Home / Browse projects / Aurangabad, Maharashtra / VILLO 67
VILLO 67
By CHOUDHARY BHAISHREE LANDMARKS LLP
RG-MH-39111 · RERA P51500024894 · Last updated on MahaRERA portal: 24 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 21 months
- 1 extension taken
- Rs 20.00 crore secured on the land, in favour of State Bank of India
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VILLO 67 is a Residential / Group Housing project by CHOUDHARY BHAISHREE LANDMARKS LLP in Aurangabad, Maharashtra, registered with MahaRERA as P51500024894 on 9 Mar 2020. Possession is promised by 31 Dec 2027. The completion date has moved by 21 months from the original filing. 49 of the 67 units on this registration are recorded sold or booked, and 56 of 88 construction stages are filed complete.
At a glance
Project
- NameVILLO 67
- TypeResidential / Group Housing
- Location
- ITHKHEDA ROAD
- ITKHEDA
- Aurangabad (M Corp.)
- Aurangabad
- 431003
- Pincode431003
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51500024894
- ReraGenie IDRG-MH-39111
Builder
- NameCHOUDHARY BHAISHREE LANDMARKS LLP
- Entity typePartnership
- PartnerMAKARAND DWARKANATH DESHPANDE
- Designated PartnerBhaskar Shankarrao Choudhary
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on9 Mar 2020
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 30 Mar 2026)
- Buildings8 building records
- Documents filed138 files
Current status
Figures as on 24 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RH NO A 1 TO 9 | NA | 4 | 3 | 9 | 0 | 9 |
| RH NO B 10 TO 17 | NA | 4 | 3 | 8 | 0 | 8 |
| RH NO C 18 TO 24 | NA | 4 | 3 | 7 | 0 | 7 |
| RH NO D 25 TO 32 | NA | 4 | 3 | 8 | 0 | 8 |
| RH NO E 33 TO 40 | NA | 4 | 3 | 8 | 0 | 8 |
| RH NO F 41 TO 50 | NA | 4 | 3 | 10 | 0 | 10 |
| RH NO G 51 TO 59 | NA | 4 | 3 | 9 | 0 | 9 |
| RH NO H 60 TO 67 | NA | 4 | 3 | 8 | 0 | 8 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building8
As on 24 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
56 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is External plumbing and external plaster, at 95%.
RH NO A 1 TO 973%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
RH NO B 10 TO 1771%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
RH NO C 18 TO 2470%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
RH NO D 25 TO 3273%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
RH NO E 33 TO 4073%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
RH NO F 41 TO 5069%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
RH NO G 51 TO 5957%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
RH NO H 60 TO 6773%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 24 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 98% |
| Water Supply | Yes | 95% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 95% |
| Street Lighting | Yes | 92% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 95% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 95% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed136
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| RH NO A 1 TO 9 | 18 | 18 |
| RH NO B 10 TO 17 | 18 | 18 |
| RH NO C 18 TO 24 | 14 | 14 |
| RH NO D 25 TO 32 | 16 | 16 |
| RH NO E 33 TO 40 | 16 | 16 |
| RH NO F 41 TO 50 | 20 | 20 |
| RH NO G 51 TO 59 | 18 | 18 |
| RH NO H 60 TO 67 | 16 | 16 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| RH NO F 41 TO 50 | NA | Rs 3.90 cr | Rs 3.64 cr |
| RH NO H 60 TO 67 | NA | Rs 3.67 cr | Rs 3.67 cr |
| RH NO A 1 TO 9 | NA | Rs 3.47 cr | Rs 3.47 cr |
| RH NO G 51 TO 59 | NA | Rs 3.14 cr | Rs 2.92 cr |
| RH NO E 33 TO 40 | NA | Rs 3.12 cr | Rs 3.12 cr |
| RH NO C 18 TO 24 | NA | Rs 3.12 cr | Rs 2.96 cr |
| RH NO B 10 TO 17 | NA | Rs 3.09 cr | Rs 2.94 cr |
| RH NO D 25 TO 32 | NA | Rs 2.73 cr | Rs 2.73 cr |
| - | NA | Rs 1.59 cr | Rs 1.58 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR SAMEER AUSEKAR |
| Architect | Sameer Ausekar |
| Engineer | Er MILIND WADEKAR |
| Engineer | Nanasaheb Tayade |
| Chartered Accountant | PRASAD HARALE AND ASSOCIATES |
| Chartered Accountant | Narendra Navandar |
| Chartered Accountant | Balaprasad Zanwar |
| Partner | Role in project |
|---|---|
| CHOUDHARY BHAISHREE LANDMARKS LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe Registered Project comprises row house structures. Only certain finishing works remain pending, and the delay in completion is primarily due to the shortage of adequate labour resources. Therefore, we hereby request an extension of the project completion timeline up to 31-12-2027, thereby revising the proposed completion date to 31-12-2027.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Mar 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Mar 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Mar 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Mar 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed138
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 138 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Villo ARCHITECT FORM1.pdf | 24 Jul 2026 |
| Withdrawal Update Form 2File: Villo Enginners Form 2.pdf | 24 Jul 2026 |
| Withdrawal Update Form 3File: Form-3 Choudhary Landmark LLP_0001.pdf | 24 Jul 2026 |
| Form 2A (FY 2025-2026)File: organized-1.pdf | 29 Jun 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: Form -3 The C houdhary Bhaishree Landmarks LLP_0001.pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: Architects Certificate Dec 25.pdf | 13 Jan 2026 |
| Withdrawal Update Form 2File: Engineers Certificate Dec 25.pdf | 13 Jan 2026 |
| Withdrawal Update Form 3File: Form-3 Choudhary Bhaishree Landmark LLP_0001.pdf | 13 Jan 2026 |
| Withdrawal Update Form 1File: form 1.pdf | 10 Dec 2025 |
| Withdrawal Update Form 2File: form 2.pdf | 10 Dec 2025 |
| Withdrawal Update Form 3File: Form-3 Choudhary Bhaioshree Landmark_0001.pdf | 10 Dec 2025 |
| Withdrawal Update Form 1File: Form no 1 JUN 25.pdf | 16 Oct 2025 |
| Withdrawal Update Form 2File: Form no 2 JUN 25.pdf | 16 Oct 2025 |
| Withdrawal Update Form 3File: Form -3 JUN 25.pdf | 16 Oct 2025 |
| Form 5 (FY 2024-2025)File: Document 41.pdf | 3 Sep 2025 |
