Building Plan Approval (IOD)File: D1-D4 - 1.pdf20 Jul 2017
Building Plan Approval (IOD)File: B3-B4 - 2.pdf20 Jul 2017
Building Plan Approval (IOD)File: D1-D4 - 2.pdf20 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Phase 1 NA order.pdf20 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 4 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Westernhills B 3 - B 4, D 1 - D 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sus13,700+ in Pune

2 kmWesternhills B 3 - B 4, Completed 117Lapsed / revoked 37Other 75Dot size: filed unitsN

Filed coordinates, straight-line distance. 229 registered projects within 2 km.

Builder: Promoter name not stated in filing

The filing does not name a promoter organisation for this registration. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Westernhills B 3 - B 4, D 1 - D 4 is delayed beyond 18 Jul 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Westernhills B 3 - B 4, D 1 - D 4?

The registered promoter entity is Promoter name not stated in filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Westernhills B 3 - B 4, D 1 - D 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Westernhills B 3 - B 4, D 1 - D 4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Westernhills B 3 - B 4, D 1 - D 4?

The professionals named in the filing: Architect: Milind Saraf Proprietor of Subha Architects; Engineer: Sunil Mutalik. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Westernhills B 3 - B 4, D 1 - D 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Westernhills B 3 - B 4, D 1 - D 4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Westernhills B 3 - B 4, D 1 - D 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.