Home / Browse projects / Pune, Maharashtra / HILL TOWN A B AND C WING
HILL TOWN A B AND C WING
RG-MH-95922 · RERA P52100017231 · Last updated on MahaRERA portal: 10 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 2 complaints at MahaRERA
- Completion date moved by 41 months
- 2 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
HILL TOWN A B AND C WING is a Others project by HILL TOWN CONSTRUCTIONS in Pune, Maharashtra, registered with MahaRERA as P52100017231 on 24 Jul 2018. Possession is promised by 31 Dec 2026. The completion date has moved by 41 months from the original filing. 108 of the 174 units on this registration are recorded sold or booked, and 26 of 33 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameHILL TOWN A B AND C WING
- TypeOthers
- Location
- UNDRI PISOLI ROAD
- NEAR KHADI MACHINE CHOWK
- kondhwa BK
- Haveli
- Pune
- 411037
- Pincode411037
- RERA no.P52100017231
- ReraGenie IDRG-MH-95922
Builder
- NameHILL TOWN CONSTRUCTIONS
- Entity typePartnership
- PartnersRAJJAK AHMED MULANI, SOHAIL RAJJAK MULANI, KALPANA HANUMANT KEMDHARE
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on24 Jul 2018
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 22 Jul 2023)
- Buildings3 building records
- Documents filed219 files
Current status
Figures as on 10 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 14 | 11 | 40 | 14 | 54 |
| B WING | NA | 14 | 11 | 40 | 14 | 54 |
| C WING | NA | 14 | 11 | 66 | 0 | 66 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 10 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
26 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 95%.
A WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C WING81%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 10% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 10 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | Yes | 80% |
| Street Lighting | Yes | 65% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 63% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 30% |
| Electrical meter room, sub-station, receiving station | Yes | 75% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 50% |
Parking filed2
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A WING | 1 | 1 |
| B WING | 1 | 1 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A WING | NA | Rs 34.55 cr | Rs 32.82 cr |
| B WING | NA | Rs 34.55 cr | Rs 32.82 cr |
| C WING | NA | Rs 34.55 cr | Rs 32.82 cr |
| - | NA | Rs 24.98 cr | Rs 23.73 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PARVEJ jamadar |
| Engineer | KEDAR PHADNIS |
| Engineer | AKSHAY AGHOR |
| Engineer | mohammad shaikh |
| Chartered Accountant | PANDURANGPAWAR |
| Chartered Accountant | sameer shaikh |
| Chartered Accountant | SGKALE ANDCO |
| Partner | Role in project |
|---|---|
| HILL TOWN CONSTRUCTIONS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWE HILL TOWN CONSTRUCTION APPLYING FOR CONSTRUCTION LOAN FROM BANK SO WE WOUD LIKE TO REQUEST YOU TO PLEASE GRANTING AN EXTENTION FROM THE ORIGINAL DEADLINE OF 22ND JULY 2023 TO 30TH JULY 2025.
Reason as filed by the promoterDue to delays caused by material shortages, labor shortages, and insufficient funding, the project has been delayed. However, with the funding now available, we kindly request an extension until 31/12/2026 to complete the project “In this project, the Occupancy Certificate for Buildings A and B has been received. Only an extension is required for Building C.”
