SOLITAIRE BUSINESS HUB PHASE I, SOLITAIRE WORLD
By Classic Promoters and Builders Private Limited
RG-MH-56612 · RERA P52100017521 · Last updated on MahaRERA portal: 20 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 6 complaints at MahaRERA
- Completion date moved by 42 months
- 3 extensions taken
- Encumbrance declared on the project land, in favour of Union Bank Of India
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SOLITAIRE BUSINESS HUB PHASE I, SOLITAIRE WORLD is a Commercial project by Classic Promoters and Builders Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100017521 on 23 Aug 2018. Possession is promised by 31 Dec 2026. The completion date has moved by 42 months from the original filing. 132 of the 252 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 6 complaints are on record with the regulator.
At a glance
Project
- NameSOLITAIRE BUSINESS HUB PHASE I, SOLITAIRE WORLD
- TypeCommercial
- Location
- 578/1/2+578/1/3 BIBWEWADI
- BIBWEWADI
- Pune (M Corp.)
- Pune City
- Pune
- 411037
- Pincode411037
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100017521
- ReraGenie IDRG-MH-56612
Builder
- NameClassic Promoters and Builders Private Limited
- Entity typeCompany
- CINU70101MH1988PTC047131
- GSTIN27AABCC1200C1ZN
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Managing DirectorAshok Dhanraj Chordia
- Other registrations14 more →
- Completed4 of 15
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on23 Aug 2018
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2023)
- Buildings1 building record
- Documents filed477 files
Current status
Figures as on 20 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING 1 - 3rd Floor to 7th Floor | NA | 5 | 5 | 0 | 252 | 252 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 92%.
BUILDING 1 - 3rd Floor to 7th Floor: 63% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 92% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 83% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 78% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 42% |
Progress on shared amenities15
As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1688
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| M/S SHAH PROMOTERS AND DEVELOPERS | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING 1 - 3rd Floor to 7th Floor | NA | Rs 83.62 cr | Rs 70.18 cr |
| - | NA | Rs 13.32 cr | Rs 9.73 cr |
Certifying professionals and partners13
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Fourth Dimension Architect Private Limited |
| Architect | Venkataramanan Associates |
| Engineer | Shivprasad Kale |
| Engineer | Anant Kulkarni |
| Engineer | Sushil Bhoi |
| Engineer | Pranav Patil |
| Engineer | Devanand Amale |
| Engineer | Swapnil Sonawane |
| Engineer | Mr. Umesh Joshi |
| Chartered Accountant | SPAK & Co |
| Chartered Accountant | Bogati & Co. |
| Chartered Accountant | GMKS & Co. |
| Partner | Role in project |
|---|---|
| Classic Promoters and Builders Private Limited | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterdue to the covid 19 pandemic, we were not able to construct anymore because of lack of labour contractors and the poor market conditions we were unable to complete the project within the due time.
Reason as filed by the promoterWe are developing a Commercial Project under the name and style “Solitaire Business Hub Phase 1 -Solitaire World” It is stated that the construction and development of the said Project started as per the timelines under RERA. However, the Project got delayed due to the following factors/challenges viz., i. Effect of Covid-19 pandemic, wherein the Government declared nationwide lockdown entire nation suffered a global pandemic i.e., Covid-19 pandemic and various circular orders were passed due to which the construction and development of the said Project stalled, we faced several challenges tha
Reason as filed by the promoterAs per order of the Hon'ble Chairman (MahaRERA) Dated 02/01/2026. we request you kindly to grant us extension till 31/12/2026.
Complaints filed with MahaRERA6
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000411093 | RAJENDRA SHAHCHAND LALWANI | CLASSIC PROMOTERS AND BUILDERS | 02/07/2024 |
| CC005000000441120 | TARACHAND JAGDISH UNECHA | CLASSIC PROMOTERS AND BUILDERS PVT LTD | 12/06/2024 |
| CC12602621 | Kapil Kedarnath Kasat | Classic Promoters and Builders Private Limited | 05/05/2026 |
| CC12603194 | Sunil Anilkumar Bhatt | Classic Promoters and Builders Private Limited | 28/05/2026 |
| CC12603195 | Sunil Anilkumar Bhatt | Classic Promoters and Builders Private Limited | 28/05/2026 |
| CC12603658 | TROPICAL AGRO SYSTEM INDIA PRIVATE LIMITED THROUGH ITS AUTHORISED SIGNATORY MR SANTOSH BHUTADA | Classic Promoters and Builders Private Limited | 13/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Oct 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Nov 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed477
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 477 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 - SBH -PH - I-SW- Jun 26.pdf | 20 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 - SBH PH - I - Jun 26.pdf | 20 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 - SBH PH - I - Jun 26.pdf | 20 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A SBH PH I - Mar 26.pdf | 21 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 - SBH PH - I - Mar 26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 SBH PH I - Mar 26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 SBH PH I - Mar 26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 - SBH PH - I - Dec 2025.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 - SBH PH I - Dec 2025.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 - SBH PH I - Dec 2025.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 - SBH PH I - Sept 2025.pdf | 18 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 - SBH PH I - Sept 2025.pdf | 18 Oct 2025 |
| Withdrawal Update Form 3File: Form 3- SBH PH I - Sept 2025.pdf | 18 Oct 2025 |
| Form 5 (FY 2024-2025)File: SBH PH I -Form 5-FY 24-25.pdf | 30 Sep 2025 |
| Withdrawal Update Form 1File: Form 1 SBH PH 1 Jun-25.pdf | 22 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 SBH PH I- Jun-25.pdf | 22 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 - SBH PH I - Jun 25.pdf | 22 Jul 2025 |
| Withdrawal Update Form 1File: Form 1 SBH PH 1 Jun-25.pdf | 21 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 SBH PH I- Jun-25.pdf | 21 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 - SBH PH I - Jun 25.pdf | 21 Jul 2025 |
| Withdrawal Update Form 1File: Form 1 - SBH PH I - Mar 25.pdf | 10 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 - SBH PH I - Mar 25.pdf | 10 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 - SBH PH I - Mar 25.pdf | 10 Jul 2025 |
| Withdrawal Update Form 1File: Form 1 - SBH PH I - Mar 25.pdf | 8 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 - SBH PH I - Mar 25.pdf | 8 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 - SBH PH I - Mar 25.pdf | 8 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - SBH PH I - Mar 25.pdf | 26 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 - SBH PH I - Mar 25_compressed.pdf | 26 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - SBH PH I - Mar 25.pdf | 26 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Disclosure - SBH I - Mar 24.pdf | 26 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Disclosure - SBH PH I - Mar 25.pdf | 26 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - SBH PH I - SW - Mar 25.pdf | 26 Apr 2025 |
| Declaration in FORM BFile: SBH PH I - Revised form B.pdf | 29 Mar 2025 |
| Other - TechnicalFile: 1 SBH PH I - BAR Chart RERA Timeline as on date.pdf | 29 Mar 2025 |
| Other - TechnicalFile: 1SBH PH I - BAR Chart.pdf | 29 Mar 2025 |
| Details of encumbrancesFile: SBH I Encumbrances-14-2-25 Capri.pdf | 15 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 - SBH PH I - Dec 24.pdf | 20 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - SBH PH I - Dec 24.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: SOld Disclsoure - SBH PH I - Bldg - 1 - Dec 24.pdf | 20 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - SBH PH I - Dec 24.pdf | 18 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SBH PH I - SW - FY 23-24 - Form 5.pdf | 13 Dec 2024 |
| Certificates of CA (Form 3)File: SBH PH I Form 3.pdf | 10 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - SBH PH I - Sept 2024.pdf | 21 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Discloure - SBH I SW - Sept 2024.pdf | 19 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- SBH PH I - Jun 2024.pdf | 20 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineer certificate-SW-SBH-1.pdf | 20 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-SBH I- Mar 24.pdf | 20 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- SBH PH I - June24.pdf | 20 Aug 2024 |
