ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / VRUNDAVAN

Registration lapsed No litigation declared Residential / Group Housing project

VRUNDAVAN

By Royal Infra Projects

RG-MH-71714 · RERA P52100049362 · Last updated on MahaRERA portal: 27 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 24 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2024Possession promised24 months past this date
5 of 11Construction stages donefurthest along: Internal walls, 90%
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

VRUNDAVAN is a Residential / Group Housing project by Royal Infra Projects in Pune, Maharashtra, registered with MahaRERA as P52100049362 on 7 Feb 2023. Possession was promised by 31 Oct 2024 and is now 24 months past that date.

At a glance

Project

  • NameVRUNDAVAN
  • TypeResidential / Group Housing
  • Location
    • ISKON Temple Road
    • Ravet
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100049362
  • ReraGenie IDRG-MH-71714

Builder

  • NameRoyal Infra Projects
  • Entity typePartnership
  • PartnersAbhay Galinde, Vishwas Supekar, Satyambhama Ambad, Gajanan Godbole

Key dates

24 months past promisethis monthRegisteredFeb 2023PromisedOct 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on7 Feb 2023
  • Promised completion31 Oct 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed89 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VRUNDAVANNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

VRUNDAVAN: 68% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed14

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots14
Closed/Covered14

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area489 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Mr Bhanwar Lal BoranaGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban

Approvals and building plan

Permissible FSI1496.81
Proposed, not sanctioned855 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAundh New DP Road

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShrinivas Pandit
EngineerMayur Belose
Chartered AccountantCA Malpani Agrawal and Associates
PartnerRole in project
Royal Infra Projects-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_Form3.pdf27 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA_Form5.pdf27 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAR 2025 CERTIFICATE.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAR 2025 CERTIFICATE.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg_Cert_Mar-25.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Circular March 2025.pdf21 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A-Quality Assurance Certificate_24-25.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SEPT 2024 CERTIFICATE.pdf15 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate on Project Cost Fund withdrawal Jul-Sep 2024(Form 3).pdf15 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg_Cert_Sep_24.pdf15 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate on Project Cost Fund withdrawal Apr-Jun 2024(Form 3).pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JUNE 2024 CERTIFICATE.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg_Cert_June_24.pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A-Quality Assurance Certificate_23-24.pdf17 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Circular June 2024.pdf17 Jul 2024
Building plan approvalFile: Revised Building Plan 18, 2024-compressed.pdf18 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Revised Building Plan 18, 2024-compressed.pdf18 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Revised CC May 18, 2024.pdf18 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate on Project Cost Fund withdrawal Jan-March 2024(Form 3).pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MARCH 2024 CERTIFICATE.pdf6 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg_Cert_Mach_24.pdf6 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate on Project Cost and Fund withdrawal Feb-March 2023(Form 3).pdf4 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate on Project Cost and Fund withdrawal April to June 2023(Form 3).pdf4 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate on Project Cost and Fund withdrawal July to Sept 2023(Form 3).pdf4 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate on Project Cost and Fund withdrawal Oct to Dec 2023(Form 3).pdf4 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MARCH 2023 CERTIFICATE.pdf3 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JUNE 2023 CERTIFICATE.pdf3 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SEPTEMBER 2023 CERTIFICATE.pdf3 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: royal infra form 5 rera.pdf28 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf26 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf26 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf26 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf26 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf26 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf26 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf26 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf26 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 CA Certificate on Project Cost And Fund withdrawal (Form 3).pdf26 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certificate on Project Cost And Fund withdrawal (Form 3).pdf26 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 CA Certificate on Project Cost And Fund withdrawal (Form 3).pdf26 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 CA Certificate on Project Cost And Fund withdrawal (Form 3).pdf26 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A site supervisor.pdf21 Dec 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Circular March 2023.pdf21 Dec 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Circular June 2023.pdf21 Dec 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Circular September 2023.pdf21 Dec 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Circular December 2023.pdf21 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MARCH 2023 CERTIFICATE.pdf20 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JUNE 2023 CERTIFICATE.pdf20 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SEPTEMBER 2023 CERTIFICATE.pdf20 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DECEMBER 2023 CERTIFICATE.pdf20 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vrundavan 2023 Marach.pdf20 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vrundavan June 2023.pdf20 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vrundavan sept 2023.pdf20 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vrundavan dec 2023.pdf20 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf20 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 31.pdf20 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 32.pdf20 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 33.pdf20 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Intrest Discloure - Annexure A-2.pdf18 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Intrest Discloure - Annexure A-3.pdf18 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Intrest Discloure - Annexure A-4.pdf18 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Intrest Discloure - Annexure A-1.pdf4 Jan 2023
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance (2) (1).pdf30 Dec 2022
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance (2) (1).pdf30 Dec 2022
Building plan approvalFile: Santioned plan iskon 5R_compressed.pdf23 Dec 2022
Copy of the legal title reportFile: Ravet_search Title.pdf23 Dec 2022
Copy of the legal title reportFile: Ravet 5r titel search report_compressed-1-6.pdf23 Dec 2022
Copy of the legal title reportFile: Ravet 5r titel search report_compressed-7-13.pdf23 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Santioned plan iskon 5R_compressed.pdf23 Dec 2022
Other - TechnicalFile: Format D (4).pdf23 Dec 2022
CERSAI detailsFile: CERSAI_Search_Report_200255710098_For_Asset_Based_Search_23_12_2022_17_46_36_942.pdf3 Dec 2022
Proforma of Allotment letterFile: Model Form of Allotment letter (3)_compressed.pdf29 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3- Rohit Infra.pdf22 Nov 2022
Details of encumbrances concerned to FinanceFile: Declaration Legal Encumbrance.pdf21 Nov 2022
Details of encumbrances concerned to LegalFile: Declaration Legal Encumbrance.pdf21 Nov 2022
Declaration about Commencement CertificateFile: Declaration about ccert.pdf21 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A (4).pdf21 Nov 2022
Deviation Report with respect to Allotment letterFile: Deviation report.pdf21 Nov 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report- Agreement to sell_compressed.pdf21 Nov 2022
Declaration in FORM BFile: Form B - Vrundavan_compressed.pdf17 Nov 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VRUNDAVAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ravet13,700+ in Pune

2 kmVRUNDAVANCompleted 82Lapsed / revoked 38Other 68Dot size: filed unitsN

Filed coordinates, straight-line distance. 188 registered projects within 2 km.

Builder: Royal Infra Projects

Royal Infra Projects has 1 registration on MahaRERA, including VRUNDAVAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that VRUNDAVAN shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if VRUNDAVAN is delayed beyond 31 Oct 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VRUNDAVAN?

The registered promoter entity is Royal Infra Projects, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VRUNDAVAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VRUNDAVAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VRUNDAVAN?

The professionals named in the filing: Architect: Shrinivas Pandit; Engineer: Mayur Belose; Chartered Accountant: CA Malpani Agrawal and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VRUNDAVAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VRUNDAVAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VRUNDAVAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.