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000085392 | RAMESH MEHTA | HILL TOWN CONSTRUCTIONS | 01/04/2021 |
| CC005000000290282 | Hasnain Rafiq Jafrani | Hill Town Constructions | 02/02/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Oct 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Feb 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Jul 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 16 Jul 2025
Documents filed219
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 219 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: FORM 2 A.PDF | 10 Jul 2026 |
| Form 5 (FY 2025-2026)File: form 5.pdf | 7 Jul 2026 |
| Withdrawal Update Form 1File: form 1.pdf | 21 Apr 2026 |
| Withdrawal Update Form 2File: engineer certificate.pdf | 21 Apr 2026 |
| Withdrawal Update Form 3File: form 3.pdf | 21 Apr 2026 |
| Withdrawal Update Form 1File: form 1 (3).pdf | 14 Mar 2026 |
| Withdrawal Update Form 2File: form 2 (4).pdf | 14 Mar 2026 |
| Withdrawal Update Form 3File: form 3 (12).pdf | 14 Mar 2026 |
| Withdrawal Update Form 1File: FORM1.pdf | 5 Nov 2025 |
| Withdrawal Update Form 2File: FORM2.pdf | 5 Nov 2025 |
| Withdrawal Update Form 3File: F3.pdf | 5 Nov 2025 |
| Form 2A (FY 2024-2025)File: form 2a.pdf | 5 Nov 2025 |
| Form 5 (FY 2024-2025)File: f5.pdf | 5 Nov 2025 |
| Form 1File: FORM1.pdf | 30 Oct 2025 |
| Form 2File: FORM2.pdf | 30 Oct 2025 |
| Form 3File: form 3.pdf | 30 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: sold Unsold1.pdf | 30 Oct 2025 |
| Building plan approvalFile: scan0795_1_11zon.pdf | 17 Jul 2025 |
| Building plan approvalFile: scan0796_2_11zon.pdf | 17 Jul 2025 |
| Building plan approvalFile: scan0797_3_11zon.pdf | 17 Jul 2025 |
| Building plan approvalFile: scan0798_4_11zon.pdf | 17 Jul 2025 |
| Building plan approvalFile: scan0799_5_11zon.pdf | 17 Jul 2025 |
| Building plan approvalFile: scan0800_6_11zon.pdf | 17 Jul 2025 |
| Building plan approvalFile: scan0801_7_11zon.pdf | 17 Jul 2025 |
| Building plan approvalFile: scan0802_8_11zon.pdf | 17 Jul 2025 |
| Building plan approvalFile: scan0804_10_11zon.pdf | 17 Jul 2025 |
| Building plan approvalFile: scan0805_11_11zon.pdf | 17 Jul 2025 |
| Building plan approvalFile: scan0806_12_11zon.pdf | 17 Jul 2025 |
| Building plan approvalFile: scan0816_13_11zon.pdf | 17 Jul 2025 |
| Building plan approvalFile: scan0817_14_11zon.pdf | 17 Jul 2025 |
| Building plan approvalFile: scan0818_15_11zon.pdf | 17 Jul 2025 |
| Building plan approvalFile: scan0819_16_11zon.pdf | 17 Jul 2025 |
| Building plan approvalFile: scan0820_17_11zon.pdf | 17 Jul 2025 |
| Building plan approvalFile: scan0823_18_11zon.pdf | 17 Jul 2025 |
| Building plan approvalFile: scan0833_19_11zon.pdf | 17 Jul 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: scan0803_9_11zon.pdf | 17 Jul 2025 |
| Building Plan Approval (IOD)File: scan0795_1_11zon.pdf | 17 Jul 2025 |
| Building Plan Approval (IOD)File: scan0833_19_11zon.pdf | 17 Jul 2025 |
| Building Plan Approval (IOD)File: scan0823_18_11zon.pdf | 17 Jul 2025 |
| Building Plan Approval (IOD)File: scan0820_17_11zon.pdf | 17 Jul 2025 |
| Building Plan Approval (IOD)File: scan0819_16_11zon.pdf | 17 Jul 2025 |
| Building Plan Approval (IOD)File: scan0818_15_11zon.pdf | 17 Jul 2025 |
| Building Plan Approval (IOD)File: scan0817_14_11zon.pdf | 17 Jul 2025 |
| Building Plan Approval (IOD)File: scan0816_13_11zon.pdf | 17 Jul 2025 |
| Building Plan Approval (IOD)File: scan0806_12_11zon.pdf | 17 Jul 2025 |
| Building Plan Approval (IOD)File: scan0805_11_11zon.pdf | 17 Jul 2025 |
| Building Plan Approval (IOD)File: scan0804_10_11zon.pdf | 17 Jul 2025 |
| Building Plan Approval (IOD)File: scan0802_8_11zon.pdf | 17 Jul 2025 |
| Building Plan Approval (IOD)File: scan0801_7_11zon.pdf | 17 Jul 2025 |
| Building Plan Approval (IOD)File: scan0800_6_11zon.pdf | 17 Jul 2025 |
| Building Plan Approval (IOD)File: scan0799_5_11zon.pdf | 17 Jul 2025 |
| Building Plan Approval (IOD)File: scan0798_4_11zon.pdf | 17 Jul 2025 |