| Withdrawal Update Form 1File: Form no 1 JUN 25.pdf | 31 Jul 2025 |
| Withdrawal Update Form 2File: Form no 2 JUN 25.pdf | 31 Jul 2025 |
| Withdrawal Update Form 3File: Form -3 JUN 25.pdf | 31 Jul 2025 |
| Form 2A (FY 2024-2025)File: CCI_000616.pdf | 1 Jul 2025 |
| Form 1File: Document 54-1.pdf | 14 May 2025 |
| Form 2File: Document 55.pdf | 14 May 2025 |
| Disclosure of Sold and Booked InventoryFile: CCI_000544.pdf | 14 May 2025 |
| Form 3File: CA Certificate of Chaudhari Bhaishree Landmark llp_0001.pdf | 14 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Choudhary Bhaishree Landmark LLP.pdf | 7 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certifcate.pdf | 23 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.pdf | 23 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold unsold.pdf | 14 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FPRM 2A.pdf | 14 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Villo67 Choudhary Bhaishree llp_0001.pdf | 11 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: villo.pdf | 11 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate of Chaudhary Bhaishree Landmark LLp 31-03-2024_0001.pdf | 11 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate of Chaudhary Bhaisree Landmark LLP 30-06-2024_0001.pdf | 11 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate SEP24.pdf | 10 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate .pdf | 10 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold 30-9-24.pdf | 10 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A.pdf | 10 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CCI_000342.pdf | 10 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 30-6-24 - converted.pdf | 18 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers 30-6-24 - converted.pdf | 18 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: CCI_000270.pdf | 14 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: CCI_000269.pdf | 14 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate - converted.pdf | 27 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate - converted.pdf | 27 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: CCI_000196.pdf | 27 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold.pdf | 27 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CCI_000121.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CCI_000122.pdf | 20 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: CCI_000111.pdf | 20 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2a.pdf | 13 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: CCI_000111.pdf | 13 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: CCI_000104.pdf | 13 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 Sep 23 Villo 67 (2 files merged).pdf | 28 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CCI_000060.pdf | 7 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CCI_000061_removed.pdf | 7 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CCI_000060.pdf | 7 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: CCI_000028.pdf | 7 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch-30-6-23.pdf | 27 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engi 30-6-23.pdf | 27 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 001.pdf | 27 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CCI_000033.pdf | 20 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 001.pdf | 15 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 001.pdf | 13 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer.pdf | 13 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf | 14 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certiificate 001 (1).pdf | 14 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 004.pdf | 14 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 001.pdf | 14 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: 001.pdf | 14 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: 0012.pdf | 14 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 001 (1).pdf | 2 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 18 Nov 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 18 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 001 (1).pdf | 3 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 001.pdf | 12 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: 001 (2).pdf | 12 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHI 31-12-21.pdf | 11 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHI 31-03-2022.pdf | 11 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHI 30-06-2022.pdf | 11 Oct 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 138 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep VILLO 67 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near ITKHEDA1,400+ in Aurangabad
Filed coordinates, straight-line distance. 55 registered projects within 2 km.
Nabhraj Gharkul
Nabhraj Construction
Gursahani Twin Tower
Shree Hinglajmata Constructions
MADHURA PARK
Madhura Land Developers
VYANKATESH PARADISE
TIRUPATI INFRA
KASLIWAL NIWARA
SANJAY SUGANCHAND KASLIWAL
KASLIWAL AMARA
SUPUSHP ENTERPRISES
See every Aurangabad project, with the district possession charts
Builder: CHOUDHARY BHAISHREE LANDMARKS LLP
CHOUDHARY BHAISHREE LANDMARKS LLP has 2 registrations on MahaRERA, including VILLO 67 and CHOUDHARY BHAISHREE TOWERS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What are my rights if VILLO 67 is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VILLO 67?
The registered promoter entity is CHOUDHARY BHAISHREE LANDMARKS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VILLO 67?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for VILLO 67?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VILLO 67?
The professionals named in the filing: Architect: AR SAMEER AUSEKAR; Architect: Sameer Ausekar; Engineer: Er MILIND WADEKAR; Engineer: Nanasaheb Tayade; Chartered Accountant: PRASAD HARALE AND ASSOCIATES; Chartered Accountant: Narendra Navandar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VILLO 67?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback