ReraGenieLog inGet a buyer report

Home / Browse projects / Aurangabad, Maharashtra / VYANKATESH PRIDE

Completed No litigation declared Residential / Group Housing project

VYANKATESH PRIDE

By MADHURA DEVELOPERS

RG-MH-00690 · RERA P51500002419 · Last updated on MahaRERA portal: 13 Jan 2020

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Sep 2019Possession promisedregistration recorded completed
12 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 75%
0Complaints at MahaRERAon this registration
Jump to the 24 documents Report an error

VYANKATESH PRIDE is a Residential / Group Housing project by MADHURA DEVELOPERS in Aurangabad, Maharashtra, registered with MahaRERA as P51500002419 on 1 Aug 2017. The registration is recorded completed; possession was promised by 30 Sep 2019.

At a glance

Project

  • NameVYANKATESH PRIDE
  • TypeResidential / Group Housing
  • Location
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431003
  • Pincode431003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500002419
  • ReraGenie IDRG-MH-00690

Builder

  • NameMADHURA DEVELOPERS
  • Entity typePartnership
  • PartnersMANOJ PANDHARINATH GADEKAR, RAHUL SUDAM AUTADE

Key dates

this monthRegisteredAug 2017PromisedSep 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Aug 2017
  • Promised completion30 Sep 2019
  • Revised completionNone
  • Buildings3 building records
  • Documents filed24 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A TYPE BUILDINGNA60000
B TYPE BUILDINGNA40000
C AND C-1 TYPE BUILDINGNA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 13 Jan 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 75%.

A TYPE BUILDING57%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%
B TYPE BUILDING60%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises35%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%
C AND C-1 TYPE BUILDING60%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises35%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%

Progress on shared amenities15

As on 13 Jan 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes20%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,200 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2200.0
Proposed, not sanctioned1,980 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHUDCO AURANGABAD

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPankaj Sudhakar Vyawahare
EngineerPRADEEP VITTHALRAO MOTE
PartnerRole in project
MADHURA DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed24

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Vyankatesh Pride.pdf13 Jan 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Madhura Form 5 2019_compressed.pdf2 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg March 2019_compressed.pdf3 Oct 2019
Certificates of CA (Form 5)File: Madhura Form 5 2019_compressed.pdf3 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate.pdf30 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate.pdf30 Oct 2018
Certificates of CA (Form 5)File: Form 5.pdf22 Oct 2018
Certificates of CA (Form 3)File: FormIII_CACertificate_Madhuradevelopers.pdf31 Jul 2017
Layout approvalFile: TotalLayout1.pdf29 Jul 2017
Building plan approvalFile: AType_Building1.pdf29 Jul 2017
Building plan approvalFile: BType_Building1.pdf29 Jul 2017
Building plan approvalFile: CType_Building.pdf29 Jul 2017
PAN CardFile: PAN_M'Developers.pdf29 Jul 2017
Copy of the legal title reportFile: Title_SearchReport_M'Developers.pdf29 Jul 2017
Details of encumbrancesFile: Certificate_Advocate.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: TotalLayout1.pdf29 Jul 2017
Building Plan Approval (IOD)File: AType_Building1.pdf29 Jul 2017
Building Plan Approval (IOD)File: BType_Building1.pdf29 Jul 2017
Building Plan Approval (IOD)File: CType_Building.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Permission_CommencementCertificate_M'Developers.pdf29 Jul 2017
Declaration in FORM BFile: FormB_Madhura1.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FormI_ArchitechtCertificate_MadhuraDevelopers.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FormII_EngineersCertificate_MadhuraDevlopers.pdf29 Jul 2017
Proforma of Allotment letterFile: Allot Agreement Letter_MadhuraDeveloper.pdf29 Jul 2017

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is completed

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep VYANKATESH PRIDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Aurangabad (M Corp.)1,400+ in Aurangabad

Builder: MADHURA DEVELOPERS

MADHURA DEVELOPERS has 1 registration on MahaRERA, including VYANKATESH PRIDE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if VYANKATESH PRIDE is delayed beyond 30 Sep 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VYANKATESH PRIDE?

The registered promoter entity is MADHURA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VYANKATESH PRIDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VYANKATESH PRIDE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VYANKATESH PRIDE?

The professionals named in the filing: Architect: Pankaj Sudhakar Vyawahare; Engineer: PRADEEP VITTHALRAO MOTE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VYANKATESH PRIDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VYANKATESH PRIDE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VYANKATESH PRIDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.