| Building Plan Approval (IOD)File: scan0797_3_11zon.pdf | 17 Jul 2025 |
| Building Plan Approval (IOD)File: scan0796_2_11zon.pdf | 17 Jul 2025 |
| Declaration about Commencement CertificateFile: COMMENCEMENT.pdf | 17 Jul 2025 |
| Other - TechnicalFile: rera extension letter.pdf | 17 Jul 2025 |
| Other - TechnicalFile: Maharera Letter-1.pdf | 17 Jul 2025 |
| Other - LegalFile: 18191-2020.pdf | 16 Jul 2025 |
| Other - LegalFile: 11533-2020.pdf | 16 Jul 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART OC A B WING.pdf | 16 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 07-04-2025_ Arch certificate_New format-Form 1 (1).pdf | 2 Jul 2025 |
| Certificates of CA (Form 3)File: form3.pdf | 2 Jul 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Akshay bhaskara o aghor form 2 (1).pdf | 2 Jul 2025 |
| Proforma of Agreement for saleFile: allotment of flat draft agreement-compressed_11zon.pdf | 8 Apr 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMATE A.pdf | 8 Apr 2024 |
| Other - TechnicalFile: AXIS BANK CLOSURE LETTER.pdf | 8 Apr 2024 |
| Other - TechnicalFile: BANK ACCOUNT CHANGE LETTER.pdf | 8 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 7 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 engineer certificate_compressed.pdf | 7 Mar 2024 |
| Certificates of CA (Form 3)File: form3 jan24-compressed.pdf | 7 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 7 Mar 2024 |
| Other - TechnicalFile: bank account changes.pdf | 7 Mar 2024 |
| Other - TechnicalFile: bank account changes.pdf | 7 Mar 2024 |
| Other - TechnicalFile: ANNEXURE A.pdf | 7 Mar 2024 |
| Other - LegalFile: constitution of partnership ded.pdf | 14 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: form b on stamp paper-1.pdf | 13 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: form b on letter head-1.pdf | 13 Sep 2023 |
| Details of encumbrances concerned to LegalFile: form b on stamp paper-1.pdf | 13 Sep 2023 |
| Details of encumbrances concerned to LegalFile: form b on letter head-1.pdf | 13 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5 18 19_compressed.pdf | 13 Sep 2023 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| HAMY CAPITALP52100017020 | DHANKAWADI, Pune | 32 | Jul 2018 | Completed | Jun 2022 | Late, Jan 2023 |
| RICH COUNTY- C & D WINGP52100006337 | PUNE, Pune | - | Aug 2017 | Completed | Dec 2021Registered original: Jun 2019 | Dec 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- All 219 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep HILL TOWN A B AND C WING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR KHADI MACHINE CHOWK13,700+ in Pune
MAHA TRADE MARKET PH- 2
JAIRAJ REALTY LLP
MAHA TRADE MARKET PH- 1
JAIRAJ REALTY LLP
SOLITAIRE BUSINESS HUB PHASE I, SOLITAIRE WORL
Classic Promoters and Builders Private Lim
SOLITAIRE BUSINESS HUB PHASE II, SOLITAIRE WOR
Classic Promoters and Builders Private Lim
World One Solitaire World
Classic Promoters and Builders Private Lim
WORLD THREE - SOLITAIRE WORLD
Classic Promoters and Builders Private Lim
Builder: HILL TOWN CONSTRUCTIONS
HILL TOWN CONSTRUCTIONS has 1 registration on MahaRERA, including HILL TOWN A B AND C WING. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if HILL TOWN A B AND C WING is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of HILL TOWN A B AND C WING?
The registered promoter entity is HILL TOWN CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in HILL TOWN A B AND C WING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against HILL TOWN A B AND C WING?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for HILL TOWN A B AND C WING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at HILL TOWN A B AND C WING?
The professionals named in the filing: Architect: PARVEJ jamadar; Engineer: KEDAR PHADNIS; Engineer: AKSHAY AGHOR; Engineer: mohammad shaikh; Chartered Accountant: PANDURANGPAWAR; Chartered Accountant: sameer shaikh. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HILL TOWN A B AND C WING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.