ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / VRINDAVAN GARDEN

Registered No litigation declared Residential / Group Housing project

VRINDAVAN GARDEN

By SAI DREAM HOMES DEVELOPERS

RG-MH-27801 · RERA P99000024184 · Last updated on MahaRERA portal: 25 Mar 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Podiums (if any), 0%
38 of 55Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

VRINDAVAN GARDEN is a Residential / Group Housing project by SAI DREAM HOMES DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000024184 on 24 Jan 2020. Possession is promised by 30 Jun 2027. 17 of the 55 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameVRINDAVAN GARDEN
  • TypeResidential / Group Housing
  • Location
    • KELVE STATION ROAD
    • KELVE ROAD
    • Zanzroli
    • Palghar
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000024184
  • ReraGenie IDRG-MH-27801

Builder

  • NameSAI DREAM HOMES DEVELOPERS
  • Entity typePartnership
  • GSTIN27AEAFS5371Q1ZD
  • PartnersRAMREKHA PARASNATH PAL, ANIL RAJDEO PAL, DURGAPRASAD RAMCHANDRA YADAV, VINAY BHOLANATH SINGH, JAGWANTA JAGMOHAN PAL, OMPRAKASH RAMDULAR PAL, AMARSINGH RAMJEET PAL
  • PartnerDILIP SANKATHA VISHWAKARMA
  • Other registrations1 more →

Key dates

this monthRegisteredJan 2020PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Jan 2020
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed61 files

Current status

31%17 of 55 units booked

Figures as on 25 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VRINDAVAN GARDEN, BUILDING NO 1, A WING, TYPE A1NA88421355

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

VRINDAVAN GARDEN, BUILDING NO 1, A WING, TYPE A1: 36% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership7

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,436 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Mar 2026
LandownerVillageDistrict
DILIP SANKATHA VISHWAKARMAVasai-Virar City (M Corp)Palghar
ANIL RAJDEO PALVasai-Virar City (M Corp)Palghar
DURGAPRASAD RAMCHANDRA YADAVVasai-Virar City (M Corp)Palghar
VINAY BHOLANATH SINGHVasai-Virar City (M Corp)Palghar
RAMREKHA PARASNATH PALVasai-Virar City (M Corp)Palghar
JAGWANTA JAGMOHAN PALVasai-Virar City (M Corp)Palghar
OMPRAKASH RAMDULAR PALBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityCollector Office Palghar
Permissible FSI2436.0
Proposed, not sanctioned2,436 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCHANDAN NAKA NALLASOPARA EAST

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRENDER POINT
EngineerMESHRAM AND THUKRAL
EngineerPRADEEP YADAV
Chartered AccountantKANTHAWALA & CO
Chartered AccountantCHANDAN KUMAR CHOUDHARY
Chartered AccountantSANJEEV RAJARAM CHAUDHARY
PartnerRole in project
SAI DREAM HOMES DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: SAI DREAMS FORM2A VRINDAVAN 099000024184.pdf25 Mar 2026
Form 5 (FY 2024-2025)File: FORM 5 VRINDAVAN 24-25.pdf25 Mar 2026
Form 1File: VG FORM 1 Q4.pdf18 Feb 2026
Form 2File: VG FORM 2 Q4.pdf18 Feb 2026
Form 3File: VG FORM 3 Q4 24-25.pdf18 Feb 2026
Disclosure of Sold and Booked InventoryFile: VG SOLD UNSOLD Q 4.pdf18 Feb 2026
Form 1File: VG FORM 1 Q1.pdf18 Feb 2026
Form 2File: VG FORM 2 Q1.pdf18 Feb 2026
Form 3File: VG FORM 3 Q1 25-26.pdf18 Feb 2026
Disclosure of Sold and Booked InventoryFile: VG SOLD UNSOLD Q 1.pdf18 Feb 2026
Form 1File: VG FORM 1 Q2.pdf18 Feb 2026
Form 2File: VG FORM 2 Q2.pdf18 Feb 2026
Form 3File: VG FORM 3 Q2 25-26.pdf18 Feb 2026
Disclosure of Sold and Booked InventoryFile: VG SOLD UNSOLD Q 2.pdf18 Feb 2026
Form 1File: VG FORM 1 Q3.pdf18 Feb 2026
Form 2File: VG FORM 2 Q3.pdf18 Feb 2026
Form 3File: VG FORM 3 Q3 25-26.pdf18 Feb 2026
Disclosure of Sold and Booked InventoryFile: VG SOLD UNSOLD Q 3.pdf18 Feb 2026
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN OTHER ENTITY_11zon.pdf12 Mar 2024
Proforma of Agreement for saleFile: AGREEMENT FOR SALE_11zon_11zon.pdf12 Mar 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf12 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 5 20-21.pdf11 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf11 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 19-20.pdf11 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 20-21.pdf11 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 21-22.pdf11 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23.pdf11 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION OF SEPERATE BANK ACCOUNT.pdf11 Mar 2024
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT WITH ALLOTMENT LETTER.pdf11 Mar 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT RERA AGREEMENT.pdf11 Mar 2024
Other - TechnicalFile: DECLARATION CUM UNDERTAKING.pdf11 Mar 2024
Details of encumbrances concerned to FinanceFile: DECLARATION - ENCUMBRANCE- LEGAL.pdf29 Feb 2024
Details of encumbrances concerned to LegalFile: DECLARATION - ENCUMBRANCE- LEGAL.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGNIEER CERTIFICATE.pdf29 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY ASSURANCE 21-22.pdf29 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUALITY ASSURANCE 22-23.pdf29 Feb 2024
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF BOOKED SOLD AND UNSOLD.pdf29 Feb 2024
CERSAI detailsFile: DECLARATION_ cersai.pdf29 Feb 2024
Building plan approvalFile: REVISED BLUE PRINT VRINDAVAN.pdf5 Aug 2021
Layout approvalFile: REVISED LAYOUT OF KELVE 7 FLOOR_2.pdf5 Aug 2021
Copy of Layout Approval (in case of layout)File: REVISED LAYOUT OF KELVE 7 FLOOR_2.pdf5 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: REVISED BLUE PRINT VRINDAVAN.pdf5 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: REVISED CC COMPRESSED.pdf5 Aug 2021
Declaration about Commencement CertificateFile: CC DECLARATION VRINDAVAN GARDEN.pdf5 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY CERTIFICATE VRINDAVAN HEIGHTS.pdf5 Aug 2021
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD LIST VRINDAVAN.pdf5 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: VRINDAVAN FORM 5 19-20.pdf5 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: VRINDAVAN FORM 5 20-21.pdf5 Aug 2021
Layout approvalFile: LAYOUT PLAN GUT NO 148.pdf18 Jan 2020
Building plan approvalFile: Blue Print VRINDAVAN GARDEN.pdf18 Jan 2020
PAN CardFile: PAN CARD SAI DREAM HOMES DEVELOPERS_2.pdf18 Jan 2020
Copy of the legal title reportFile: TITLE SEARCH DEVELOPER.pdf18 Jan 2020
Details of encumbrancesFile: encumbrance VRINDAVAN garden DEVELOPERS.pdf18 Jan 2020
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN GUT NO 148.pdf18 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: Blue Print VRINDAVAN GARDEN.pdf18 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: NA AND CC ORDER.pdf18 Jan 2020
Declaration in FORM BFile: FORM B COMPANY DEVELOPER.pdf18 Jan 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT certificate developers.pdf18 Jan 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A FORM 3 VRINDAVAN GARDEN.pdf18 Jan 2020
Proforma of Allotment letterFile: Draft Sale Agreement and Allotment Letter-converted.pdf18 Jan 2020

How this compares with Palghar

31%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VRINDAVAN GARDEN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KELVE ROAD3,200+ in Palghar

2 kmVRINDAVAN GARDENCompleted 21Lapsed / revoked 16Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 46 registered projects within 2 km.

Builder: SAI DREAM HOMES DEVELOPERS

SAI DREAM HOMES DEVELOPERS has 2 registrations on MahaRERA, including VRINDAVAN GARDEN and MADHUBAN GARDEN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if VRINDAVAN GARDEN is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VRINDAVAN GARDEN?

The registered promoter entity is SAI DREAM HOMES DEVELOPERS, a partnership as per the filing. Its GSTIN 27AEAFS5371Q1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VRINDAVAN GARDEN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VRINDAVAN GARDEN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VRINDAVAN GARDEN?

The professionals named in the filing: Architect: RENDER POINT; Engineer: MESHRAM AND THUKRAL; Engineer: PRADEEP YADAV; Chartered Accountant: KANTHAWALA & CO; Chartered Accountant: CHANDAN KUMAR CHOUDHARY; Chartered Accountant: SANJEEV RAJARAM CHAUDHARY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VRINDAVAN GARDEN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VRINDAVAN GARDEN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VRINDAVAN GARDEN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.