| Certificates of CA (Form 3)File: SBH I_Form 3 dec23.pdf | 20 Aug 2024 |
| Certificates of CA (Form 3)File: Form 3- SBH PH - I - Mar 24.pdf | 20 Aug 2024 |
| Certificates of CA (Form 3)File: Form 3- SBH PH I - Jun 24.pdf | 20 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: SBH Phase 1 Solitaire World 3rd to 7th Floor.pdf | 31 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 - Mar 24 - SBH I.pdf | 18 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A - Mar 24 - SBH I.pdf | 18 May 2024 |
| Disclosure of sold/ booked inventoryFile: SBH I Dec 23 Sold Disclosure.pdf | 20 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- SBH PH I - Dec 23.pdf | 17 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: From 2A - SBH I - Dec 23.pdf | 8 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- SBH PH I - Sept 2023 Signed.pdf | 23 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Form 1 SBH 1 Sep 2022.pdf | 15 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 Form 1 SBH PH I Sept 2023.pdf | 15 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 Form 2 SBH I June 23.pdf | 15 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Form 2 SBH I Sept 23.pdf | 15 Dec 2023 |
| Certificates of CA (Form 3)File: 1 Form 3 SBH Phase 1 Aug 2019.pdf | 15 Dec 2023 |
| Certificates of CA (Form 3)File: 2 Form 3 SBH 1 May 2020.pdf | 15 Dec 2023 |
| Certificates of CA (Form 3)File: 3 Form 3 SBH 1 March 2022.pdf | 15 Dec 2023 |
| Certificates of CA (Form 3)File: 4 Form 3 SBH 1 Jun 2022.pdf | 15 Dec 2023 |
| Certificates of CA (Form 3)File: 5 Form 3 SBH 1 Sep 2022.pdf | 15 Dec 2023 |
| Certificates of CA (Form 3)File: 6 Form 3 SBH 1 Dec 2022.pdf | 15 Dec 2023 |
| Certificates of CA (Form 3)File: 7 Form 3 SBH Phase 1 March 2023.pdf | 15 Dec 2023 |
| Certificates of CA (Form 3)File: 8 Form 3 SBH Phase 1 June 2023.pdf | 15 Dec 2023 |
| Certificates of CA (Form 3)File: 9 Form 3 SBH Phase 1 Sept 2023.pdf | 15 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: SBH PH I - Sept 23 Sold Disclosure.pdf | 20 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - SBH PH - I FY 22-23.pdf | 13 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- SBH PH I - Sept 2023.pdf | 9 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: From 2A - SBH PH I - Sept 2023.pdf | 6 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: SBH PH I Jun 23 Sold Disclosure.pdf | 26 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 SBH PH I.pdf | 14 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A SBH-I SW.pdf | 14 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: SBH Phase_1_SW_March23.pdf | 11 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 March2022.pdf | 22 Apr 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Avalon C-3 | Pimpri Chinchwad Pune 411012 | 47 | Completed | Dec 2019 | Late, Feb 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 14 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 477 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SOLITAIRE BUSINESS HUB PHASE I, SOLITAIRE WO on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BIBWEWADI13,700+ in Pune
Filed coordinates, straight-line distance. 126 registered projects within 2 km.
MAHA TRADE MARKET PH- 2
JAIRAJ REALTY LLP
MAHA TRADE MARKET PH- 1
JAIRAJ REALTY LLP
SOLITAIRE BUSINESS HUB PHASE II, SOLITAIRE WOR
Classic Promoters and Builders Private Lim
World One Solitaire World
Classic Promoters and Builders Private Lim
HILL TOWN A B AND C WING
HILL TOWN CONSTRUCTIONS
WORLD THREE - SOLITAIRE WORLD
Classic Promoters and Builders Private Lim
Builder: Classic Promoters and Builders Private Limited
Classic Promoters and Builders Private Limited has 15 registrations on MahaRERA, including AVALON CITY C-3 and MUDRA. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SOLITAIRE BUSINESS HUB PHASE I, SOLITAIRE WORLD is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SOLITAIRE BUSINESS HUB PHASE I, SOLITAIRE WORLD?
The registered promoter entity is Classic Promoters and Builders Private Limited, a company as per the filing. Its CIN U70101MH1988PTC047131 and GSTIN 27AABCC1200C1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SOLITAIRE BUSINESS HUB PHASE I, SOLITAIRE WORLD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SOLITAIRE BUSINESS HUB PHASE I, SOLITAIRE WORLD?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SOLITAIRE BUSINESS HUB PHASE I, SOLITAIRE WORLD?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SOLITAIRE BUSINESS HUB PHASE I, SOLITAIRE WORLD?
The professionals named in the filing: Architect: Fourth Dimension Architect Private Limited; Architect: Venkataramanan Associates; Engineer: Shivprasad Kale; Engineer: Anant Kulkarni; Engineer: Sushil Bhoi; Engineer: Pranav Patil. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SOLITAIRE BUSINESS HUB PHASE I, SOLITAIRE WORLD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback