Home / Browse projects / Palghar, Maharashtra / VIRAJ RESIDENCY

Registered No litigation declared Residential / Group Housing project

VIRAJ RESIDENCY

By SATGHARE BUILDCON PRIVATE LIMITED

RG-MH-17962 · RERA P99000077272 · Last updated on MahaRERA portal: 15 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2031Possession promisedno revision filed
3 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 62%
81 of 87Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

VIRAJ RESIDENCY is a Residential / Group Housing project by SATGHARE BUILDCON PRIVATE LIMITED in Palghar, Maharashtra, registered with MahaRERA as P99000077272 on 2 Aug 2024. Possession is promised by 31 Dec 2031. 6 of the 87 units on this registration are recorded sold or booked, and 3 of 33 construction stages are filed complete.

At a glance

Project

  • NameVIRAJ RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • New Satpati Road
    • Tembhode Village
    • Patilwadi Bus Stop
    • Palghar West
    • Palghar
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000077272
  • ReraGenie IDRG-MH-17962

Builder

  • NameSATGHARE BUILDCON PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorAMIT YADNESHWAR SATGHARE
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2024PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Aug 2024
  • Promised completion31 Dec 2031
  • Revised completionNone
  • Buildings3 building records
  • Documents filed71 files

Current status

7%6 of 87 units booked
18.5%Work done, per cost certificate

Figures as on 15 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1 - TYPE C2NA8853053
BUNGLOWNA22303
BUILDING NO 1 - TYPE C1NA8831031

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 15 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 62%.

BUILDING NO 1 - TYPE C29%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGLOW0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 1 - TYPE C124%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure62%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed114

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots114
Closed/Covered10
Open Space104
BuildingClosed/CoveredOpen SpaceTotal
BUILDING NO 1 - TYPE C286270
BUNGLOW033
BUILDING NO 1 - TYPE C123941

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,500 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Apr 2026
LandownerVillageDistrict
SURESH RAGHUNATH PATILPalghar Palghar

Approvals and building plan

Sanctioning authorityCOLLECTOR
Permissible FSI6055.29
Proposed, not sanctioned4,178 sq m
Buildings approved5
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSAROVAR BUILDING PAPDY
Estimated costRs 9.12 cr
Cost incurredRs 1.69 cr
Work done18.53%
BuildingWingEstimatedIncurred
BUILDING NO 1 - TYPE C2NARs 8.22 crRs 1.69 cr
BUNGLOWNARs 75.07 lakh-
-NARs 15.20 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRENDER POINT THROUGE SWAPNIL ADSUL SATISH ADSUL
Engineerparesh unnarkar
Chartered AccountantAkshay Mhatre & Co
Chartered AccountantASHWIN NAIR
PartnerRole in project
SATGHARE BUILDCON PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2031

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 MAR 2026.pdf15 Apr 2026
Withdrawal Update Form 2File: FORM 2 MAR 2026_11zon.pdf15 Apr 2026
Withdrawal Update Form 3File: FORM 3 MAR 2026.pdf15 Apr 2026
Withdrawal Update Form 1File: From-1.pdf19 Jan 2026
Withdrawal Update Form 2File: From-2.pdf19 Jan 2026
Withdrawal Update Form 3File: form 3 dec 25.pdf19 Jan 2026
Withdrawal Update Form 1File: Architect Form 1.pdf11 Dec 2025
Withdrawal Update Form 2File: Form-2 Bungalow 3.pdf11 Dec 2025
Withdrawal Update Form 3File: CA FORM 3 New.pdf11 Dec 2025
Form 1File: From-1.pdf20 Oct 2025
Form 2File: From- 2.pdf20 Oct 2025
Form 3File: FORM-3 .pdf20 Oct 2025
Disclosure of Sold and Booked InventoryFile: DEISCOLSURE OF SOLD.pdf20 Oct 2025
Form 1File: From 1.pdf19 Jul 2025
Form 2File: FROM 2.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold & Booked Inventrory.pdf19 Jul 2025
Form 3File: form 3.pdf19 Jul 2025
Form 1File: From 1.pdf10 Jul 2025
Form 2File: From-2..pdf10 Jul 2025
Form 3File: From -3..pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold & Booked Inventroy.pdf10 Jul 2025
Form 2File: From 2.pdf10 Jul 2025
Form 3File: From 3.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold & Booked Inventroy.pdf10 Jul 2025
Form 1File: From 1.pdf10 Jul 2025
Form 2File: FORM 2.pdf10 Jul 2025
Form 1File: FROM 1.pdf10 Jul 2025
Form 3File: FORM 3.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold & Booked Inventrory.pdf10 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM -1 .pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM-3 .pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM -2 .pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM -2 .pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM -2 .pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM-2.pdf5 Feb 2025
Other - TechnicalFile: Renewal Certificate.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3 New.pdf29 Jul 2024
Other - TechnicalFile: Gmail - The attached CC is valid and approved by Palghar Nagarparishad.pdf29 Jul 2024
Other - TechnicalFile: Gmail - The attached CC is valid and approved by Palghar Nagarparishad.pdf29 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 BLD-1 TYPE C1 C2.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Bungalow 1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Bungalow 2.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Bungalow 3.pdf20 Jul 2024
Proforma of Allotment letterFile: Allotment letter.pdf1 Jul 2024
Other - LegalFile: Annexure-A, Declaration-Cum-Undertaking.pdf26 Jun 2024
PAN CardFile: Company Director Pancards.pdf22 Jun 2024
Proforma of Agreement for saleFile: RERA AGREMENT FOR SALE.pdf22 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf22 Jun 2024
Copy of the legal title reportFile: New Title Report-Search Report.pdf12 Jun 2024
Layout approvalFile: Sanction Layout plan.pdf24 Apr 2024
Building plan approvalFile: Sanction building plan 1.pdf24 Apr 2024
Building plan approvalFile: Sanction building plan 2.pdf24 Apr 2024
Building plan approvalFile: Sanction bunglow plan.pdf24 Apr 2024
Details of encumbrances concerned to FinanceFile: Details of Encumbrances - Legal-1.pdf24 Apr 2024
Details of encumbrances concerned to FinanceFile: 1A Details of Finance-1.pdf24 Apr 2024
Details of encumbrances concerned to LegalFile: Details of Encumbrances - Legal-1.pdf24 Apr 2024
Details of encumbrances concerned to LegalFile: 1A Details of Finance-1.pdf24 Apr 2024
Copy of Layout Approval (in case of layout)File: Sanction Layout plan.pdf24 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction building plan 1.pdf24 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction building plan 2.pdf24 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction bunglow plan.pdf24 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: NA ORDER.pdf24 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Amit-1.pdf24 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Rajesh-1.pdf24 Apr 2024
Deviation Report with respect to Allotment letterFile: Deviation Allotment.pdf23 Apr 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement.pdf23 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: C C Order.pdf12 Apr 2024
Declaration about Commencement CertificateFile: Declaration about CC.pdf12 Apr 2024
Declaration in FORM BFile: FORM B DIRECTOR .pdf12 Apr 2024
CERSAI detailsFile: Cersai.pdf12 Apr 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationFlatsStatusPromisedDelivered
ador garden bldg no 2 and 3umroli W76OngoingDec 2024Not delivered

How this compares with Palghar

7%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VIRAJ RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Tembhode Village, Patilwadi Bus Stop, Palghar West3,200+ in Palghar

2 kmVIRAJ RESIDENCYCompleted 110Lapsed / revoked 47Other 116Dot size: filed unitsN

Filed coordinates, straight-line distance. 273 registered projects within 2 km.

Builder: SATGHARE BUILDCON PRIVATE LIMITED

SATGHARE BUILDCON PRIVATE LIMITED has 1 registration on MahaRERA, including VIRAJ RESIDENCY. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if VIRAJ RESIDENCY is delayed beyond 31 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VIRAJ RESIDENCY?

The registered promoter entity is SATGHARE BUILDCON PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VIRAJ RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VIRAJ RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VIRAJ RESIDENCY?

The professionals named in the filing: Architect: RENDER POINT THROUGE SWAPNIL ADSUL SATISH ADSUL; Engineer: paresh unnarkar; Chartered Accountant: Akshay Mhatre & Co; Chartered Accountant: ASHWIN NAIR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VIRAJ RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VIRAJ RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VIRAJ RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.