Home / Browse projects / Pune, Maharashtra / VINDHYA HEIGHTS

Registered No litigation declared Others project

VINDHYA HEIGHTS

By MHALSAKANT PROPERTIES

RG-MH-60431 · RERA P52100049521 · Last updated on MahaRERA portal: 4 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
77 of 99Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

VINDHYA HEIGHTS is a Others project by MHALSAKANT PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100049521 on 15 Feb 2023. Possession is promised by 27 Dec 2027. 22 of the 99 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameVINDHYA HEIGHTS
  • TypeOthers
  • Location
    • PUNE NAGAR HIGHWAY
    • SHIKRAPUR
    • Shirur
    • Pune
    • 412208
  • Pincode412208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100049521
  • ReraGenie IDRG-MH-60431

Builder

  • NameMHALSAKANT PROPERTIES
  • Entity typePartnership
  • PartnersDATTATRAY GANPAT BHUMKAR, SUNIL GANPAT BHUMKAR

Key dates

this monthRegisteredFeb 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Feb 2023
  • Promised completion27 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed105 files

Current status

22%22 of 99 units booked
122.4%Work done, per cost certificate

Figures as on 4 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VINDHYA HEIGHTSNA5409999

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

VINDHYA HEIGHTS: 56% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes35%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed156

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots156
Closed/Covered156

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,200 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Jul 2025

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development
Permissible FSI8296.88
Proposed, not sanctioned2,572 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHIKRAPUR, NAGAR PUNE HIGHWAY, PABAL CHOWK, PUNE 412208
Estimated costRs 4.75 cr
Cost incurredRs 5.81 cr
Work done122.36%
BuildingWingEstimatedIncurred
VINDHYA HEIGHTSNARs 4.75 crRs 5.81 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDNYANESHWAR BIRADAR
EngineerMAHESH GADDI
EngineerAMOL NIRMAL
EngineerVishal Yadav
Chartered AccountantABHINANDAN jAIN
Chartered AccountantARTI JAIN
Chartered AccountantPANKAJ PATIL
Chartered AccountantManatu Kumbhar
PartnerRole in project
MHALSAKANT PROPERTIES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 27 Dec 2027

