Home / Browse projects / Pune, Maharashtra / WEST VIEW
WEST VIEW
RG-MH-23332 · RERA P52100078640 · Last updated on MahaRERA portal: 13 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 100.00 crore secured on the land, in favour of Aditya Birla Capital Limited
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
WEST VIEW is a Residential / Group Housing project by CITY ETHERNAL LLP in Pune, Maharashtra, registered with MahaRERA as P52100078640 on 30 Dec 2024. Possession is promised by 30 Sep 2029. 27 of the 89 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.
At a glance
Project
- NameWEST VIEW
- TypeResidential / Group Housing
- Location
- SALISBURY PARK ROAD
- SALISBURY PARK
- Gultekadi
- Haveli
- Pune
- 411037
- Pincode411037
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100078640
- ReraGenie IDRG-MH-23332
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on30 Dec 2024
- Promised completion30 Sep 2029
- Revised completionNone
- Buildings1 building record
- Documents filed88 files
Current status
Figures as on 13 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A and B Wing | NA | 22 | 17 | 89 | 0 | 89 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 13 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 70%.
A and B Wing: 30% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 70% |
| Podiums (if any) | 70% |
| Plinth | 0% |
| Stilt Floor | 70% |
| Slabs of Super Structure | 20% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 13 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed241
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| THE WEST VIEW CO OP HOUSING SOCIETY LTD | Gultekadi | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A and B Wing | NA | Rs 50.32 cr | Rs 16.69 cr |
| - | NA | Rs 1.03 cr | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VK a Architecture |
| Engineer | SK Consultants & Engineers |
| Engineer | Sridhar Dixit |
| Chartered Accountant | N B Sayed & Associates |
| Partner | Role in project |
|---|---|
| CITY ETHERNAL LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Nov 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Apr 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Sep 2029
Documents filed88
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 - West View as on June 2026.pdf | 13 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 - West View as on June 2026.pdf | 13 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 - West View as on June 2026.pdf | 13 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 - West View as on June 2026.pdf | 20 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 - West View as on June 2026.pdf | 20 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 - West View as on June 2026.pdf | 20 Jul 2026 |
| Form 2A (FY 2025-2026)File: FORM 2A - WEST VIEW FOR 2025-26.pdf | 22 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 - West View as on March 2026.pdf | 15 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 - West View as on March 2026.pdf | 15 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 - West View as on March 2026.pdf | 15 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 - West View as on March 2026.pdf | 15 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 - West View as on March 2026.pdf | 15 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 - West View as on March 2026.pdf | 15 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 - West View as on March 2026.pdf | 15 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 - West View as on March 2026.pdf | 15 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 - West View as on March 2026.pdf | 15 Apr 2026 |
| Form 1File: Form 1 - West View as on Dec 2025.pdf | 22 Jan 2026 |
| Form 2File: Form 2 - West View as on Dec 2025.pdf | 22 Jan 2026 |
| Form 3File: Form 3 - West View as on Dec 2025.pdf | 22 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - West View as on Dec 2025.pdf | 22 Jan 2026 |
| Form 1File: Form 1 - West View as on Sept 2025.pdf | 22 Oct 2025 |
| Form 2File: Form 2 - West View as on Sept 2025.pdf | 22 Oct 2025 |
| Form 3File: Form 3 - West View as on Sept 2025.pdf | 22 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - West View as on Sept 2025.pdf | 22 Oct 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 3 FORM 2A 31032025.pdf | 21 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 1 DISCLOSURE OF SOLD INVENTORY.pdf | 17 Apr 2025 |
| Layout approvalFile: Sanctioned Layout.pdf | 14 Apr 2025 |
| Building plan approvalFile: 1 Building Approval.pdf | 14 Apr 2025 |
| Building plan approvalFile: 2 Building Approval.pdf | 14 Apr 2025 |
| Building plan approvalFile: 3 Building Approval.pdf | 14 Apr 2025 |
| Building plan approvalFile: 4 Building Approval.pdf | 14 Apr 2025 |
| Building plan approvalFile: 5 Building Approval.pdf | 14 Apr 2025 |
| Building plan approvalFile: 6 Building Approval.pdf | 14 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: Sanctioned Layout.pdf | 14 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate dtd 01042025.pdf | 14 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate dtd 31032025.pdf | 14 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate dtd 31032025.pdf | 14 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 14 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 Building Approval.pdf | 14 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 2 Building Approval.pdf | 14 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 3 Building Approval.pdf | 14 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 4 Building Approval.pdf | 14 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 5 Building Approval.pdf | 14 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 6 Building Approval.pdf | 14 Apr 2025 |
| Other - FinanceFile: RERA Account Declaration.pdf | 20 Dec 2024 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION - AFS 29-11-24_Optimized part 2.pdf | 4 Dec 2024 |
| Copy of the legal title reportFile: RERA TITLE REPORT.pdf | 22 Nov 2024 |
| Copy of the legal title reportFile: Format A_Flow of Title.pdf | 22 Nov 2024 |
| Copy of the legal title reportFile: Search and Title Report.pdf | 22 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: Declaration - Financial Encumbrances.pdf | 22 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: Declaration - Legal Encumbrances.pdf | 22 Nov 2024 |
| Details of encumbrances concerned to LegalFile: Declaration - Financial Encumbrances.pdf | 22 Nov 2024 |
| Details of encumbrances concerned to LegalFile: Declaration - Legal Encumbrances.pdf | 22 Nov 2024 |
| Other - TechnicalFile: Annexure A_Declaration Order no 50.pdf | 12 Nov 2024 |
| Proforma of Agreement for saleFile: Agreement for Sale FINAL 20-12-2024.pdf | 9 Nov 2024 |
| Building plan approvalFile: 06 Building Plan Approval_8.pdf | 8 Nov 2024 |
| Building plan approvalFile: 06 Building Plan Approval_7.pdf | 8 Nov 2024 |
| Building plan approvalFile: 06 Building Plan Approval_6.pdf | 8 Nov 2024 |
| Building plan approvalFile: 06 Building Plan Approval_5.pdf | 8 Nov 2024 |
| Building plan approvalFile: 06 Building Plan Approval_4.pdf | 8 Nov 2024 |
| Building plan approvalFile: 06 Building Plan Approval_3.pdf | 8 Nov 2024 |
| Building plan approvalFile: 06 Building Plan Approval_2.pdf | 8 Nov 2024 |
| Layout approvalFile: 05 Layout Approval.pdf | 8 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: 05 Layout Approval.pdf | 8 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - CACERTIFIACTE 03-12-24.pdf | 8 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 06 Building Plan Approval_5.pdf | 8 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 06 Building Plan Approval_2.pdf | 8 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 06 Building Plan Approval_3.pdf | 8 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 06 Building Plan Approval_4.pdf | 8 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 06 Building Plan Approval_6.pdf | 8 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 06 Building Plan Approval_7.pdf | 8 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 06 Building Plan Approval_8.pdf | 8 Nov 2024 |
| Deviation Report with respect to Allotment letterFile: DEVIATION - ALLOTMENT LETTER 29-11-24.pdf | 8 Nov 2024 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION - AFS 29-11-24 part 1_Optimized.pdf | 8 Nov 2024 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER FOR NEW PURCHASER 29-11-2024.pdf | 16 Oct 2024 |
| Declaration about Commencement CertificateFile: 08 DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf | 14 Oct 2024 |
| Building plan approvalFile: 06 Building Plan Approval.pdf | 11 Oct 2024 |
| Declaration in FORM BFile: 09 Form B - Promoter Declaration.pdf | 11 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 FORM 01 - Architect Certificate.pdf | 11 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 Form 02 - Engineer's Certificate.pdf | 11 Oct 2024 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| White House BPC1260002501754 | Yerawada, Pune | 35 | Dec 2025 | Ongoing | Feb 2031 | Not due yet |
| White House APR1260002501620 | Pune (M Corp.), Pune | 105 | Nov 2025 | Ongoing | Feb 2031 | Not due yet |
| SARASNAGARPR1260002500761 | Pune (M Corp.), Pune | 56 | Sep 2025 | Ongoing | Dec 2030 | Not due yet |
| MayfairPR1260002500776 | Pune (M Corp.), Pune | 17 | Sep 2025 | Ongoing | Dec 2030 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 88 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep WEST VIEW on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SALISBURY PARK13,700+ in Pune
Filed coordinates, straight-line distance. 147 registered projects within 2 km.
MAHA TRADE MARKET PH- 2
JAIRAJ REALTY LLP
MAHA TRADE MARKET PH- 1
JAIRAJ REALTY LLP
SOLITAIRE BUSINESS HUB PHASE I, SOLITAIRE WORL
Classic Promoters and Builders Private Lim
SOLITAIRE BUSINESS HUB PHASE II, SOLITAIRE WOR
Classic Promoters and Builders Private Lim
World One Solitaire World
Classic Promoters and Builders Private Lim
HILL TOWN A B AND C WING
HILL TOWN CONSTRUCTIONS
Builder: CITY ETHERNAL LLP
CITY ETHERNAL LLP has 6 registrations on MahaRERA, including WEST VIEW and SARASNAGAR. Its filings disclose 5 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if WEST VIEW is delayed beyond 30 Sep 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of WEST VIEW?
The registered promoter entity is CITY ETHERNAL LLP, a partnership as per the filing. Its LLPIN ABZ-3227 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in WEST VIEW?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for WEST VIEW?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at WEST VIEW?
The professionals named in the filing: Architect: VK a Architecture; Engineer: SK Consultants & Engineers; Engineer: Sridhar Dixit; Chartered Accountant: N B Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in WEST VIEW?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback