Home / Browse projects / Pune, Maharashtra / KAMAL BAUG
KAMAL BAUG
RG-MH-97155 · RERA P52100052708 · Last updated on MahaRERA portal: 10 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 24 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KAMAL BAUG is a Residential / Group Housing project by SAPTARSHI BUILDCON in Pune, Maharashtra, registered with MahaRERA as P52100052708 on 22 Sep 2023. Possession is promised by 31 Dec 2030. The completion date has moved by 24 months from the original filing. 0 of the 174 units on this registration are recorded sold or booked, and 2 of 77 construction stages are filed complete.
At a glance
Project
- NameKAMAL BAUG
- TypeResidential / Group Housing
- Location
- PUNE NAGAR ROAD
- BHUJBAL MALA PABAL CHOWK
- Shikrapur
- Shirur
- Pune
- 412208
- Pincode412208
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100052708
- ReraGenie IDRG-MH-97155
Builder
- NameSAPTARSHI BUILDCON
- Entity typePartnership
- PartnersRAVINDRA DNYANESHWAR BHUJBAL, MALHARI DNYANOBA CHANDHERE, BALASAHEB GULAB CHANDHERE, MEGHSHYAM SAMBHAJIRAO KARPE, RAVINDRA MUKUND KALE, ANIL JAYAWANTRAO BHUJBAL, MADHAV PANDURANG RAUT, MANISH MARUTI RAUT, NIKHIL PANDIT LOKHANDE, HARSHALI MAHESH KARPE
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Sep 2023
- Promised completion31 Dec 2030
- Revised completionRevised to 31 Dec 2030 (originally 25 Dec 2028)
- Buildings7 building records
- Documents filed96 files
Current status
Figures as on 10 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING-A | NA | 4 | 4 | 16 | 0 | 16 |
| WING-B | NA | 4 | 4 | 32 | 0 | 32 |
| WING-C | NA | 4 | 4 | 24 | 0 | 24 |
| WING-D | NA | 4 | 4 | 24 | 0 | 24 |
| WING-E | NA | 4 | 4 | 40 | 0 | 40 |
| WING-F | NA | 4 | 4 | 24 | 0 | 24 |
| WING-G | NA | 4 | 4 | 14 | 0 | 14 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building7
As on 10 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Slabs of Super Structure, at 5%.
WING-A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING-B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING-C0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING-D0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING-E0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING-F19%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 5% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING-G0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 10 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed418
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| WING-A | 36 | 36 |
| WING-B | 73 | 73 |
| WING-C | 56 | 56 |
| WING-D | 37 | 37 |
| WING-E | 112 | 112 |
| WING-F | 49 | 49 |
| WING-G | 55 | 55 |
Land and ownership4
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SHIVAJI CHANDAR URF RAMCHANDRA BHUJBAL | Shikrapur | Pune |
| TATYABA CHANDARRAO BHUJBAL | - | Pune |
| BHAGWAN RAMCHANDRA BHUJBAL | Shikrapur | Pune |
| HANUMANT RAMCHANDRA BHUJBAL | Shikrapur | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING-E | NA | Rs 3.51 cr | - |
| WING-B | NA | Rs 2.77 cr | - |
| WING-C | NA | Rs 2.08 cr | - |
| WING-D | NA | Rs 2.06 cr | - |
| WING-F | NA | Rs 2.06 cr | Rs 29.19 lakh |
| WING-G | NA | Rs 1.75 cr | - |
| WING-A | NA | Rs 1.39 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ROOFLINE DESIGN STUDIO |
| Engineer | MANISH MARUTI RAUT |
| Chartered Accountant | UMESH WAMAN BADGUJAR |
| Chartered Accountant | SWAPNIL TODKAR |
| Chartered Accountant | Vinayak Kamruti & Associates |
| Partner | Role in project |
|---|---|
| SAPTARSHI BUILDCON | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterwe would like to inform this authority that there is a delay in the construction of the building due to lack of labour, availability of construction materials and rainy season.we have updated all the project details time to time. There is delay caused for almost 6 months in the construction due to some paperwork related to the project such as revised commencement certificate and revised sanction plan.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Jun 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Jul 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Jul 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 May 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2030