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: final Form 2A updated fy 25 26.pdf4 Jun 2026
Form 5 (FY 2025-2026)File: Form 5 mhasakant Properties 25-26 01.pdf22 Apr 2026
Withdrawal Update Form 1File: form 1.pdf20 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf20 Apr 2026
Withdrawal Update Form 3File: upload form 3_ NEW.pdf20 Apr 2026
Form 2A (FY 2022-2023)File: 2A MARCH 23.pdf27 Feb 2026
Form 2A (FY 2023-2024)File: final Form 2A updated fy 23-24.pdf27 Feb 2026
Form 2A (FY 2024-2025)File: final Form 2A updated fy 24 25.pdf27 Feb 2026
Form 5 (FY 2022-2023)File: form 5 fy 22 23.pdf30 Jan 2026
Form 5 (FY 2023-2024)File: Mhalsakant Properties 23 24 FORM 5 2.pdf30 Jan 2026
Form 5 (FY 2024-2025)File: FORM 5 FINAL.pdf30 Jan 2026
Withdrawal Update Form 1File: form 1.pdf29 Jan 2026
Withdrawal Update Form 2File: form 2.pdf29 Jan 2026
Withdrawal Update Form 3File: form 3_compressed.pdf29 Jan 2026
Withdrawal Update Form 1File: FORM 1.pdf18 Oct 2025
Withdrawal Update Form 1File: FORM 1.pdf18 Oct 2025
Withdrawal Update Form 2File: FORM 2.pdf18 Oct 2025
Withdrawal Update Form 2File: FORM 2.pdf18 Oct 2025
Withdrawal Update Form 3File: form 3 rz.pdf18 Oct 2025
Withdrawal Update Form 3File: form 3 rz.pdf18 Oct 2025
Withdrawal Update Form 1File: Form 1 (1).pdf19 Jul 2025
Withdrawal Update Form 1File: Form 1 (1).pdf19 Jul 2025
Withdrawal Update Form 2File: Form 2.pdf19 Jul 2025
Withdrawal Update Form 2File: Form 2.pdf19 Jul 2025
Withdrawal Update Form 3File: Vindhya Hights Form 3 Final_11zon.pdf19 Jul 2025
Withdrawal Update Form 3File: Vindhya Hights Form 3 Final_11zon.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 (ENGINEER) MAR-25.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mahalsankat properties SIZ.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q 3.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf16 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Mhalsakant Properties 23 24 FORM 5 2.pdf28 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Mhalsakant Properties 23 24 FORM 5 2.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q2 FY 24 25.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 vindhya heights.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 SEP 24.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: All sold unsold sep 24.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A MARCH 24.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 JUNE 24.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: All sold unsold shops history - Copy.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3mhalsakant properties VINDHYA HEIGHTS_11zon.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JAN TO MARCH 24 FORM 1.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEW form 2 MARCH 24.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: All sold unsold shops history - Copy.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VINDHYA HEIGHTS_11zon.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 updated promoter sign.pdf9 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: jan to march 23 form 1 (1).pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: apr to june 23 FORM 1.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JULY TO SEP 23 FORM 1.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: OCT TO DEC 23 FORM 1.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEW form 2 Dec 23.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEW form 2 MARCH 23.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: All sold unsold shops history - Copy.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_compressed.pdf20 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 fy 22 23.pdf5 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEW form 2 MARCH 23.pdf18 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEW form 2 june 23.pdf18 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEW form 2 sep 23.pdf18 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A MARCH 23.pdf18 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Malsakant properties rera certificate 2023 (1).pdf10 Nov 2023
Disclosure of sold/ booked inventoryFile: MARCH 23 SOLD.pdf10 Nov 2023
Disclosure of sold/ booked inventoryFile: JUNE SOLD UNSOLD.pdf10 Nov 2023
Disclosure of sold/ booked inventoryFile: SEP 23 SOLD.pdf10 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 March 23.pdf10 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 June 23compressed.pdf10 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 sept 23compressed.pdf10 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TOTAL FORM 3 RESIZE.pdf4 Feb 2023
CERSAI detailsFile: All GAT NO CERSAI_Search_Report_200259465708_For_Asset_Based_Search_03_02_2023_19_43_08_313 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DATTATRAY BHUMKAR DIS OF INT IN OTHER REAL ESATE ORG_11zon.pdf3 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SUNIL BHUMKAR DISCLOSURE OF INTERST IN OTHER REAL ESATE ORG_11zon.pdf3 Feb 2023
Layout approvalFile: gtfh027.pdf2 Feb 2023
Layout approvalFile: gtfh028.pdf2 Feb 2023
Layout approvalFile: gtfh029.pdf2 Feb 2023
Layout approvalFile: gtfh030.pdf2 Feb 2023
Layout approvalFile: gtfh031.pdf2 Feb 2023
Layout approvalFile: gtfh032.pdf2 Feb 2023

How this compares with Pune

22%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VINDHYA HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHIKRAPUR13,700+ in Pune

2 kmVINDHYA HEIGHTSCompleted 9Lapsed / revoked 19Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 39 registered projects within 2 km.

Builder: MHALSAKANT PROPERTIES

MHALSAKANT PROPERTIES has 1 registration on MahaRERA, including VINDHYA HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VINDHYA HEIGHTS is delayed beyond 27 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VINDHYA HEIGHTS?

The registered promoter entity is MHALSAKANT PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VINDHYA HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VINDHYA HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VINDHYA HEIGHTS?

The professionals named in the filing: Architect: DNYANESHWAR BIRADAR; Engineer: MAHESH GADDI; Engineer: AMOL NIRMAL; Engineer: Vishal Yadav; Chartered Accountant: ABHINANDAN jAIN; Chartered Accountant: ARTI JAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VINDHYA HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VINDHYA HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VINDHYA HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.