Documents filed96
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect Form 2.pdf | 10 Aug 2026 |
| Withdrawal Update Form 2File: Engineer Certificate Form 2.pdf | 10 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 kamalbaug.pdf | 10 Aug 2026 |
| Form 2A (FY 2025-2026)File: Form 2A (5).pdf | 10 Aug 2026 |
| Form 1File: Form 1 kamal baug.pdf | 8 Aug 2026 |
| Form 2File: Form 2 kamal baug.pdf | 8 Aug 2026 |
| Form 3File: Form 3 kamalbaug.pdf | 8 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold inventory (1).pdf | 8 Aug 2026 |
| Form 1File: FORM 1.pdf | 14 Apr 2026 |
| Form 2File: FORM 2.pdf | 14 Apr 2026 |
| Form 3File: FORM 3.pdf | 14 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY.pdf | 14 Apr 2026 |
| Form 1File: Architech Certificate 30-09-2023_compressed.pdf | 20 Mar 2026 |
| Form 2File: form 2 -31-09-2023_compressed.pdf | 20 Mar 2026 |
| Form 3File: CA certificate -30-09-2023_compressed.pdf | 20 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: sold-booked inventory -30-09-2023.pdf | 20 Mar 2026 |
| Form 1File: Architech Certificate 31-12-2023_compressed.pdf | 20 Mar 2026 |
| Form 2File: form 2-31-12-2023_compressed.pdf | 20 Mar 2026 |
| Form 3File: CA certificate -31-12-2023_compressed.pdf | 20 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: sold-booked inventory -31-12-2023_compressed.pdf | 20 Mar 2026 |
| Form 1File: Architech Certificate 31-03-2024_compressed.pdf | 20 Mar 2026 |
| Form 2File: form 2 -31-03-2024_compressed.pdf | 20 Mar 2026 |
| Form 3File: CA Certificate -31-03-2024_compressed.pdf | 20 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: sold-booked inventory -31-03-2024.pdf | 20 Mar 2026 |
| Form 1File: Architech Certificate 30-06-2024_compressed.pdf | 20 Mar 2026 |
| Form 2File: form 2 -30-06-2024_compressed.pdf | 20 Mar 2026 |
| Form 3File: CA certificate 30-06-2024_compressed.pdf | 20 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: sold-booked inventory -30-06-2024.pdf | 20 Mar 2026 |
| Form 3File: CA certificate- 30-09-2024_compressed.pdf | 20 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: sold-booked inventory -30-09-2024_compressed.pdf | 20 Mar 2026 |
| Form 1File: Architech Certificate 30-09-2024_compressed.pdf | 20 Mar 2026 |
| Form 2File: form 2-30-09-2024_compressed.pdf | 20 Mar 2026 |
| Form 1File: Architech certificate 31-12-2024_compressed.pdf | 20 Mar 2026 |
| Form 3File: CA certificate -31-12-2024_compressed.pdf | 20 Mar 2026 |
| Form 2File: form 2 -31-12-2024_compressed.pdf | 20 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: sold-booked inventory -31-12-2024_compressed.pdf | 20 Mar 2026 |
| Form 1File: Architech certificate 31-03-2025_compressed.pdf | 20 Mar 2026 |
| Form 2File: form 2-31-03-2025_compressed.pdf | 20 Mar 2026 |
| Form 3File: CA certificate 31-03-2025_compressed.pdf | 20 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: sold-booked inventory -31-03-2025_compressed.pdf | 20 Mar 2026 |
| Form 1File: Architech certificate 30-06-2025_compressed.pdf | 20 Mar 2026 |
| Form 2File: form 2 -30-06-2025_compressed.pdf | 20 Mar 2026 |
| Form 3File: CA certificate -30-06-2025_compressed.pdf | 20 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: sold-booked inventory -30-06-2025_compressed.pdf | 20 Mar 2026 |
| Form 1File: Architech certificate 30-09-2025_compressed.pdf | 20 Mar 2026 |
| Form 2File: form 2-30-09-2025_compressed.pdf | 20 Mar 2026 |
| Form 3File: CA certificate -30-09-2025_compressed.pdf | 20 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: sold-booked inventory - 30-09-2025_compressed.pdf | 20 Mar 2026 |
| Form 1File: Architech certificate 31-12-2025_compressed.pdf | 20 Mar 2026 |
| Form 2File: Architech certificate 31-12-2025_compressed (1).pdf | 20 Mar 2026 |
| Form 3File: CA certificate -31-12-2025_compressed (1).pdf | 20 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: sold-booked inventory -31-12-2025_compressed.pdf | 20 Mar 2026 |
| Declaration about Commencement CertificateFile: format D Declaration about commencement certificate.pdf | 28 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: Details of No Encumbrances on Legal.pdf | 25 Jul 2023 |
| Details of encumbrances concerned to LegalFile: Details of No Encumbrances on Legal.pdf | 25 Jul 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation to Agreement to Sales.pdf | 25 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: Details Of Encumbrances Corncerned to Financial.pdf | 21 Jul 2023 |
| Details of encumbrances concerned to LegalFile: Details Of Encumbrances Corncerned to Financial.pdf | 21 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate REvised (1).pdf | 12 Jul 2023 |
| Proforma of Allotment letterFile: Model Allotment Draft Saptarshi Buildcon_compressed.pdf | 5 Jul 2023 |
| Proforma of Agreement for saleFile: Agreement to Sale Compressed.pdf | 5 Jul 2023 |
| Deviation Report with respect to Allotment letterFile: No Deviation इन allotment letter.pdf | 5 Jul 2023 |
| Layout approvalFile: KAMAL BAUG 01.pdf | 3 Jul 2023 |
| Layout approvalFile: KAMAL BAUG 02.pdf | 3 Jul 2023 |
| Building plan approvalFile: KAMAL BAUG 03.pdf | 3 Jul 2023 |
| Building plan approvalFile: KAMAL BAUG 04.pdf | 3 Jul 2023 |
| Building plan approvalFile: KAMAL BAUG 05.pdf | 3 Jul 2023 |
| Building plan approvalFile: KAMAL BAUG 06.pdf | 3 Jul 2023 |
| Building plan approvalFile: KAMAL BAUG 07.pdf | 3 Jul 2023 |
| Building plan approvalFile: KAMAL BAUG 08.pdf | 3 Jul 2023 |
| Building plan approvalFile: KAMAL BAUG 09.pdf | 3 Jul 2023 |
| Building plan approvalFile: KAMAL BAUG 10.pdf | 3 Jul 2023 |
| Building plan approvalFile: KAMAL BAUG 11.pdf | 3 Jul 2023 |
| Building plan approvalFile: KAMAL BAUG 12.pdf | 3 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: KAMAL BAUG 01.pdf | 3 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: KAMAL BAUG 02.pdf | 3 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: KAMAL BAUG 03.pdf | 3 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: KAMAL BAUG 04.pdf | 3 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: KAMAL BAUG 05.pdf | 3 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: KAMAL BAUG 06.pdf | 3 Jul 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 96 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep KAMAL BAUG on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BHUJBAL MALA PABAL CHOWK13,700+ in Pune
Filed coordinates, straight-line distance. 21 registered projects within 2 km.
SHREENATH MARKET CITY
OZONE INFRASTRUCTURE
SUNRISE CITY
AKASH ENTERPRISES
ECO VILLAS II
Saptarshi Properties
shikrapur Trade Centre Phase I
Pride landmarks
AMRUTKALASH
AMRUTKALASH PROPERTIES
SAI ZION
SAI BUILTCON
Builder: SAPTARSHI BUILDCON
SAPTARSHI BUILDCON has 1 registration on MahaRERA, including KAMAL BAUG. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if KAMAL BAUG is delayed beyond 31 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KAMAL BAUG?
The registered promoter entity is SAPTARSHI BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KAMAL BAUG?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for KAMAL BAUG?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KAMAL BAUG?
The professionals named in the filing: Architect: ROOFLINE DESIGN STUDIO; Engineer: MANISH MARUTI RAUT; Chartered Accountant: UMESH WAMAN BADGUJAR; Chartered Accountant: SWAPNIL TODKAR; Chartered Accountant: Vinayak Kamruti & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KAMAL BAUG?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback